Property type · Costa Brava, Maresme, Sitges

Luxury villa renovations in Catalonia

Renovating a coastal villa asks for another level: fine materials, genuine indoor–outdoor living, discreet home automation and flawless project management for owners who are often not in Spain. That is what we do.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Villa renovation

A coastal villa is not renovated like an ordinary house.

A villa on the Costa Brava, in the Maresme or around Sitges is a different kind of project. It is about fine materials — natural stone, timber, microcement, large-format porcelain — about light, about views, and about an easy flow between inside and the Mediterranean outside. Most of what makes a villa work is the quality of the detail.

The coastal climate is also harsh. Salt, humidity and sun punish joinery, façades, metalwork and pools. We choose solutions designed to last in a marine environment, not ones that look good the first summer and corrode by the second. We also look after the envelope, so that the villa is as comfortable in January as in July.

A great many villa owners do not live in Catalonia all year. So we work turnkey, with remote reporting: photographs and video of progress, decisions made by video call, and one named person who is accountable. You enjoy the house when you arrive; we look after everything else.

We work with your interior designer or can introduce one, and every project begins with a private survey and a discretion protocol. For a luxury apartment in the city, see luxury renovations; for a family house with a garden, detached houses.

Bathroom with a rock wall and vertical garden, freestanding bath on white gravel and a lit chandelier
How it runs

Renovating a villa, phase by phase.

Six to eighteen months, and a long preliminary period for design and licences. We schedule disruptive phases for the off-season where we can.

01

Private survey and design

We visit in confidence, assess the villa and the plot, and work with your interior designer on concept, materials and lighting. Structure, envelope and services are assessed alongside.

02

Licences and a committed quote

Permits and the technical project are filed, and the quote and programme are committed in writing, with a discretion protocol covering staff and access.

03

Demolition, structure and openings

Selective demolition, structural reinforcement and the large openings that connect the interior to the garden and the views.

04

Marine-grade envelope

Façade, roof and joinery specified for salt and sun, so the finishes do not corrode.

05

Services and integrated control

Air-source heat pump, radiant heating and cooling, and integrated control of lighting, climate, sound, blinds and security, with invisible cabling.

06

Fine materials and bespoke work

Stone, timber and large-format surfaces, a designed kitchen and spa-level bathrooms, built to tight tolerances.

07

Exterior, pool and handover

Terraces, landscaping and pool, where included, then commissioning of the control system, snagging, certificates and warranty.

How we work

How we run a villa project.

01

Private survey

We visit in complete confidence, assess the project and listen to the experience you want. Free, with no obligation.

02

Design, licences, committed quote

We coordinate your designer and the premium suppliers, file the permits and commit the price and the programme in writing.

03

Remote-managed build

One site manager runs every trade and supplier, with photographs and video of progress and decisions by video call. You do not need to be in Spain.

04

Turnkey handover

Control system commissioned with you, certificates and warranty in place, ready to live in.

Why us

Why villa owners use us.

Managed remotely, properly

Photographs, video and decisions by video call, with a single named person accountable.

Built for the coast

Materials and joinery specified for salt, humidity and sun, so the finish still looks right in five years.

Indoor and outdoor as one

Large openings, terraces and landscaping designed with the interior rather than added afterwards.

Discreet technology

Lighting, climate, sound, blinds and security from premium systems, with cabling you never see.

Confidential by protocol

Identified staff, controlled access and total respect for your privacy and the building’s.

Committed dates

A written programme and coordinated suppliers, with long-lead items ordered against the programme.

Prices

What a villa renovation costs.

Per square metre of floor area, VAT excluded. Pool and exteriors are quoted separately.

What a villa renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
ComfortStandard finishes, practical solution1,200 – 1,600 €/m²
Luxury / designer schemePremium materials and high-end interior designFrom 2,500 €/m²
Indicative prices · VAT not included. In a villa the price is set not by the square metres but by the level of finish, the home automation and the outside spaces — pool, wellness, landscaping. We work with a fixed itemised quote, full confidentiality and a written programme. The exact figure comes from a private survey.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate96,000 – 128,000 €Comfort · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of villa.

Indicative ranges for the renovation, VAT and professional fees excluded.

Medium villaUp to 200 m²From 240,000 €

One- or two-storey villas. Most of the budget goes on fine materials, the envelope for a marine climate and home automation.

Large villa200 – 350 m²From 400,000 €

A lot of premium finish, several suites, a designed kitchen and indoor–outdoor living areas.

Luxury villaOver 350 m²Bespoke

Large villas with wellness, a home cinema and landscaping. The figure is set during the design stage.

Pool and exteriorsInfinity pool, wellness, gardenFrom 60,000 €

Infinity pool, summer kitchen, spa and landscaping, quoted separately according to the project.

Two things in a villa that nobody can fix in advance: the licence — coastal planning is among the most restrictive in Spain, with limits on extensions, setbacks from the shoreline and sometimes protected landscapes — and the condition of what is hidden in a house of unknown history. We establish the planning position and open up what we can during the survey, before the figures are committed.

No small print

What is included and what is not.

The scope of a turnkey villa renovation, and what normally sits outside it.

✓ Included in the price

  • Coordination with your interior designer and premium suppliers
  • Demolition, strengthening and large openings
  • Envelope for a marine climate: façade, roof and salt-resistant joinery
  • Air-source heat pump, radiant heating and cooling, complete installations
  • Integrated home automation: lighting, climate, sound, blinds and security
  • Fine materials, designed kitchen and spa-level bathrooms
  • Remote project management with photographs and video of progress
  • Licences, technical supervision and final documentation
  • A written warranty on the work

✕ Not included — quoted separately

  • Furniture and decoration, except bespoke items built in
  • Art, premium appliances and AV equipment not itemised in the quote
  • Pool, landscaping and wellness, unless included in the project
  • Council taxes and fees
  • Interior design fees, if commissioned as a separate service
  • Final furnishing and styling

VAT is shown as its own line. On a high-end villa, the share of materials often takes the job past the 40% limit that the reduced rate depends on, so we assess it explicitly. Where the owner is a non-resident company or a non-resident individual, tell us before the quote so that we can check how the invoicing should be set up.

Where we work

Where we renovate villas.

Villas on the Costa Brava, in the Maresme and around Sitges and the Garraf. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What villa owners ask us, especially those who are not in Spain.

I do not live in Catalonia. Can you manage the renovation remotely?

Yes. You get a named site manager, regular photographs and video, and decisions are made by video call and confirmed in writing. The practical points are a Spanish tax number (NIE) and a Spanish bank account to pay invoices cleanly, and a local contact with keys. We suggest you come for the material decisions — stone, timber, tile — because they do not photograph honestly.

How is a villa renovation different from a chalet or house renovation?

In scale of ambition and in climate. A villa is typically a premium specification — fine materials, designed interiors, integrated technology and exterior spaces designed as part of the house — in a marine environment that punishes ordinary building materials. A chalet or ordinary house is mostly about comfort, running cost and good value. The skill set is different, so the quotes and the process are too. See detached houses.

Do you also look after the pool and the garden?

Yes, as part of the same project or as a second phase. Infinity pools, summer kitchens, wellness areas and landscaping are quoted separately because they vary so much, and the same site manager coordinates them with the house. See swimming pool construction and pool refurbishment.

How do payments and confidentiality work?

Payments are staged against completed and verified work, with long-lead items procured transparently. Never the full amount up front. Confidentiality is handled by a discretion protocol: identified staff, controlled access and total respect for your privacy. If you would like a confidentiality agreement, raise it when you enquire and we will discuss it.

Which materials survive the sea air best?

Hardwoods with proper finishes, powder-coated or anodised aluminium rather than plain steel, stainless steel of a marine grade, natural stone and porcelain, and mineral renders rather than plastic paints. What fails is anything ferrous that is not protected, cheap hinges and fittings, and joinery without a proper seal. We specify for a marine environment and say why, so that you can see what the extra cost buys.

Can you build out of season?

Often, and for a coastal villa it can be an advantage: the noisy and dusty phases can be scheduled for the off-season, when neighbours are away and tradespeople are more available. It depends on your own plans for the house and on local restrictions on summer building work, which some municipalities impose. We plan it with you.

Do you work on the Costa Brava, the Maresme and around Sitges?

Yes. We know the local councils, the coastal planning restrictions and the usual construction of each area. We also work elsewhere in Catalonia. See where we work.

How long will a villa renovation take?

Six to eighteen months on site, with a long design and licence stage before it that is often three to six months. Coastal licences can be slow and no builder controls them. We give you a written programme with the licence period shown as an estimate rather than a promise.

Can I extend the villa or add a pool?

Possibly, and it is the question to ask before you spend on design. Coastal planning is among the most restrictive in Spain, with limits on buildable area, setbacks from the shoreline and from boundaries, and in some places protected landscapes. We check the planning position first and tell you plainly whether the idea is realistic.

What do I do if I am thinking of buying a villa to renovate?

Ask us to look at it before you make an offer. We will tell you what it needs, roughly what that costs and whether the planning position supports what you have in mind. For a villa the gap between the asking price and the cost of making it right is a major factor, and it is invisible in the listing. There is no charge: ask for a survey.

Free quote

Discuss your villa in confidence.

A private survey, a discretion protocol and remote project management. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →