Renovations · Tarragonès

Full home renovations in the Tarragonès: Roman Part Alta, Eixample and coast

We renovate in Tarragona — from the Roman and medieval Part Alta to the Eixample — and on the coast of Salou, Torredembarra or Altafulla. We know the heritage, the Eixample and the season’s apartments. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Tarragonès
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in the Tarragonès
Warrantyon the work
Renovations in the Tarragonès

Renovating in the Tarragonès,
with no surprises.

Tarragona keeps one of the most important Roman ensembles in Europe (a World Heritage Site): the Part Alta — wall, cathedral, medieval centre — is heavily regulated and any job may run into archaeological remains. Around it, the Eixample of early-twentieth-century buildings and a coast of apartments and second homes (Salou, La Pineda, Torredembarra, Altafulla). We know that housing stock and its regulations, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Work in progress shower tray with textured mosaic and unfinished installation pipes
Who it is for

Full renovations built around you.

These are the people we mostly work with in the Tarragonès. If you recognise yourself in one of them, we are a good fit:

Owners buying an older home

You have just bought — or are about to — an older building or house and want to make it yours, with new services and no surprises.

Families who want to re-plan their home

You need more light, one more bedroom or an open kitchen: we reorganise the layout so the house fits the way you live.

Investors looking to add value

You buy to renovate and sell or to let: we balance cost and finishes to get the most value out of the property.

Second-home owners

You are preparing a holiday home or a rental: a durable, low-maintenance renovation, with the habitability certificate and the energy certificate in order.

By type of building

Every building in the Tarragonès calls for a different renovation.

Restoring in the Part Alta and renovating an apartment in Salou are very different jobs. We fit the renovation to your type of home.

01

Tarragona’s Part Alta

A heavily protected Roman and medieval centre, with a wall and possible archaeological remains: careful restoration, heritage paperwork and narrow access.

02

Tarragona’s Eixample

Early-twentieth-century buildings with high ceilings and mouldings: we renew services and layout while keeping what gives value.

03

Holiday apartments on the coast

Salou, La Pineda, Vila-seca: a quick, durable renovation of kitchen, bathroom and efficiency, resistant to salt air and ready to let.

04

Villas and historic centres on the coast

Altafulla, Tamarit, Torredembarra: village houses and villas by the sea, with historic charm and outdoor space.

How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Why Tu Nuevo Piso

Why renovate with us in the Tarragonès.

We know the housing stock here

From the stone masía to the flat of the 1970s: we know what each type of building in the Tarragonès hides and what has to be renewed whatever happens.

Planning rules and the council

We file works notifications and licences with the relevant council, and coordinate with the community when common elements or the façade are touched.

A dedicated site manager

A single contact for the whole renovation, with regular photos and video of progress. No chasing five trades.

Fixed quote

A fixed price broken down item by item after the survey. What we sign is what you pay, with no last-minute extras.

Trusted trades in the area

Bricklayers, plumbers, electricians and joiners we already know, under one contract and one programme.

Warranty and technical support

A written warranty on the work, with a registered technical architect when the project needs one.

Prices

What it costs to renovate in the Tarragonès.

Indicative ranges in the Tarragonès, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in the Tarragonès — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in the Tarragonès

Restoring in the Part Alta does not cost the same as renovating an apartment in Salou. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

In Tarragona’s Part Alta the work lives alongside Roman heritage and protection; on the coast the coastal regulations count. We handle the paperwork with each council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating in the Tarragonès.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate in the Tarragonès.

From the full renovation to a single trade. These are our most requested services.

See all services →
Where we work

Tarragonès municipalities where we renovate.

We work across the whole comarca, from monumental Tarragona to the villages of the coast.

We renovate mainly in:

Tarragona — Part Alta

Protected Roman and medieval centre: careful restoration, with archaeology and heritage paperwork.

Tarragona — Eixample

Buildings of character from the early twentieth century that we renovate inside while keeping mouldings and galleries.

Salou and La Pineda

Holiday apartments: a quick, durable, low-maintenance renovation, resistant to salt air.

Altafulla and Torredembarra

Historic centres and villas by the sea, between the residential and the stately.

And also in:

SalouVila-secaTorredembarraAltafullaConstantíLa CanonjaEl CatllarRoda de BeràCreixellLa Pobla de Montornès
Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in the Tarragonès: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in the Tarragonès?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. A flat or apartment of 80–100 m² usually lands between 30,000 and 60,000 €; restoring a Part Alta building goes well above that. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in the Tarragonès?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in the Tarragonès?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

Can you renovate in Tarragona’s Part Alta?

Yes, with the care it demands. It is a setting of heavily protected Roman and medieval heritage, where a job can come across archaeological remains: we coordinate with the heritage authorities, apply for the authorisations and plan access along narrow streets.

Do you renovate apartments in Salou or La Pineda for letting?

Yes. We carry out quick, durable renovations — kitchen, bathroom, floor and efficiency — resistant to salt air, with the habitability certificate and the energy certificate up to date so you can let.

Which municipalities in the Tarragonès do you work in?

Across the whole comarca: Tarragona, Salou, Vila-seca, Torredembarra, Altafulla, Constantí, La Canonja and the rest of the towns.

Free quote

Ask for your quote, no strings attached.

A free technical visit in the Tarragonès and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →