Space · Catalonia

Basement renovations in Catalonia

A basement is square metres that are almost always wasted. Renovated properly — dealing with the damp and the ventilation first — it becomes a wine cellar, a gym, a cinema room or an office. The key is the waterproofing.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Basement renovation

Dry first, then useful.

A basement is the cheapest floor area in a house, and the most difficult to make good. Everything depends on keeping water out. A basement sits against the earth on several sides, and water arrives from the ground, from the walls and sometimes up through the slab. Finishing it before it is dry produces a room that smells, peels and eventually moulds.

So the order is fixed. Waterproof and drain first, ventilate second, finish third. That means a tanking system on the walls and floor, a perimeter drain where it is possible, a sump pump where it is not, and mechanical ventilation, because a basement has no windows to air it. Only then do the finishes, the lighting and the use come into play.

What the room becomes then is a design question. A wine cellar needs stable temperature and humidity; a cinema needs sound isolation and no light; a gym needs a resilient floor and ventilation; an office needs daylight, which a basement rarely has. Whether it can be a bedroom or a dwelling depends on light, ventilation, headroom and the local rules. See damp treatment if you already have a problem.

Two underfloor heating manifolds with blue valves, pressure gauges and pump group, mounted on a white plate on a site wall
How it runs

Renovating a basement, step by step.

Three to ten weeks. The waterproofing cannot be rushed and sets the pace.

01

Survey and moisture diagnosis

We establish how water enters — through the walls, the slab or from a leak — before designing anything.

02

Waterproofing and drainage

Tanking of the walls and floor, a perimeter drain or a sump pump, and repair of any cracks.

03

Ventilation

Mechanical ventilation, because a basement has no windows to air it.

04

Floor and walls

Insulated, breathable finishes over the waterproofing.

05

Electrics and lighting

Circuits with certificate and lighting that gives the room character without windows.

06

Fit-out for the use

A cellar, gym, cinema, office or playroom, with the specific requirements of each.

07

Handover

Moisture re-checked after drying, then handover.

How we work

How we run a basement project.

01

Free survey

We find where the water comes from. No cost and no obligation.

02

Fixed quote

An itemised quote, with the waterproofing priced separately from the fit-out.

03

Build, with one site manager

One person coordinates every trade and does not skip the drying time.

04

Handover and warranty

Warranty on the waterproofing specifically.

Why us

Why renovate your basement with us.

Dry before pretty

We never finish a basement we have not waterproofed and tested.

Diagnosis first

We find the source of the water rather than treating the symptom.

Ventilation designed in

Mechanical ventilation sized for the room, which is what stops mould returning.

Fit-out for the use

Cellar, gym, cinema or office, each with its own requirements.

Honest about habitability

We tell you plainly whether the room can be a bedroom.

One site manager

Every trade coordinated by one person.

Prices

What a basement renovation costs.

Per square metre of floor area, VAT excluded.

What a basement renovation costs — Indicative prices · VAT not included
UseWhat it coversPer m² (excl. VAT)
Simple useStandard finishes, practical solution400 – 700 €/m²
Special use (cinema, cellar)Premium materials and high-end interior design1,000 – 1,600 €/m²
Indicative prices · VAT not included. The decisive item is waterproofing and damp treatment: it makes everything else possible and is never the place to economise. Uses such as a cinema or a climate-controlled cellar raise the price because of their installations. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate32,000 – 56,000 €Simple use · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of basement.

Indicative ranges, VAT excluded.

Small basementUp to 30 m²12,000 – 30,000 €

Ideal for a cellar, an office or a small room. The damp sets the starting point.

Medium basement30 – 60 m²25,000 – 60,000 €

Room for a gym, playroom or cinema, with good ventilation and lighting.

Large basementOver 60 m²From 50,000 €

Large spaces for several uses, or even a habitable area.

Damp onlyWaterproofingFrom 60 €/m²

Where the problem is damp: waterproofing, drainage and ventilation, without changing the use.

A basement that floods rather than merely damp-stains is a different problem: it needs a drainage and pumping solution, and sometimes a conversation with the neighbours or the council about groundwater. We say so at the survey.

No small print

What is included and what is not.

The scope of a basement renovation, and what is separate.

✓ Included in the price

  • Survey and moisture diagnosis
  • Tanking of the walls and floor
  • Perimeter drain or sump pump
  • Mechanical ventilation
  • Insulated breathable floor and wall finishes
  • Electrics and lighting, with certificate
  • Fit-out for the agreed use
  • Moisture check after drying
  • A written warranty on the waterproofing

✕ Not included — quoted separately

  • Climate control for a wine cellar, unless itemised
  • Cinema and audio-visual equipment
  • Excavation to enlarge or deepen the basement
  • Changing the use to a dwelling
  • Council taxes and fees
  • Furniture and decoration

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we renovate basements.

Basements across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about basements.

My basement is damp. Can it be solved?

In almost every case, yes, but the fix depends on the source: water through the walls, rising through the slab, or coming from a leaking pipe. We diagnose first, then waterproof properly with tanking, drainage and ventilation. A paint or a sealant over a damp wall is not a fix. See damp treatment.

Can I make the basement a bedroom?

Sometimes, but it is a high bar. A bedroom needs natural light, ventilation, adequate headroom and an escape route, and the local rules decide whether it counts as habitable. Many basements cannot qualify and are better as a gym, study or playroom. We tell you at the survey rather than let you spend on a room you cannot use as a bedroom.

How do I get light into a basement?

With light wells or lowered patios where the geometry allows, with large reflective surfaces and well-planned artificial lighting where it does not. A basement will not have the quality of a daylight room, but good lighting design makes a big difference.

How much does it cost?

Roughly 400 to 700 €/m² for simple use, 700 to 1,100 €/m² for a habitable room and 1,000 to 1,600 €/m² for a special use, excluding VAT. A 40 m² basement used as a habitable room comes to around 28,000 to 44,000 €.

How long does it take?

Three to ten weeks. The waterproofing needs curing time and the walls need to dry, so this cannot be hurried.

How is it paid for?

In stages tied to completed work, with a deposit on signing and a final payment at handover.

Free quote

Get a quote for your basement.

Free survey and moisture diagnosis anywhere in Catalonia.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →