A Spanish chalet is a detached or semi-detached family house with a garden — not an Alpine hut. It means a lot of floor area to insulate, heat and maintain, plus an outdoor space to live in. We renovate the inside and the outside so it costs less to run and is better to live in.
In Spain a chalet means a detached or semi-detached house with its own garden, and most of the ones around Barcelona — in Sant Cugat, the Vallès, the Maresme and the Baix Llobregat — were built between the 1980s and 2000s, when insulation was not a priority. The result is a house with plenty of character and plenty of floor area, and winter heating bills that alarm people.
So the first thing we look at is not the bathroom tiles. It is the building envelope and the services. Insulating the roof and the walls, replacing old windows with thermally broken frames, and moving the heating from oil or gas to an air-source heat pump with underfloor heating changes how the house feels, and cuts the running cost from the first bill. Kitchens and bathrooms come after that.
Then there is what makes a chalet a chalet: the garden, the pool, the porch and the garage. We fold all of it into one project and one quote, with a single site manager coordinating inside and outside, so you do not end up with five contractors and nobody accountable. For a large, high-end home on the coast, see villa renovation; for a house in a village or a terrace, house renovation.

Three to seven months for a typical house. The envelope and the services come first because everything else depends on them.
We survey the house and look at where it loses energy — roof, walls, windows, thermal bridges — and what the heating and cooling actually need. Drawings and a fixed quote follow.
Roof and façade insulation, sealing of thermal bridges and replacement of old windows with thermally broken frames. This is the phase that transforms the comfort of a big house.
Air-source heat pump, underfloor heating and a renewed electrical, plumbing and drainage installation, with electrical certificate.
Flooring, doors, staircase, fitted wardrobes, painting and, where included, basic home automation for climate, blinds and lighting.
Garden, porch, pool and garage, either in the same phase or in a second one, depending on budget and season.
An energy performance certificate before and after the works, final clean and a written warranty.
We visit, look at the house, the garden and the plot, and listen to how you live. Free and without obligation, anywhere in Catalonia.
Interior and exterior in a single itemised quote, with the outside spaces priced separately so you can phase them.
One person coordinates every trade inside and outside, with progress photographs. No gap between the builder and the pool contractor.
Certificates and a written warranty on the work. The house comes with its before-and-after energy certificates.
We deal with insulation, windows and heating before finishes, so the house is cheaper to run as well as nicer to look at.
House, garden, porch, pool and garage in one programme with one person responsible, instead of several contractors each blaming the last.
Air-source heat pumps with underfloor heating are what we install most in big houses, because the numbers work for them.
You see the change in the rating that the works have achieved, and the document is there when you sell or let.
Interior first and outside next summer, or the other way round. We plan the sequence so each stage stands up on its own.
We work in the Vallès, the Maresme and the Baix Llobregat, and we know the councils and the building types.
Per square metre of floor area, VAT excluded. Outdoor works are quoted separately.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 530 – 670 €/m² | |
| Mid-range | Selected materials, best balance | 780 – 990 €/m² | |
| High specification | Premium materials and high-end interior design | 1,090 – 1,380 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges for a full renovation, VAT excluded.
Terraced and semi-detached houses. Most of the budget goes on the envelope and the services.
The most common size. Two floors, several bathrooms, an open kitchen and climate control for the whole house.
A lot of floor to insulate and heat. At this size, energy efficiency is the best investment in the job.
Pool, porch, pergola and landscaping, quoted separately and easily left to a second phase.
The things that move these figures most are how much of the envelope needs doing and how much of the garden you want to change. A house that already has decent windows and a sound roof costs noticeably less than one with single glazing and an uninsulated roof, which is why the survey looks at the envelope before anything else.
The scope of a turnkey detached house renovation, and what normally sits outside it.
VAT is shown as its own line. Energy-efficiency work can qualify for grants or tax deductions depending on the scheme in force; we tell you what is available when we quote, and we do not promise one that is not.
Interior, envelope, services and outside spaces, coordinated as one job.
Detached houses in the Vallès, the Maresme, the Baix Llobregat and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about renovating a detached house.
Yes. We treat the house and the outside as one project and quote them together, with the outside spaces itemised separately so you can phase them. A single site manager coordinates the interior and the exterior, so the pool contractor, the landscaper and the builder are not three separate companies with no one in charge. See terraces and, for pools, swimming pool construction.
In a large house, usually yes. A heat pump delivers several units of heat for each unit of electricity it uses, and it also cools in summer, which an oil or gas boiler does not. It works best with underfloor heating or low-temperature radiators and a well-insulated envelope, which is why we do the envelope first. It is not the right answer in every house, and we tell you if yours is not a good candidate. See air conditioning and heat pumps.
Start with the envelope, not the radiators. An uninsulated roof and single-glazed or poorly sealed windows lose most of the heat, and a bigger boiler just burns more fuel to lose it faster. Insulating the roof and façade, sealing thermal bridges, fitting thermally broken windows and then replacing the heating usually transforms a cold house. We survey where it is losing energy and put the measures in order of effect per euro.
In stages: a deposit on signing, payments at the end of each completed phase, and a final payment at handover. Never the full amount up front. Outdoor works are invoiced separately from the interior, so if you phase the job each stage has its own schedule.
Possibly. It depends on the municipality’s plan: the buildable volume on your plot, setbacks from the boundary, height limits, and local rules on pools. We check the planning position before drawing anything, because it decides whether an extension or a pool is possible at all, and we say so plainly if it is not.
Yes. Sant Cugat, Cerdanyola, Sabadell, Terrassa, the Maresme coast and the Baix Llobregat are areas we cover, and we know the local councils and the typical construction of each area. We also work across the rest of Catalonia. See where we work.
Three to seven months on site for a typical detached house, plus time for drawings, permits and ordering. The envelope and services take the longest and cannot be rushed. If you add outdoor works, we say whether they run alongside or after, which depends mostly on the season.
If it includes insulation, windows and a more efficient heating system, very likely, and we show you the change by issuing an energy performance certificate before and after the works. The rating is an estimate calculated from the property’s features, so what it reflects is the measures installed rather than how you use the house. See energy performance certificates.
Sometimes. Grants and tax deductions for energy-efficiency improvements have been available at various points and the schemes change from year to year. We tell you what is available when we quote, and we will not budget on a grant that is not currently open. It is worth asking before you commit, because some schemes require an energy certificate showing the starting point.
For a limited, phased job, sometimes. For a full renovation, we usually recommend moving out for the main works: dust, noise and trades needing clear access to whole floors make it uncomfortable and slow. We give you an honest view at the quote stage of what living on site would mean.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. Interior and outside spaces in one itemised quote.