The cédula de habitabilidad is the document that says a property is legally fit to live in. In Catalonia you need a current one to sell, to let, or to connect utilities. A surveyor inspects, certifies, and we file it with the Generalitat.
The cédula d’habitabilitat — habitability certificate — is a Catalan regional document confirming that a dwelling meets the minimum standards to be lived in: floor area, ceiling height, ventilation and natural light, a bathroom and a kitchen, and a water and electricity supply. It is issued by the Generalitat, it is valid for 15 years for an existing dwelling (25 years for a new one), and it is not optional.
You will need a current one in three situations, and they tend to arrive as a surprise. Selling: the notary will ask for it at completion, and a buyer’s lawyer who does not see one will not let the signing proceed. Letting: a tenancy without one is a breach of Catalan housing law. Connecting utilities: the supply companies ask for it to open a new water or electricity contract.
It is also frequently confused with two other documents, which costs people time. It is not the energy performance certificate, which grades the property A to G and is a separate requirement — you generally need both to sell or let. And it is not the ITE, the periodic structural inspection, which applies to the building rather than to your flat.
The process itself is quick and inexpensive: a surveyor visits, measures and checks the dwelling against the standard, issues the technical certificate, and we lodge the application with the Generalitat. Where something falls short of the standard, that becomes a small piece of building work and then the same filing — and that is the only scenario in which this is slow. If you are renovating anyway, see full home renovations.

Usually a week to ten days end to end. The surveyor’s visit takes under an hour.
Selling, letting or connecting a supply. It is the same document, but the deadline is different and it changes how we sequence things.
An architect or technical architect measures the dwelling, checks ceiling heights, ventilation, natural light, the bathroom and the kitchen, and confirms the supplies. Under an hour for a flat.
The surveyor issues and signs the certificate of habitability. If the dwelling falls short on any point, you are told exactly which point and what fixing it involves.
We lodge the application and pay the official fee on your behalf. You receive the cédula without having to deal with the administration yourself.
Where something does not comply — most often ventilation to a bathroom, or a room that has been divided without light — it is a small job, and then the same filing again.
A phone call or an email in English is enough to start. We will tell you the fee and the likely timescale before anything is booked.
At a time that suits you, your tenant or your agent. We can work with a key-holder if you are not in Spain.
The surveyor certifies, we file, and the official fee is itemised separately from our own because it is not ours.
Sent to you as soon as it is issued. Ask for the energy certificate at the same time and the surveyor does both on one visit.
If you also need the energy performance certificate — and to sell or let, you do — we do both on the same visit rather than charging you twice for someone’s travel.
We file with the Generalitat and pay the official fee on your behalf. No appointment, no portal, no digital certificate needed.
We arrange access with your agent, tenant or a key-holder and send you the certificate. You do not need to fly over for an hour-long inspection.
We are a building contractor, not only a certifier. Where something does not comply we can quote the remedial work rather than handing you a problem.
Our fee and the Generalitat’s official fee are shown as separate lines, because one is a price and the other is a tax.
The certificate itself is in Catalan or Spanish because that is the legal language of the document. We tell you what it says.
Surveyor’s fees, VAT excluded. The Generalitat’s official fee is separate and is not ours.
| Service | What it covers | Indicative range (€) | |
|---|---|---|---|
| Cédula (flat) | Standard finishes, practical solution | 90 – 160 € | |
| Cédula (house) | Selected materials, best balance | 120 – 220 € | |
| With remedial work | Premium materials and high-end interior design | Depends on the work |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative fees, the Generalitat’s official fee excluded.
Inspection, certificate and filing of the cédula.
More rooms and more floor area to inspect, so a longer visit.
Renewing an expired certificate is the same process at the same fee. Check the date before you market the property.
Where something falls short, a small job and then the same filing. Usually ventilation or natural light.
Check the date on your existing cédula before you put the property on the market, not when the notary asks. An existing-dwelling certificate lasts 15 years, and an expired one can hold up a completion.
What the fee covers, and what sits outside it.
The official fee is a public charge, not our price, and we pass it through without adding anything to it. Our own fee carries VAT at 21%, because a professional service is not renovation work and the reduced rate does not apply to it — worth knowing if you are comparing this line against a building quote.
The certificate is often the last step of something bigger on this list.
All four Catalan provinces. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners and buyers ask when completion is near.
It is the Catalan regional certificate that says a property legally counts as somewhere you can live. A surveyor checks it against minimum standards — floor area, ceiling height, ventilation, natural light, a bathroom, a kitchen, water and electricity — and the Generalitat issues the document. It says nothing about the condition or quality of the property, only that it meets the legal minimum to be a dwelling.
Three situations. Selling: the notary asks for it at completion and the signing will not proceed without it. Letting: a tenancy without one breaches Catalan housing law. Connecting utilities: the supply companies want it to open a new water or electricity contract. If none of those apply you can hold an expired one indefinitely without consequence — but check the date before you market the property, not after.
Fifteen years for an existing dwelling, twenty-five for a newly built one, with the issue date printed on the certificate. If you cannot find your copy, the Generalitat holds the record and we can check it for you from the address and the owner’s details. People very often discover theirs expired during the purchase they are now trying to unwind.
No, and they are the two most commonly confused documents in a Catalan sale. The cédula confirms the property is legally habitable. The energy performance certificate grades it A to G for energy consumption. They are issued under different rules, cost different amounts, and you generally need both to sell or let. The sensible move is to have one surveyor do both on one visit; see energy certificates.
Our fee is 90 to 160 € excluding VAT for a flat and 120 to 220 € for a house, plus the Generalitat’s official fee, which we pass through at cost. End to end it is usually a week to ten days: the visit takes under an hour, the certificate is issued within a day or two, and the filing is the rest. If you have a completion date, tell us and we will say honestly whether it is achievable.
The surveyor tells you exactly which point it fails on, and in our experience it is nearly always one of two things: a bathroom with no ventilation to the outside or to a shaft, or a room that has been divided at some point so one half now has no window. Both are small building jobs. Because we are a contractor as well, we can quote the work and then re-file, rather than handing you a certificate refusal and leaving you to find a builder.
Yes, and it is routine. We arrange access with your estate agent, your tenant, a neighbour or a key-holder, the surveyor visits, and we file and send you the certificate. You do not need a digital certificate or a Spanish electronic ID for us to file on your behalf. This is one of the few pieces of Spanish paperwork that genuinely does not need you present.
Yes, and you need the tourist-let licence separately — they are different things and having one does not help you get the other. The cédula is the baseline habitability document that any dwelling needs to be let at all. Whether the property can be let to tourists is a municipal licensing question; see holiday-let renovations for what we will and will not tell you about that.
Yes, and it is the seller’s responsibility to produce it at completion. If they cannot, you have three options: delay while they obtain it, have the cost and the risk reflected in the price, or walk. What you should not do is accept a promise to sort it afterwards, because if the property turns out not to comply you will be the one paying for the remedial work on a flat you now own.
Not automatically — redecorating, a new kitchen or a new bathroom in the same place do not. It does need re-issuing if you change the number of rooms, convert something that was not a dwelling, or alter ventilation or natural light to a habitable room. Since those are exactly the things a full renovation tends to do, we build the re-issue into the programme rather than leaving you to discover it when you come to sell.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Surveyor’s visit, certificate and filing with the Generalitat. Both certificates on one visit if you need them.