In an apartment every square metre counts and, often, so does every week. Whether you are living in it or letting it, the aim is to make the space work harder while keeping the timescale and the budget under control.
An apartment is typically a compact home — a studio, a one- or two-bedroom flat in the middle of a town — where the challenge is not how much space there is, but how much you get out of it. Layout, storage and light matter far more than in a large flat, because there is no spare corner to absorb a mistake.
Our approach is clear: gain space and function. Kitchens opened to the living room, partitions removed, made-to-measure joinery that uses every recess, fold-down beds or mezzanines where they make sense, and storage solutions that make a small apartment live like a much bigger one.
And there is a very specific case: the apartment bought to let or as an investment. There the ratio between what you spend and what it earns decides everything. We specify hard-wearing materials, keep the programme short, and hand over turnkey. If you plan to let to tourists rather than long-term tenants, the brief changes and so does the legal position: see holiday-let renovations.

Four to ten weeks for a typical apartment. Small spaces make mistakes expensive, so the design phase is where the time is best spent.
We measure precisely, because in a small flat a few centimetres decide whether a layout works. Out of that comes a plan and a fixed quote.
Out with partitions and fittings that do not earn their space.
New plumbing, electrics with certificate, and ventilation. In small flats we also plan sockets and lighting carefully, since a compact space needs them in the right places.
The new layout, with made-to-measure joinery and storage built into every available recess.
Flooring, painting, lighting and fittings, with light colours and good lighting to make the space feel larger.
Snagging, certificates and a written warranty.
We measure and listen to how you will use the space. Free and without obligation.
A space plan and an itemised quote, adjusted to your budget and timescale.
One person coordinates every trade, with photographs of progress — useful if you are an investor who does not live nearby.
Certificates and a written warranty. If it is for letting, ready to furnish.
Open kitchens, removed partitions and joinery that uses every recess make a small apartment feel larger.
We spend where it shows and save where it does not, which matters in a small property.
Compact flats are quick to do when planned properly. You get a written date.
Hard-wearing materials, short timescales and turnkey delivery for apartments bought to let.
Photographs, video and written approvals mean you do not need to be in Spain.
A closed price by trade, which can go straight into your return calculation.
Per square metre of floor area, VAT excluded.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 520 – 650 €/m² | |
| Mid-range | Selected materials, best balance | 750 – 940 €/m² | |
| High specification | Premium materials and high-end interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges for a full renovation, VAT excluded.
A single well-organised space: integrated kitchen, sleeping area and made-to-measure storage. The highest cost per square metre.
The most common format for letting. A living room with kitchen, a bathroom and a bedroom, well resolved.
For living in or letting to families. An open kitchen, one or two bathrooms and a good layout.
We tune the project to the return, with hard-wearing materials and a short programme so it reaches the market sooner.
If the apartment is to be let, two things sit outside these figures: furniture and equipment, and whatever licensing the type of letting needs. A long-term let needs a habitability certificate and an energy certificate; a tourist let is a separate licensing question for a lawyer. See habitability certificates.
The scope of a turnkey apartment renovation, and what normally sits outside it.
VAT is shown as its own line, and for an investor it needs care: work billed to a company, or on a property being prepared for a commercial activity, can be taxed at 21% rather than 10%. Tell us how the property is held and we will apply the right rate in writing.
An apartment uses most of this list, coordinated by one person.
Apartments in Barcelona and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners and investors ask about renovating an apartment.
Mostly in scale. An apartment is usually smaller, so the layout, storage and light matter more, the fixed costs of the kitchen and bathroom weigh more heavily per square metre, and mistakes in the space plan are harder to absorb. The trades and the process are the same. The difference is the amount of thought that goes into the first fifty square metres.
Often, but only if the numbers work, and they depend on your location, the rent you can realistically achieve and what the renovation costs. A fixed quote lets you do that calculation honestly. We will not give you a yield figure — it depends on factors we do not control — but we can tell you what the work costs and how long it will keep the apartment off the market.
By opening the kitchen to the living room, removing partitions that only divide, building storage into every recess, using a fold-down bed or a mezzanine where the ceiling height allows, and using light colours and good lighting. A well-planned small apartment lives much larger than its floor area suggests. The measuring is what matters, which is why the survey is precise.
In stages tied to completed work: a deposit on signing, payments at the end of each phase and a final payment at handover. Never the whole amount in advance.
We can renovate it to a short-let specification, but the licence is a different matter. Tourist-let licences are granted municipality by municipality, and in some places, including Barcelona, new ones are effectively not available. That is a question for a local lawyer and the council, not a builder. See holiday-let renovations.
Yes. Survey by video or in person, a fixed quote, regular photographs and written approvals, and a handover with the certificates you need to let. The only things we cannot do from here are the ones that need a signature from you or a visit for the final material choices, and we keep those to a minimum.
Four to ten weeks on site for a typical apartment, plus time beforehand for drawings and ordering. Studios and one-bedroom apartments are at the short end if the layout is not changing, and you get a written programme before we start.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.