Building envelope · Catalonia

Roof repairs and maintenance in Catalonia

We find and fix leaks, replace tiles, clear gutters and maintain your roof so that it lasts — and when it is time to rebuild it completely, we do that too. Roofers with the experience to work at height safely.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Roof repairs

Find the leak, fix the cause.

Most roof leaks are small and stay small if they are caught: a slipped tile, a cracked ridge, a failed flashing around a chimney, a gutter full of leaves. Left alone they become rotten battens, damp ceilings and a bill ten times the size. A roof inspected once a year almost never needs rebuilding early.

The difficult part of a leak is finding it. Water enters in one place and appears in another, running along a rafter or a membrane before it drips. We trace it from the inside and the outside, and we fix the source rather than the stain. Gutters and downpipes cause more trouble than they should: a blocked outlet backs water under the tiles.

Where a roof has gone too far for repair, we say so, and we price a rebuild instead: see roof renovation. If the leak is on a flat roof or terrace, see rooftops and terraces. If you already have damp inside, damp treatment.

Steel joists resting on the floor of a room under construction, with a builder’s bucket, a cable and a limewashed wall in the background
How it runs

Repairing a roof, step by step.

A few hours to a few days, depending on what we find.

01

Inspection and leak tracing

We go up, examine the tiles, flashings, ridges and gutters, and trace the leak from the inside.

02

Safe access

Edge protection and safe access at height.

03

Spot repair

Replacing tiles, resealing flashings and ridges, and clearing outlets.

04

Gutters and downpipes

Cleaning, repair or replacement.

05

Test

We check the repair, ideally after rain.

06

Report

You receive a short written report with photographs.

How we work

How we run a roof repair.

01

Inspection

We go up and diagnose. We quote after we have seen the roof.

02

Fixed quote

A fixed price for the repair.

03

Repair

Done safely and quickly, usually in a day.

04

Report

Photographs and a note of what else to watch.

Why us

Why use us for your roof.

We find it, not guess it

Tracing a leak from inside and out, rather than patching where the stain is.

Photographs of what we find

You can see the problem.

Honest about repair or rebuild

We tell you when a repair is a waste.

Safe at height

Edge protection and proper access.

Gutters included

Because they cause so many leaks.

Annual check

A cheap inspection that prevents expensive repairs.

Prices

What roof repairs cost.

Indicative ranges, VAT excluded.

What roof repairs cost — Indicative prices · VAT not included
WorkWhat it coversIndicative range
Spot repair / leakStandard finishes, practical solution150 – 800 €
New roofPremium materials and high-end interior design97 – 222 €/m²
Indicative prices · VAT not included. A spot repair — a tile, a ridge, a leak — is affordable. A re-tile or a rebuilt roof is priced per square metre, and access and safety equipment affect it. We give you a quote once we have been up to diagnose.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate2,400 – 5,600 €Re-tiling · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By work

What it costs by type of work.

Indicative ranges, VAT excluded.

Repairing a leakSpot repair150 – 800 €

Finding and fixing a leak, or replacing damaged tiles and flashings.

GuttersCleaning / replacementFrom 120 €

Cleaning, repair or replacement of gutters and downpipes.

Re-tilingPart or all of the roof30 – 70 €/m²

Replacing the tiles and flashings and keeping the structure.

New roofComplete97 – 222 €/m²

Rebuilding the roof with insulation and waterproofing.

Access is the cost you cannot see from the ground. A roof reached by a ladder is cheap; one that needs scaffolding or a lift is not. We tell you which yours is when we inspect.

No small print

What is included and what is not.

The scope of a roof repair, and what is separate.

✓ Included in the price

  • Inspection and leak tracing
  • Edge protection and safe access
  • Replacement of damaged tiles and flashings
  • Resealing of ridges and valleys
  • Clearing of outlets
  • Gutter cleaning and repair
  • A short written report with photographs

✕ Not included — quoted separately

  • Scaffolding, where needed
  • Structural repairs not foreseen at inspection
  • Asbestos removal
  • Internal repairs to ceilings damaged by the leak
  • Council taxes and fees
  • Works needing the owners’ association’s consent

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we repair roofs.

Roofs across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about roof leaks.

I have a leak. Can you find it?

Usually, yes. Water often travels along a rafter or membrane before it drips, so the stain is rarely under the leak. We trace it from inside and outside, and where needed use a hose test to confirm it. We then fix the source and tell you what else to watch.

How often should a roof be inspected?

Once a year is the right rule, and after any big storm. A routine inspection costs little and catches slipped tiles, blocked gutters and failing flashings while they are still cheap to fix. It is the best value item in roofing.

Should I repair or rebuild?

It depends on the whole roof, not on the leak. A single failure on a sound roof is a repair. Widespread failure, sagging, rotten battens or a history of patches means a rebuild, and repeated repairs are money wasted. We give you our honest view with photographs. See roof renovation.

How much does it cost to repair a roof?

Roughly 150 to 800 € for a spot repair or a leak, 30 to 70 €/m² to re-tile, and 97 to 222 €/m² for a new roof, excluding VAT. Access and scaffolding are extra where needed.

Do you work safely at height?

Yes. We use edge protection and proper access, and we do not send anyone onto a roof without them. If the roof needs scaffolding to be worked on safely, we say so and quote it.

How is it paid for?

Small repairs on completion; larger work in stages tied to completed work.

Free quote

Book a roof inspection.

We go up, find the cause and quote once we have seen it. Anywhere in Catalonia.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →