Adapt a home or a building so that it can be lived in without barriers: replacing a bath with a shower, widening doors, installing ramps or stairlifts. Improvements that give independence and safety, many of them eligible for support.
An adaptation starts from one question: what does this person need to do in this home that they cannot do now? The answers are usually practical and not dramatic. Getting in and out of a bath, moving through a narrow door, managing a step or climbing a stair are the typical ones, and each has a well-understood solution.
The most common adaptation by far is replacing the bath with a level-access shower: a shower tray set flush with the floor, a non-slip surface, a seat, grab rails and a screen. It is quick, it transforms safety in the room where most falls happen, and it is the one we are asked for most. Beyond that, widening doors, removing steps and level changes, and adding a ramp are straightforward building work.
For stairs, a stairlift or a platform lift brings a home or a communal stair into use. We prepare the opening and the installation; the machine is supplied by its manufacturer. Many of these works attract support and a reduced VAT rate, which we check. For a lift in a building see lift installation, and for the bathroom side, bathroom renovation.

A bathroom swap takes a few days; wider adaptations take a few weeks.
We talk to the person who will use the space, and where relevant their therapist, and measure the home.
A plan of the changes, and a check on the grants and reduced VAT that apply.
Existing bath, door frames or steps removed.
A level-access shower with waterproofing, a non-slip surface, a seat and grab rails.
Doors widened and thresholds and steps removed.
A ramp built, or the opening and electrics prepared for a stairlift.
Checked with the user.
We visit and listen. No cost and no obligation.
Itemised, with the support available identified.
Done quickly and with as little disruption as possible.
Checked with the user, with warranty.
We start from what they need to do, not from a catalogue.
A bath-to-shower swap takes a few days.
Non-slip surfaces, the right fall, grab rails fixed to a sound wall.
Grants and reduced VAT checked before you commit.
The opening and electrics ready for the machine.
Ramps and lift connections in buildings.
Indicative ranges, VAT excluded.
| Adaptation | What it covers | Indicative range (€) | |
|---|---|---|---|
| Bath to shower | Standard finishes, practical solution | 1,800 – 4,000 € | |
| Various adaptations | Selected materials, best balance | 3,000 – 12,000 € | |
| Ramp / stairlift preparation | Premium materials and high-end interior design | From 3,500 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Swapping the bath for a level-access shower, with a seat, grab rails and a non-slip floor.
Widening doors and removing steps and level changes inside the home.
A ramp, or the building work and electrics for a stairlift or platform lift.
A full adaptation of the home for reduced mobility.
Eligibility for grants depends on who the user is and on the scheme in force — a recognised disability, a dependency assessment, or age — and on the rules of the administration. We tell you what we can see, and the administration decides.
The scope of an accessibility adaptation, and what is separate.
VAT is shown as its own line, and many accessibility adaptations qualify for a reduced rate. We tell you what applies.
Adaptations connect bathrooms, doors, ramps and lifts.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What families ask about adapting a home.
Often. There are accessibility and dependency grants, and many works — replacing a bath with a shower, removing barriers — can qualify for a reduced VAT rate. Eligibility depends on the user and on the scheme in force. We help you see what applies and prepare the application; the administration decides.
Roughly 1,800 to 4,000 € excluding VAT, depending on the finishes, including a seat, grab rails, a non-slip floor and a screen. It is the commonest adaptation: quick, safe, and it often attracts reduced VAT and the possibility of a grant.
We build ramps, and we prepare the opening and the electrical installation for stairlifts and platform lifts; the equipment itself is normally supplied by its manufacturer. In a building we can also adapt the access to the lift. We assess your case. See lift installation.
A bath-to-shower swap takes a few days. Wider adaptations take a few weeks, depending on the scope.
Yes. We start by understanding what the person needs to do and work from there, including bathrooms, doors, floors, kitchens and access. We can coordinate with a therapist if one is involved.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free assessment anywhere in Catalonia. Support identified before you commit.