Building a pool is a proper construction job: excavation, a watertight structure, filtration and services, plus the licence. We build it turnkey, so that all you have to worry about is enjoying it.
Most of what decides whether a pool is good is hidden: the excavation and the ground it sits in, the shell that holds the water, the pipework and the filtration. A pool that looks wonderful on the day it is filled and leaks, cracks or turns green two summers later usually failed in one of those places, not in the tiles.
There are three ways to build the shell. Sprayed concrete (gunitado) is the most versatile and durable: any shape and size, built in place. A prefabricated shell is quicker to install but limits the dimensions. A panel system is a middle route. Which is right depends on your plot, your access for machinery, the shape you want and your budget.
The planning side is not optional. A pool almost always needs a municipal licence and, depending on size and position, a technical project, and there are rules on distance from the boundaries and on a safety fence. Water-use rules can also tighten in dry periods, which affects when you can fill it. We handle the licence and the project. For a pool as part of a wider outdoor project, see gardens; for an existing pool that needs work, pool renovation.

Typically two to four months once the licence is granted, depending on the type of shell and the ground.
We look at the plot, the ground, the access for machinery and the planning constraints, and agree the shape, size and system.
The technical project, where required, and the municipal licence, which sets the start date.
Dug out to the design, with drainage and a sound base.
Sprayed concrete, prefabricated or panel shell, installed and made watertight.
Pipework, filtration, pumps, lighting and any heating, with a plant room.
Tile, mosaic or membrane lining, and the edging around the pool.
The safety fence, the first fill, water treatment, commissioning and a demonstration.
We visit the plot and discuss the options. No cost and no obligation.
The pool, the equipment and the surround itemised, with the licence shown separately.
One person coordinates the excavator, the shell, the pipework and the finishes.
Commissioned, explained and guaranteed.
We establish what the soil and the water table will do before the shape is fixed.
We explain sprayed concrete, prefabricated and panel against your site and budget, rather than selling one.
The project and the municipal licence, including boundaries and the safety fence.
Excavation, shell, services, lining and surround under one site manager.
Filtration and pumps matched to the volume, not undersized to hit a price.
On the construction and the waterproofing.
Indicative ranges by type of shell, VAT excluded. The licence is separate.
| Type | What it covers | Indicative range (€) | |
|---|---|---|---|
| Prefabricated shell | Standard finishes, practical solution | 15,000 – 30,000 € | |
| Built in sprayed concrete | Selected materials, best balance | 25,000 – 55,000 € | |
| Designer / infinity edge | Premium materials and high-end interior design | From 50,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges by water surface, VAT and licence excluded.
Compact family pools of about 6 × 4 metres. The system and lining set the price.
The most usual size, about 8 × 4 metres, with good filtration and edging.
Large pools and water features. Filtration and services on a larger scale.
Salt chlorination, heating, LED lighting, an infinity edge or a beach entry. Added to the price of the pool.
A pool has running costs and a safety duty that the build price does not show: electricity for the pump, chemicals or salt, cover or maintenance, and the legal requirement for a safety fence. We tell you what to expect before you commit.
The scope of a turnkey pool, and what is separate.
VAT is shown as its own line — 21% on new construction in most cases, and we confirm the rate in writing before you sign.
A pool connects groundworks, services and landscaping.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask before building a pool.
Sprayed concrete is the most versatile and durable, with any shape and size, and is the usual choice for a bespoke pool. A prefabricated shell is faster to install but limits the dimensions to what can be delivered. Panel systems sit between the two. The right answer depends on your plot, the access for machinery, your budget and what you want. We advise on your site.
Almost always, yes. A pool needs a municipal licence and, depending on its size and position, a technical project. There are also rules on distance from the boundaries and on a safety fence. We prepare the project and handle the licence, and we tell you early whether your plot allows what you have in mind.
Roughly 15,000 to 30,000 € for a prefabricated shell and 25,000 to 55,000 € for one built in sprayed concrete, excluding VAT. An infinity edge or premium equipment raises it, from 50,000 €. The licence is separate. A medium pool of 24 to 40 m² starts at about 30,000 €.
Typically two to four months once the licence is granted, depending on the type of shell and the ground. The licence itself is the council’s timetable, not ours.
More than people expect, and it is worth knowing before you build. Electricity for the pump and any heating, chemicals or salt, a cover if you want one, and maintenance. A properly sized filtration system and a cover reduce the cost considerably. We give you a realistic picture.
Not always. Rules on filling and topping up private pools can tighten in dry periods, and they vary by municipality. Check the current position when you plan the timing, and ask us — we will tell you what applies at the time.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. The licence quoted separately.