Cool in summer, warm in winter and hot water all year, with the least energy. We install air conditioning, heat pumps and underfloor heating sized for your home, with support and tax deductions available for efficiency.
Barcelona summers are hot enough that air conditioning has moved from luxury to normal, and the same technology — a heat pump — can heat in winter. An air-source heat pump (aerotermia) extracts heat from outside air and delivers several units of heat for each unit of electricity, which is why it is replacing gas boilers in new and renovated homes.
There are two ways to deliver the air. Split units put a wall-mounted indoor unit in each room you want conditioned: the simplest and cheapest. Ducted systems hide the machine in a false ceiling and distribute air through grilles: more even and discreet, but they need ceiling space. The third route is a hydronic heat pump feeding underfloor heating, which does heating, cooling and hot water in one system.
The sizing is the whole art. An oversized unit cycles, wastes energy and feels clammy; an undersized one never catches up. We calculate the load room by room. Installing during a renovation is much cheaper than retrofitting, because the pipework and ducts can be hidden. See heating, energy efficiency and full home renovations.

A day or two for splits; one to three weeks for ducts or a heat pump with underfloor heating.
We calculate the heating and cooling load room by room.
Splits, ducts or a heat pump with underfloor heating, matched to the home and budget.
Ducts or pipework, and the electrical supply.
Indoor and outdoor units installed and connected.
Drainage for condensation and care over where the outdoor unit sits, so it does not disturb neighbours.
The system charged, tested and balanced.
Certificates, a demonstration and warranty.
We visit, measure and calculate. No cost and no obligation.
The systems that suit your home, priced side by side.
One site manager coordinates the trades.
Tested, certified and guaranteed.
Room by room, not by rule of thumb.
We tell you when insulation should come first.
Ducts and pipework hidden where the renovation allows.
Away from neighbours’ windows, with vibration isolated.
Reduced VAT, grants and tax deductions where they exist.
Refrigerant and electrical work by authorised installers.
Indicative ranges for a typical home, VAT excluded.
| System | What it covers | Indicative range (€) | |
|---|---|---|---|
| Split air conditioning | Standard finishes, practical solution | 1,500 – 5,000 € | |
| Ducted air conditioning | Selected materials, best balance | 4,000 – 9,000 € | |
| Heat pump + underfloor heating | Premium materials and high-end interior design | 9,000 – 20,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Air conditioning by unit. The simplest and least expensive option.
Ducted air with grilles; more even and discreet.
Efficient heating, cooling and hot water, with underfloor heating.
Heat pumps and underfloor heating can attract support and deductions that reduce the cost.
In a flat, the outdoor unit needs a place that the community accepts, and sometimes the council. Façade-mounted units are restricted in many buildings. We check the statutes before we specify.
The scope of a climate-control installation, and what is separate.
VAT is shown as its own line, and heat pumps and underfloor heating can attract reduced VAT, support and tax deductions in some cases. We tell you what is available when we quote.
Climate control connects heating, insulation and electrics.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about air conditioning and heat pumps.
A heat pump extracts energy from the outside air and delivers heating, cooling and hot water using much less energy than gas or oil. Combined with underfloor heating it gives excellent, even comfort. It is the most efficient option available and is the one with most support behind it. It works best in a well-insulated home.
Splits are simpler and cheaper, ideal for conditioning specific rooms. Ducted air is more even and discreet — you only see the grilles — but needs a false ceiling. We advise according to your home and budget.
Often. Heat pumps and underfloor heating have attracted reduced VAT, EU-funded grants and an income tax deduction for energy-efficiency improvements, at various times. Schemes change, so we check what is available when we quote and will not budget on a scheme that is not open.
Roughly 1,500 to 5,000 € for splits, 4,000 to 9,000 € for ducts and 9,000 to 20,000 € for a heat pump with underfloor heating, excluding VAT.
Yes, much. Ducts and pipework can be hidden in ceilings and floors, and the electrical supply can be sorted at the same time. Retrofitting costs more and looks worse. See full home renovations.
On a roof, terrace or balcony, or in a patio, where the community and the council allow. In many buildings façade-mounted units are restricted. We check the statutes first and place the unit where it will not disturb neighbours.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey and load calculation anywhere in Catalonia.