A salon lives on image and experience: well-lit mirrors, basins with good plumbing, private treatment rooms and ventilation that copes with chemicals. We renovate it so that it looks right and works through a busy day.
A salon sells how people feel in the chair, and that depends on details they do not consciously notice: flattering light at the mirror, hot water that is actually hot at every basin, and air that does not smell of the last colour treatment. Most of the cost of a salon is not the decoration. It is the plumbing, the electrics and the ventilation.
Count the hot-water points first. A basin needs hot water at a reliable temperature and pressure, and several in use at once will empty a domestic water heater. Then the power: dryers, straighteners and treatment equipment all draw current at the same time, and the circuits have to cope. Then ventilation, because dyes, perming products and nail products give off vapours that need extracting rather than circulating.
For a beauty centre, the other element is privacy: treatment cabins with acoustic separation, the right lighting for each treatment and discreet access. If the premises are for another kind of business, see shops or commercial unit fit-out.

Typically three to eight weeks. The licence or notification runs in parallel.
We look at the unit, count the stations and cabins you want, and assess the water, power and ventilation you have.
Depending on the activity and the municipality, a prior communication or a licence is filed.
Previous fit-out out, then new hot-water supply, drainage, electrics and ventilation.
Basins with plumbing sized for simultaneous use, and stations with enough circuits.
Treatment cabins with acoustic separation and suitable lighting.
Mirrors with flattering light, floors, walls, reception and window.
Certificates, snagging and handover.
We visit and talk through the number of stations and cabins. No cost and no obligation.
A fixed itemised quote, with any activity project shown separately.
One site manager coordinates the trades against a short programme.
Certificates and warranty, ready to open.
Hot water at every basin simultaneously, not at one basin at a time.
Circuits planned for the dryers, treatment machines and lighting running together.
Ventilation that removes the chemicals rather than moving them around.
Acoustic separation and lighting that make a treatment room feel private.
Mirror lighting that makes clients look good, which is the best advertising a salon has.
Short programmes, because a closed salon earns nothing.
Per square metre of floor area, VAT excluded. Equipment and furniture are separate.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Basic fit-out | Standard finishes, practical solution | 400 – 700 €/m² | |
| Mid-range | Selected materials, best balance | 700 – 1,100 €/m² | |
| Designer / concept | Premium materials and high-end interior design | 1,100 – 1,800 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT and equipment excluded.
Hair salons and individual cabins. Plumbing, electrics and image set the minimum.
The most common size, with several stations, basins and cabins.
Centres with several cabins, advanced treatments or a wellness area.
Renewing the look and the lighting without heavy building work. Quick and high-impact.
If you are taking over an existing salon, the cheapest option is often keeping the plumbing and changing the image, and we will tell you honestly when that is enough.
The scope of a turnkey salon fit-out, and what is separate.
VAT is shown as its own line — normally 21% on works for a business.
A salon draws on most of this list, coordinated by one person.
Salons and beauty centres in Barcelona and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What salon owners ask.
One per basin, but the question that matters is whether they work together. Each basin draws a lot of hot water, and several in use at once will exhaust a domestic water heater. We size the heating and the supply pipework for simultaneous use, which is usually a larger heater or a dedicated one, and plan the drainage to match.
By extracting them rather than recirculating the air. Dyes, perms and nail products give off vapours that need a dedicated extraction, ideally close to where they are generated, plus a ventilation system that brings in fresh air. A salon that smells of chemicals loses customers and annoys the neighbours.
Yes. Acoustic separation between cabins, doors that close properly, lighting adjusted to each treatment and discreet access. Privacy is a large part of what a client is paying for in a beauty centre.
Roughly 400 to 700 €/m² for a basic fit-out, 700 to 1,100 €/m² for mid-range and 1,100 to 1,800 €/m² for a concept scheme, excluding VAT and equipment. A 60 m² salon at mid-range comes to around 42,000 to 66,000 € for the works.
Three to eight weeks of building. We commit to a written date because a closed salon earns nothing.
In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover. Never the full amount in advance.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. A fixed quote and a written opening date.