Windows, terrace enclosures, shower screens and balustrades in made-to-measure aluminium and PVC. Light, strong and nearly maintenance-free, with a thermal break that really insulates from cold and noise.
Aluminium is the material of choice for large openings, terrace enclosures and anything that has to be strong, slim and weatherproof. It does not rot, it does not need repainting, and the profiles can be thin enough that the glass fills the opening. Its weakness, in the cheapest versions, is that metal conducts heat. That is what the thermal break fixes.
A thermally broken frame has an insulating strip separating the inner and outer faces of the aluminium, so the cold outside does not travel through to the inside. It is the difference between a window that sweats and chills the room and one that doesn't. For any aluminium window or enclosure facing the weather, it is the specification to insist on.
The same material makes shower screens, glass partitions, balustrades and the glazed enclosures people use to close a terrace. See window replacement for the energy and comfort questions, and terraces for what lies beneath an enclosure. Closing a balcony or terrace changes the façade, so the community and sometimes the council must agree.

Made to measure, so allow two to six weeks for manufacture, then one to three days to fit.
We measure on site, check the openings and agree profile, colour, glass and opening type.
For an enclosure or a visible change, we check the community’s and the council’s requirements.
Made to measure in the workshop.
Old units removed and the opening prepared.
Units fitted, levelled and sealed.
Seals, trims and adjustment of every opening.
We measure and show profiles and glass samples. No cost and no obligation.
A price per unit or per square metre, itemised.
A clean installation, usually in one to three days.
Warranty on the product and the fitting.
We specify it for anything that faces the weather.
Every unit built to the opening, not forced to fit.
Laminated or toughened glass where the regulations require it.
We check what the community and council allow before you order.
Quick, tidy and without unnecessary demolition.
On the product and the fitting.
Indicative ranges, VAT excluded.
| Product | What it covers | Indicative range | |
|---|---|---|---|
| Aluminium window | Standard finishes, practical solution | 400 – 900 €/unit | |
| Terrace enclosure | Selected materials, best balance | From 250 €/m² | |
| Screen / balustrade | Premium materials and high-end interior design | From 300 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Thermally broken frames with insulating glass.
Closing a terrace or balcony with glazed enclosure or a glass curtain.
Shower screens and glass partitions.
Balustrades for stairs, terraces and balconies.
A balustrade is a safety item, and its height and strength are set by regulation. We specify to the rule rather than to the catalogue picture.
The scope of a joinery job, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
Joinery connects to windows, terraces and bathrooms.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about aluminium joinery.
PVC insulates a little better and is cheaper; aluminium with a thermal break is slimmer, stronger and better for large openings, and it lasts longer without maintenance. For a normal flat window either is fine. For a big sliding door or a terrace enclosure, aluminium is usually the better engineering.
An insulating strip in the middle of the aluminium profile that stops the outside temperature travelling through the frame to the inside. Without it, the inner face of the frame gets cold in winter and condensation forms on it. With it, the frame performs close to PVC. For anything weather-facing, insist on it.
Often, with a glazed enclosure or glass curtain. It changes the façade, so you need the owners’ association’s agreement and sometimes a council licence, and the terrace beneath needs to be properly waterproofed. We check all of that before we order. See terrace renovation.
Roughly 400 to 900 € per unit, excluding VAT, for a thermally broken window with insulating glass. The size, the glass and the opening type move the figure.
Usually, yes. They are fitted over the old frame or in the existing opening, so there is little dust. We check the old frames at the survey.
In stages: a deposit when the order is placed, the balance on completion.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey and measurement anywhere in Catalonia.