The staircase is the most visible and most used element of a multi-storey home. Changing the treads, the balustrade, the lighting or opening it up transforms the space and brings in light, and sometimes it is also a matter of safety.
In a house or a duplex, the staircase is the centre of the plan, and it often looks as old as the building. The good news is that a staircase is one of the few renovations where a modest budget makes a dramatic change: new treads, a new balustrade and good lighting can transform it without touching the structure.
The cheaper end is a facelift: cladding the treads and risers in timber, porcelain or microcement, a new balustrade, and lighting under the nosings. The expensive end is structural: opening the stairwell for light, moving the stair, or building a new one. That is a different job with a calculation, a project and sometimes a licence, and it is priced separately.
There is also a safety angle. Worn treads, a low or loose balustrade and poor lighting are where falls happen, and in a communal stair they are the building’s legal responsibility. If you are also changing the layout, see duplex renovation; for the common stair of a block, building entrances.

One to four weeks, depending on the scope. A cladding job is quick; a structural change is not.
We look at the stair, the structure and the light, and show you what is possible at different budgets.
Opening or moving the stair needs a calculated structural solution, and sometimes a licence.
Existing finishes removed or prepared, and the structure repaired.
New cladding in timber, porcelain or microcement, or a new stair in timber, metal or glass.
A balustrade of the right height and strength for the household and the regulations.
Lighting under the nosings or on the wall, so the stair is safe at night.
Painting, snagging and handover.
We visit and show you the options. No cost and no obligation.
An itemised quote, with any structural item priced separately.
One person coordinates the joiner, the electrician and the finishers.
A written warranty.
A cladding and balustrade change is the most rewarding money you can spend in a multi-storey house.
Opening or moving a stair rests on a calculation, not a guess.
Balustrade height, tread finish and lighting specified for safety.
A facelift, a new stair or an opened stairwell, priced side by side.
Joinery and finishes made carefully, because a stair is looked at every day.
Every trade coordinated by one person.
Indicative ranges, VAT excluded.
| Work | What it covers | Indicative range (€) | |
|---|---|---|---|
| Cladding the treads | Standard finishes, practical solution | 1,500 – 4,500 € | |
| New balustrade | Selected materials, best balance | 1,200 – 5,000 € | |
| New stair / opening | Premium materials and high-end interior design | From 6,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
New treads, balustrade and lighting. The most rewarding change.
A new staircase made to measure in timber, metal or glass, in a house or duplex.
Cladding, balustrade, LED lighting and an accessible route.
Lightening or opening the stairwell for light, with a structural calculation, priced separately.
In a communal stair the work is the residents’ association’s decision and needs a vote. In a private house or duplex it is yours, although opening the slab needs a technician’s signature. See permits and drawings.
The scope of a staircase renovation, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
A staircase connects joinery, lighting and sometimes structure.
Staircases across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about staircases.
Yes, and it is the best-value option. New treads and risers over the existing structure, a new balustrade and lighting transform the stair without any structural work. It is quick, it is contained and it is far less expensive than rebuilding.
Often. Lightening an enclosed stair by opening a wall or replacing it with glass can bring light deep into the house. It may involve a structural element, so it needs a calculation and sometimes a permit. We assess it at the survey.
It depends on use and look. Timber is warm and repairable. Porcelain is hard-wearing and easy to clean, but cold and can be slippery. Microcement is seamless and contemporary but needs a good installer. Metal and glass are striking and need careful safety detailing. We bring samples to the survey.
Roughly 1,500 to 4,500 € to clad the treads, 1,200 to 5,000 € for a new balustrade, and from 6,000 € for a new or opened stair, excluding VAT.
One to four weeks depending on the scope. A cladding job is a few days; a structural change takes longer.
In stages tied to completed work: a deposit on signing, payments at the end of each phase and a final payment at handover.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. Options at different budgets, priced side by side.