Design · Barcelona + Catalonia

Interior design in Barcelona and Catalonia

Good interior design makes a home work and makes it feel right: layout, light, materials and furniture considered together. And because we also carry out the work, the design is built exactly as drawn.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Interior design

Design that gets built.

Interior design is not decoration. Decoration deals with surfaces — furniture, textiles, accessories. Interior design goes deeper: the layout, the light, the materials, the services and the furniture considered together, because a beautiful room with the wrong plan or the wrong light does not work. It is what makes a home both function and feel right.

The usual weakness is the join between design and construction. A designer draws something that the builder then interprets, and the result drifts. When the same company designs and builds, the scheme is carried out as drawn, and you do not pay twice for the same decisions. That is the main argument for combining the two.

You can still buy the design on its own: concept, drawings, materials and lighting, to be carried out by whoever you choose. Or add supervision, so that we check the work against the drawings. Or take design and build together under one fixed quote, which is the usual route. For the high-end version, see luxury renovations, and for the building work itself, full home renovations.

Circular panel carved in relief with geometric motifs beside an arch, on a pale marble floor
How it runs

An interior design project, step by step.

A few weeks for the design, then the build if you have asked us to carry it out.

01

Brief and survey

We look at the home, how you live in it and what you want to change.

02

Concept

The idea, the layout and the mood, with sketches and a materials palette.

03

Drawings

Plans, elevations and details that a builder can price and build from.

04

Materials and lighting

Finishes chosen and lighting designed, with a schedule.

05

Budget

A cost plan so that the design is tied to a figure.

06

Supervision, if chosen

We check the work against the drawings as it is built.

07

Finishing

Final details and, if wanted, home staging.

How we work

How we run a design project.

01

Free first meeting

We talk through the brief. No cost and no obligation.

02

Design fee

Quoted by area, according to the scope.

03

Design

Concept, drawings and materials.

04

Build, if chosen

A single quote for design and construction.

Why us

Why use us for interior design.

Design that is built as drawn

The same company designs and builds, so the scheme is not reinterpreted.

Costed as it is designed

You see the budget implication of each decision.

Buildable by design

Drawings that a builder can actually price and construct.

Design alone, if you prefer

You can take the drawings to any contractor.

Supervision available

We check the work against the design.

One contact

Design and build under one roof.

Prices

What interior design costs.

Design fees by area, VAT excluded.

What interior design costs — Indicative prices · VAT not included
ServiceWhat it coversFee
Design projectStandard finishes, practical solutionFrom 40 €/m²
Design and buildPremium materials and high-end interior designDepends on project
Indicative prices · VAT not included. Interior design can be bought on its own (to carry out yourself) or, more usually, combined with the renovation, where we design and build under a single quote. That way the design is delivered and you do not pay twice for the same decisions.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Full renovation · functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By service

What it costs by service.

Indicative fees, VAT excluded.

Design onlyConcept and drawingsFrom 40 €/m²

Concept, drawings, materials and lighting for you to build with whoever you choose.

Design and supervisionDesign and controlFrom 60 €/m²

As above, and we supervise the work so that it is built as designed.

Design and buildEverything togetherDepends on project

The usual route: we design and build under a single fixed quote.

Home stagingFinishing touchesAsk us

Final styling to live in, or to sell or let.

The fee covers the design. Furniture, art and fittings you buy are separate, and we can advise on them.

No small print

What is included and what is not.

The scope of an interior design project, and what is separate.

✓ Included in the price

  • Brief and survey
  • Concept and layout
  • Drawings and details
  • Materials and finishes schedule
  • Lighting design
  • Cost plan
  • Supervision, if chosen

✕ Not included — quoted separately

  • The building work, quoted separately
  • Furniture, art and accessories
  • Architect’s and engineer’s fees where a full project is legally required
  • Permits and council taxes
  • Photography and styling for marketing
  • Home automation equipment, unless itemised

VAT is shown as its own line — normally 21% on professional fees.

Where we work

Where we design.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about interior design.

Can I buy just the design, without the building work?

Yes. You can commission the design on its own — concept, drawings, materials, lighting and a furniture plan — and have it built by whoever you choose. Most people, though, take design and build together, so that what is designed is carried out as drawn.

What is the difference between interior design and decoration?

Decoration deals with the surface: furniture, textiles, accessories. Interior design goes further: layout, light, materials, services and furniture considered as a whole. It is what makes a home work, not just look good.

How much does interior design cost?

From about 40 €/m² for a design project and from about 60 €/m² with supervision of the works, excluding VAT. If you take design and build together, the design is built into the price of the renovation. For a 90 m² home, design alone starts at around 3,600 €.

Can you work with my own architect or designer?

Yes. We build to their drawings, flag anything that will not work on site early, and keep one site manager as their point of contact. See luxury renovations for how we work with designers on high-end projects.

Do you also supply the furniture?

Furniture, art and fittings are separate from the design fee. We can suggest suppliers and advise on budgets.

Free quote

Talk to us about your home.

Free first meeting anywhere in Catalonia. Design alone, or design and build.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →