Every renovation starts by emptying the space. We do selective or complete demolition, protecting what stays, with waste taken to authorised sites and safety as the first priority.
Demolition looks like the easy part of a renovation and is, in fact, where most of the surprises arrive. What is behind a wall, under a floor or above a ceiling is only known once it is open. A careful strip-out finds those things early, when they cost least to deal with, instead of halfway through the build.
There are two kinds of job. Selective demolition removes only what is going: partitions, floors, tiles, fittings. It protects what stays and keeps the dust contained. Complete strip-out takes a flat or a unit back to bare structure, ready to be rebuilt. In both cases the access matters as much as the work, because every sack of rubble has to be carried down and out: the floor, the lift and the distance to the skip all change the price.
Disposal is regulated. Rubble goes to an authorised site, and some materials need special handling, above all asbestos, which is found in older fibre-cement roofing and some other materials and must be removed by an authorised company. We include waste management in the price and quote asbestos separately. See full home renovations.

A few days for a room; one to two weeks for a whole flat.
We find out what is being removed, what stays, what the walls carry and where the services run.
The notification or licence, and the skip permit if a skip goes on the street.
Stairs, lifts, floors and anything staying are protected, and the entrance of the building kept clean.
Water, electricity and gas are made safe before anything is cut.
Removed in a safe order, with dust suppression.
Rubble carried out and taken to an authorised site.
The space swept and left ready for the next trade.
We look at the job and the access. No cost and no obligation.
A price per square metre or by volume, with waste disposal included.
Done in a safe order with the building protected.
The space left clean and ready.
We check what a wall carries before it comes out.
Stairs, lifts and the entrance kept clean, because the neighbours notice.
Taken to an authorised site, with the documentation.
By an authorised company under an approved plan, as a separate line.
A careful strip-out shows what is hidden while it is still cheap to deal with.
Working hours kept, and noise warned in advance.
Indicative ranges, VAT excluded.
| Work | What it covers | Indicative range | |
|---|---|---|---|
| Selective demolition | Standard finishes, practical solution | 30 – 70 €/m² | |
| Complete strip-out | Selected materials, best balance | 40 – 90 €/m² | |
| Clearance only | Premium materials and high-end interior design | By volume |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Removing partitions, floors and finishes, and leaving the rest intact.
Taking a flat or unit back to bare structure, ready to rebuild.
Removing and disposing of rubble that has already been generated.
Removal of asbestos by an authorised company, quoted separately.
Anything that might be structural — a wall of unknown construction, a column, a beam — gets a technician’s opinion before it is touched. A wrong guess costs far more than the survey.
The scope of a demolition job, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
Demolition is the first step of most of the work on this list.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about demolition.
By checking before cutting. We look at the construction, the direction of the floor structure and the position of services, and where there is doubt we ask a technician. A partition can be removed freely; a load-bearing wall needs a calculated replacement first. Guessing is the one thing we never do.
Yes. We carry it out, load it and take it to an authorised site, and the price includes disposal. We tell you whether the skip and its street permit are included or separate.
It must be removed by an authorised company, working to an approved plan, with the waste handled lawfully. We do not remove it ourselves. We arrange it and quote it as a separate line, and it comes before the rest of the work. Do not drill or break anything you suspect contains it.
Roughly 30 to 70 €/m² for selective demolition and 40 to 90 €/m² for a complete strip-out, excluding VAT, with disposal included. Access can move that substantially.
Inevitably a little. We keep to working hours, warn neighbours in advance, protect the common areas and keep the building entrance clean. The noisiest tasks are short and we tell you when they happen.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. Disposal at an authorised site included.