Service · Barcelona + Catalonia

Holiday-let renovations in Catalonia

In a short-let property the renovation has to earn its money back. It has to photograph well, survive heavy turnover, and be finished fast so the calendar can open. That is a different brief from renovating a home, and we price it as one.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Holiday-let renovation

Renovating for yield, not for yourself.

A short-let renovation is judged by three numbers: what it cost, what it lets for, and how many nights it fills. Everything in the specification should trace back to one of those. That makes it a more disciplined job than renovating your own home, not a cheaper one — the money just goes somewhere different.

Where it goes is the things a guest sees in the first photograph and the first ten minutes: daylight, a bathroom that reads as new, a kitchen that looks cared for, good beds in sensible places, and lighting that is warm rather than clinical. Where it does not go is bespoke joinery, high-end appliances or anything a guest cannot tell apart from the mid-range version.

The second discipline is durability. A short-let property changes guests many times a year, and every one of them is someone with no reason to be careful. Washable paint, hard-wearing flooring, sanitaryware and brassware chosen for robustness over novelty, and no finish that marks if you look at it. The cheapest specification is almost never the cheapest over five years.

The third is speed, because every week on site is a week not letting. We plan short-let jobs around the calendar and say honestly what is achievable. One thing we will not do is tell you the licensing position: tourist-let licences in Catalonia are set municipality by municipality, Barcelona has not issued new ones for years, and whether your property can be let legally is a question for your lawyer and the council, not your builder. We will tell you what the technical requirements are once you know you have a licence.

Hallway with a white lacquered wardrobe column, light slatted flooring and an internal door at the far end
How it runs

A short-let renovation, phase by phase.

Four to ten weeks for a flat. The sequence is the same as any renovation; the difference is that we compress it deliberately and plan the long-lead items first.

01

Survey, yield assessment and drawings

We look at the property and work out where investment shows up in bookings and where it will not. Out of that comes a layout aimed at the guest count you are targeting and a fixed quote.

02

Strip-out and clearance

Out with whatever is in the way of a better layout or a better photograph. Skips and permits arranged.

03

Services

Electrics with certification, plumbing, efficient heating and cooling, and provision for genuinely good wifi — which is now among the top complaints in short-let reviews, and the cheapest to design in rather than retrofit.

04

Layout for the guest count

Bedrooms and bathrooms optimised for the number of guests you are letting to, without the property feeling crammed — which guests do notice and do write about.

05

Hard-wearing, photogenic finishes

Flooring, washable paint, kitchen and bathrooms in materials that survive turnover and still look right in the listing photographs.

06

Fixed equipment and the details

Fitted furniture, warm lighting, proper storage for suitcases, and the small things that move a review from four to five.

07

Handover ready to list

Cleaned, snagged and handed over ready to furnish and photograph. Certificates included.

How we work

How we run a short-let project.

01

Survey and yield assessment

We visit the property and work through where to invest to maximise bookings. Free, no obligation, and useful before you buy as well as after.

02

Drawings and a fixed quote

A fixed, itemised quote built around return rather than around taste, with a short written programme.

03

Fast build with one site manager

One site manager compresses the programme as far as it will honestly go, with photo updates — the practical way to follow a job if you are not nearby.

04

Ready to list

We hand the property over renovated and ready to furnish and photograph. If you want the kitchen or bathrooms done to a higher grade, they are priced separately.

Why us

Why investors use us.

Specified for return

We put money where it raises occupancy and nightly rate, and tell you where it will not be noticed. That conversation is the service.

Built for turnover

Hard-wearing, easy-clean finishes chosen for frequent changeovers rather than for a showroom.

Genuinely photogenic

Daylight, sightlines and warm lighting, because the listing photographs are what fill the calendar and they are taken in one afternoon.

Fast and turnkey

Short programmes so you start letting sooner. Particularly useful if you do not live here.

Honest about licensing

We will tell you the technical requirements for tourist use. We will not tell you that you can get a licence, because that depends on your municipality and is not ours to promise.

A fixed, itemised price

A closed price broken down by trade, so it can go straight into your return calculation.

Prices

What a short-let renovation costs.

Per square metre of floor area, VAT excluded. Furniture is not included in any of these figures.

What a short-let renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
FunctionalStandard finishes, practical solution500 – 750 €/m²
High specificationPremium materials and high-end interior design1,200 – 1,800 €/m²
Indicative prices · VAT not included. A short-let renovation costs a little more per square metre than the same work in a home, and the reason is durability and speed, not luxury: harder finishes, more robust fittings, and a compressed programme. Against that, the specification is tighter — no bespoke joinery, no premium appliances. Furniture, mattresses, linen and the listing photography are separate and are not included in any of these figures — they belong in your own model.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate40,000 – 60,000 €Functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of property.

Indicative ranges for the renovation, VAT and furniture excluded.

StudioUp to 40 m²22,000 – 45,000 €

Every centimetre worked for guest capacity and luggage storage. The highest cost per square metre of any format, because the bathroom and kitchen do not shrink.

One or two-bed apartment40 – 70 m²30,000 – 70,000 €

The most reliable format for yield: two or three double sleeping spaces properly resolved.

Family flat70 – 110 m²50,000 – 110,000 €

For groups and families, with more than one bathroom and a living space that works for six to eight people at once.

Two things sit outside these figures and both belong in your return calculation: furniture and equipment, and whatever the licence process costs you. Furnishing packages and listing photography are separate services, and we can point you towards people who provide them.

No small print

What is included and what is not.

What a turnkey short-let renovation covers, and what you will need to budget separately.

✓ Included in the price

  • Strip-out, clearance and skip permits
  • New plumbing and waste runs
  • Electrical installation with certificate
  • Efficient heating and cooling
  • Structured provision for wifi and television points
  • New layout for the target guest count
  • Hard-wearing flooring throughout
  • Washable paint throughout
  • Kitchen with units, worktop, sink and extractor
  • Bathrooms fully waterproofed, tiled and fitted
  • Fitted storage and luggage space
  • Warm, layered lighting rather than a single ceiling fitting
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Furniture, mattresses, linen and kitchen equipment
  • Listing photography and styling
  • White goods, unless itemised in your quote
  • Tourist-let licence application and legal advice
  • Smart locks and property-management hardware, unless itemised
  • Council taxes and fees where they apply

VAT is shown as its own line, and on a short-let property it needs care: work billed to a company, or on a property being prepared for a commercial letting activity, is frequently 21% rather than 10%. Tell us how the property is held and who is being invoiced, and we will apply the right rate in writing rather than assume the lower one.

Where we work

Where we renovate short-let property.

Barcelona, the metropolitan belt and the coast — the Costa Brava, the Maresme and the Garraf.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What investors ask us, including the questions we cannot answer.

Can you tell me whether I can get a tourist-let licence?

No, and you should be sceptical of any contractor who says yes. Tourist accommodation licences in Catalonia are granted municipality by municipality, Barcelona has issued essentially none for years and has moved to phase existing ones out, and coastal towns each run their own rules and caps. That is a question for a local lawyer and your council. What we can tell you, once you know where you stand, is what the technical requirements are for the property itself.

What should I spend money on, and what is a waste?

Spend it on the bathroom, the beds and the lighting. A bathroom that reads as new is the single biggest driver of review scores; good mattresses are the most common thing cheap conversions get wrong; and warm layered lighting is what makes an ordinary flat photograph well. Do not spend it on premium appliances, bespoke joinery or designer taps — a guest staying four nights cannot tell, and the review will not mention them.

How much does it cost, and what return should I expect?

The renovation runs 500 to 1,100 €/m² excluding VAT for most short-let specifications, so roughly 30,000 to 66,000 € for a 60 m² flat, before furniture and equipment, which you will need to budget separately. We will not give you a yield figure: occupancy and nightly rate depend on your location, your licence, your management and the platform, and any builder quoting you a return is making it up. Your own numbers against our fixed quote is the honest calculation.

How long before I can start letting?

Four to ten weeks on site for a flat, plus two to four weeks beforehand for drawings, permits and ordering, and then a week or two to furnish and photograph. We plan short-let jobs around your calendar and order long-lead items first. If you have a date you are letting from, tell us at the quote stage and we will say honestly whether it works.

Which finishes actually survive heavy turnover?

Porcelain or good-quality vinyl flooring rather than laminate, which swells at the joints when someone leaves a window open in the rain. Washable matt paint, in a colour you can touch up without repainting a whole wall. Solid-surface or porcelain worktops rather than laminate. Wall-hung WCs and robust single-lever taps. And no open shelving in the kitchen, which looks wonderful in photographs and is a cleaning problem fifty times a year.

Can you manage the job if I am not in Spain?

Yes. Regular photographs, written approvals by email. For this kind of job that works better than it does for a private home, because the specification decisions are commercial rather than personal — you are choosing durable and photogenic, not choosing what you want to live with.

Should I renovate for short-let or for long-let?

They pull in different directions and it is worth deciding before we draw anything. A short-let property is specified for photographs, durability and guest count. A long-let property is specified for compliance, low maintenance and a tenant living there for years, and it needs a habitability certificate and an energy certificate. If your licence position is uncertain, the safer brief is the long-let one, because it is lettable either way.

Do you handle furnishing and photography?

Not as part of the renovation — we hand the property over ready to furnish. Furnishing packages and listing photography are separate services, and we can point you towards people who provide them.

What about noise, neighbours and the residents’ association?

Worth thinking about before you commit, because it is where short-let projects most often go wrong after completion. Many Catalan comunidades have voted to prohibit tourist use in their statutes, which is enforceable. On the building side we can specify acoustic improvements to floors and party walls, which help with both complaints and reviews. On the legal side, check the statutes before you buy.

Is it cheaper to do two flats at once?

Yes — one mobilisation, one set of trades, shared skips and bulk material orders. If you own or are buying more than one unit in the same building, doing them together is usually cheaper than doing them a year apart, and we will show the difference in the quote so you can see it.

Free quote

Get a quote for your short-let property.

Free survey and yield assessment anywhere in Catalonia, including before you buy. Fixed, itemised quote.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →