Services · Barcelona + Catalonia

One accountable team for every renovation.

From a full renovation to a single trade: we coordinate every craft and every permit under one site manager, with a written fixed quote and a warranty.

Category 04

Renovations by property type

Each type of home needs a different job: a flat in a period building is nothing like a house with a plot.

Built-in bath with a white mosaic front and black wall-mounted controlsProperties
Commercial unit under works with a curved built counter and an inset sink next to a large windowBusiness

Tell us about your renovation.

Free site visit and a written fixed quote anywhere in Catalonia. We reply within 24 hours.

Request a quote →
Frequently asked questions

Questions before you choose a contractor

What people ask us first, and the answers in full.

Do you run the whole job in English?

Yes. The survey, the quote, every variation, the progress updates and the handover paperwork are all in English. Our site managers speak it; the certificates themselves are issued in Spanish or Catalan because that is the legal language of the document, and we explain each one when we hand it over.

Which of these services can be done on their own?

All of them. People most often come to us for a single room — a kitchen or a bathroom — and the rest of the list is work we coordinate as part of a larger job. If you want the whole property done at once, that is a full home renovation.

Do you work outside Barcelona?

Across all four Catalan provinces. Barcelona and its metropolitan belt are where we work most, and we also take jobs on the Costa Brava, in Girona, Tarragona and Lleida. Travel is already in the quote — we do not add a surcharge once you have signed.

How do I know what my renovation will cost before I commit to anything?

Two ways, both free. Put your floor area into the cost calculator for an indicative range built from our own quotes, or ask for a survey and get a fixed itemised figure. Neither needs a deposit and neither commits you to us.

What warranty do I get?

We give a written warranty on the work itself, documented at handover rather than promised. Ask to see it before you sign — any contractor who will not show it is telling you something.

Can you handle the permits and the residents’ association?

Yes, and for most jobs it is the part clients are most relieved to hand over. We file the council notification or licence application, commission drawings where they are legally required, and put the request to the comunidad when the work touches anything shared. See permits and drawings.

✆ Call✦ WhatsAppGet a quote →