Service · Barcelona + Catalonia

Converting a commercial unit into a home in Catalonia

Ground-floor shop units sell for far less per square metre than flats, which is why converting one is tempting. It can be an excellent buy. It is also a legal process before it is a building one — and the legal part is where these projects fail.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Change of use

Why the licence comes before the builder.

A ground-floor commercial unit — a local — usually trades for less per square metre than a flat in the same building. Convert it into a legal dwelling and you may capture some of that gap, depending on the building, the area and what the conversion costs. That is a real and sometimes very good trade, and it is also the reason the market is full of units that someone has tried and failed to convert.

The reason they fail is that a change of use is a planning decision, not a construction one. The municipality has to permit residential use at that address, and then the unit itself has to meet habitability standards: minimum floor area and ceiling height, natural light and ventilation to habitable rooms, and in many municipalities a minimum distance from the street or a requirement that bedrooms do not face directly onto it. Some units can never comply, whatever you spend.

So the order of work is: feasibility study first, then drawings, then the licence, then build. The feasibility study is a few thousand euros and it is the best money in the whole project, because it is the only way to find out whether the rest of it is possible. We will not quote you a build on a unit whose change of use has not been established, and you should treat anyone who does with suspicion.

The construction itself costs more per square metre than renovating a flat, because nothing exists yet: no domestic services, no insulation, no openings in the right places, and often a floor slab that needs levelling or a damp problem at street level. Against that, you are starting with a blank space and can plan the layout properly. See full home renovations for what the build itself involves and permits and drawings for the paperwork.

Empty ground-floor living room with a glazed aluminium door opening onto a courtyard, large-format flooring and a pendant bulb; a broom and cleaning bucket in the foreground
How it runs

A change of use, phase by phase.

Nine to eighteen months in total, and only four to six of those are building. The licence is the long pole and it is not in our control.

01

Feasibility study

Before anything else: does the municipality permit residential use here, and can this unit physically meet habitability standards? A technical architect checks the planning position, the ceiling heights, the façade and the ventilation. This can come back as no, and it is far better to hear it now.

02

Drawings and the change-of-use application

A full technical project for the change of use, submitted to the council. Processing times vary by municipality from a few months to well over a year, and no contractor can shorten them.

03

Strip-out and preparation

Shopfront out, old commercial fit-out removed, the slab investigated and the space taken back to structure.

04

New openings, insulation and damp-proofing

Forming the openings that provide natural light and ventilation to habitable rooms — usually the single most technically demanding part — plus insulating the envelope and dealing with damp at street level.

05

Domestic services from nothing

Water, waste connected to the building’s stack, a domestic consumer unit with certification, heating and ventilation. A commercial unit has none of this in a usable form.

06

Layout, kitchen and bathrooms

The internal layout built to the approved drawings, with the kitchen and bathrooms positioned around where the waste can actually fall.

07

Finishes and handover

Flooring, joinery, painting and fittings, then the final inspection, the habitability certificate and handover with warranty.

How we work

How we run a conversion.

01

Survey and a straight answer

We visit the unit with a technical architect and tell you whether this is worth pursuing before you pay for anything. Free, and sometimes the answer is no.

02

Feasibility study and drawings

A proper feasibility study, then the change-of-use project. Quoted separately from the build, because you should be able to stop after it.

03

Licence and build

We file the application and handle the council, then build to the approved drawings with one site manager once consent is in.

04

Handover with the certificate that matters

The unit is handed over as a legal dwelling with its habitability certificate and energy certificate — without which you cannot let it or sell it as a home.

Why us

Why use us for a conversion.

Feasibility before anything else

We check whether the change of use is achievable before you spend on drawings, and we tell you when it is not.

Technical architects who know this

Change of use is a specialist planning process with different rules in every municipality. We work with people who do it regularly rather than learning on your project.

Light and ventilation, solved properly

Forming compliant openings in a ground-floor unit is the hardest technical part of these jobs and the one that gets bodged. We design it before we price it.

Damp at street level, taken seriously

A ground-floor slab against earth behaves nothing like a first-floor flat. Drainage and damp-proofing are designed in, not patched later.

Separate quotes you can stop between

Feasibility, project and licence, and build are quoted separately. You are never committed to the next stage to find out about this one.

A legal dwelling at the end

Handover with the habitability certificate. A converted unit without one is not a home, whatever it looks like.

Prices

What a conversion costs.

Per square metre of floor area for the building work, VAT excluded. The project and licence are quoted separately.

What a conversion costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
FunctionalStandard finishes, practical solution700 – 1,000 €/m²
High specificationPremium materials and high-end interior design1,400 – 2,200 €/m²
Indicative prices · VAT not included. Converting a unit costs more per square metre than renovating a flat because everything is built from nothing — services, insulation, openings — and because you have to form new openings to meet the light and ventilation standards. The change-of-use project and licence are quoted separately, from around 3,000 €, and that is the stage you should pay for first and decide on before committing to anything else.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate56,000 – 80,000 €Functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of unit.

Indicative ranges for the conversion works, VAT and the licence process excluded.

Small unitUp to 50 m²40,000 – 90,000 €

Enough for a studio or a one-bedroom flat. Getting compliant light and ventilation into it is the real challenge, not the finishes.

Medium unit50 – 90 m²65,000 – 145,000 €

The most common format for a two-bedroom home, sometimes with a courtyard at the back — which, if it exists, solves the light problem and transforms the unit.

Large unitOver 90 m²From 110,000 €

A generous loft-style home, or more than one dwelling if the planning permits — which is a separate and much harder application.

Change of useProject + licenceFrom 3,000 €

Feasibility study, change-of-use project and submission. Quoted and paid separately, and the first thing to do.

None of these figures mean anything until the change of use is established. A unit that cannot legally become a dwelling is worth what a commercial unit is worth, no matter how well it is finished — and that is the risk you are carrying between purchase and consent. If you are bidding on a unit now, have us look at it first.

No small print

What is included and what is not.

What the conversion works cover, and what sits outside them.

✓ Included in the price

  • Strip-out of the commercial fit-out and shopfront
  • Slab investigation, levelling and damp-proofing
  • Forming new openings for light and ventilation
  • Insulating the envelope
  • New water supply and connection to the building’s waste stack
  • Domestic electrical installation with certificate
  • Heating, cooling and mechanical ventilation
  • New internal layout to the approved drawings
  • Kitchen and bathrooms
  • Flooring, joinery, painting and fittings
  • External joinery and security to the new openings
  • Final inspection and a written warranty

✕ Not included — quoted separately

  • Feasibility study, change-of-use project and licence fees
  • Purchase of the unit and its taxes
  • Works to the building’s structure or façade requiring the residents’ association’s consent
  • Reinforcement of the building’s waste stack or riser, if the building requires it
  • Appliances and loose furniture
  • Council taxes, planning fees and professional fees

VAT on a conversion is usually 21%, not 10%, and this catches people out badly. The reduced rate applies to the renovation of an existing dwelling; a commercial unit is not a dwelling until the change of use completes, so the work that makes it one is generally taxed at the standard rate. We state the rate we are applying and why on the quote, before you sign.

Where we work

Where we convert units.

Barcelona and the metropolitan belt, where ground-floor units are most common. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What buyers ask before bidding on a commercial unit.

Can any commercial unit be turned into a flat?

No, and this is the question that matters most. The municipality has to permit residential use at that address, and the unit has to meet habitability standards: minimum area and ceiling height, natural light and ventilation to every habitable room, and in many municipalities rules about bedrooms facing the street or a required setback. A deep unit with one frontage and no rear courtyard often cannot comply at any price. A feasibility study is the only way to know, and it costs a fraction of finding out the hard way.

How much does the whole thing cost, including the paperwork?

The building work is 700 to 2,200 €/m² excluding VAT, so roughly 65,000 to 145,000 € for a 70 m² unit at mid-range specification. On top of that, the feasibility study, change-of-use project and licence start around 3,000 € and can be more on a complex unit, plus council fees. Budget 21% VAT rather than 10% unless we have confirmed otherwise in writing.

How long does the licence take?

Months, and sometimes well over a year. It varies enormously by municipality and we have no control over it — anyone promising you a timescale for a council decision is guessing. What we can control is submitting a complete, correct application first time, because incomplete submissions are the most common cause of long delays. Plan your financing around the licence, not around the build.

Is it actually a good investment?

It can be very good, and it carries a real risk that renovating a flat does not. The upside is the price gap: units usually trade for less per square metre than flats in the same building. The risk is that between purchase and consent you own a commercial unit, and if consent is refused you still own a commercial unit — now with a conversion budget you cannot spend. The way to manage that is a feasibility study before you buy, or a purchase conditional on the change of use.

What about light and ventilation in a deep unit?

This is the technical heart of the job. Habitable rooms need natural light and ventilation, which in a ground-floor unit usually means forming new openings in the façade or opening up to a rear courtyard or light well. Whether you are allowed to alter the façade is a question for the council and the residents’ association, and whether the structure permits it is a question for the engineer. Where there is a rear courtyard the problem is usually solvable; where there is not, often it is not.

Do I need the residents’ association’s permission?

Frequently yes, and it is worth checking the statutes before you buy. Altering the façade needs their consent. Some buildings’ statutes expressly restrict changing the use of ground-floor units, which is enforceable against you. And if the conversion loads the building’s waste stack or riser beyond what it was sized for, that becomes a shared matter too. We check the risers at survey; the statutes are for your lawyer.

What is damp like at street level?

Different from a flat and it needs designing for rather than patching. A ground-floor slab sits against earth, so you get rising damp through the slab and the lower walls, and often lateral damp from the pavement side. The answer is a proper damp-proof membrane under a new slab, perimeter drainage where it is possible, and ventilation — not a coat of waterproof paint. It is in the quote because leaving it out is why some conversions smell wrong a year later.

Can I convert a unit into more than one flat?

Sometimes, and it is a considerably harder application than a single dwelling — each unit has to independently meet habitability standards, and creating new dwellings touches minimum-size rules and sometimes density limits in the local plan. It is also more likely to run into the residents’ association, since it changes the number of units in the building. Worth exploring on a large unit, but never worth assuming.

Will I get a habitability certificate at the end?

That is the entire point, and yes — once the change of use is granted and the work is built to the approved drawings, the unit is certified as a dwelling. Without the certificate you cannot let it, sell it as a home, or in practice mortgage it. Any conversion that ends without one has not actually been completed, whatever it looks like inside.

Should I have you look at a unit before I bid?

Yes, and it is free. We will walk it with you, give you a view on whether the change of use is plausible, and tell you roughly what the build would cost. On this particular kind of purchase that information changes what the unit is worth to you more than it does on any other property type. Ask for a survey.

Free quote

Find out if your unit can be converted.

Free survey, including before you buy. Feasibility quoted separately so you can stop after it.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →