Property type · Catalonia

Duplex renovations in Catalonia

In a duplex everything revolves around the staircase: where it is, how it rises, how it divides the two floors. Getting those two levels organised is what turns an awkward duplex into a home that flows.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Duplex renovation

Two floors, one staircase and a lot of decisions.

A duplex has a big advantage over a flat on one level: you can genuinely separate the day zone from the night zone. It also has one element that conditions everything and that a single-floor flat does not: the internal staircase. Where it starts, how much room it takes, whether it is open or closed and how much light it lets through shapes how the whole duplex is lived in.

So the first question in a duplex renovation is not the colour of the bathroom. It is what to do about the staircase and the slab between the floors. Sometimes it is enough to open the stair up and lighten it. Sometimes it pays to move it, to gain a double-height living room or free the lower floor. It is the decision that changes the result most, and any change to the slab or the stair needs structural calculation.

The other big subject is comfort between levels: soundproofing the slab so you do not hear footsteps from above, zoning the heating and cooling by floor so you are not warming the bedrooms all day, and lighting the stairwell properly, which is usually the darkest part of the home. We resolve those in the design, not by improvising on site. For the building-wide package, see full home renovations.

Narrow hallway of a home with oak laminate flooring, white walls, a white door on the left and a window at the far end
How it runs

Renovating a duplex, phase by phase.

Eight to fourteen weeks for a typical duplex. The staircase decision comes first because the services and the layout follow it.

01

Survey and staircase options

We assess the stair, the slab between the floors, the structure and the services, and show you the realistic options for the stair before anything else is designed.

02

Permits and structural calculation

Any change to the stair or the slab needs a calculated structural solution and, where the work touches the structure, a project and licence.

03

Strip-out and structural work

Demolition, then opening, moving or lightening the stair and forming any double-height space.

04

Services, by floor

New plumbing, electrics with certificate, and heating and cooling zoned by floor so each level is controlled separately.

05

Acoustic floor

An acoustic layer on the slab between floors to cut impact noise from above, laid before the finished floor.

06

Layout, kitchen and bathrooms

Day zone downstairs and night zone upstairs, with a new kitchen and one or two floors of bathrooms.

07

Finishes and handover

Flooring, joinery, the staircase finish, lighting of the stairwell, painting and handover with the warranty.

How we work

How we run a duplex project.

01

Free survey

We visit and look at the staircase, the slab and the structure first. Free, with no obligation.

02

Design and a fixed quote

A layout and an itemised quote, with the staircase and any structural item priced separately.

03

Build, with one site manager

One person coordinates every trade across both levels, with photographs of progress.

04

Handover and warranty

Certificates and a written warranty.

Why us

Why renovate your duplex with us.

The staircase decision, made properly

We show you realistic options with structural feasibility checked, before the design depends on one.

Quiet between floors

An acoustic layer on the slab, so the floor above is not a drum.

Zoned climate

Heating and cooling separated by floor, so you do not heat the bedrooms all day.

A well-lit stairwell

We design lighting for the darkest part of the home rather than leaving it as an afterthought.

One site manager across both levels

Every trade on both floors coordinated by one person.

Calculated, not assumed

Any change to the slab or stair rests on structural calculation, not on a builder’s guess.

Prices

What a duplex renovation costs.

Per square metre of floor area, VAT excluded. The staircase is quoted separately.

What a duplex renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
FunctionalStandard finishes, practical solution550 – 850 €/m²
High specificationPremium materials and high-end interior design1,300 – 2,000 €/m²
Indicative prices · VAT not included. The staircase is the item that moves the price. Lightening an existing stair is inexpensive; opening a new slab with a calculated structure is not. We quote it as its own line so you can see the cost of the double-height living room before you decide on it.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate44,000 – 68,000 €Functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of duplex.

Indicative ranges for a full renovation, VAT excluded.

Small duplexUp to 80 m²45,000 – 90,000 €

Compact duplexes, often under the roof. The stair and the ceiling insulation weigh most.

Medium duplex80 – 120 m²70,000 – 140,000 €

The most common size. Day downstairs, night upstairs, with a bathroom on one or both floors.

Large duplex120 – 160 m²100,000 – 200,000 €

More floor area per level and often the option of a double-height living room.

The staircaseOpen · lighten · moveFrom 6,000 €

From lightening the existing stair to opening a new slab with a calculated structure, quoted separately.

Anything that touches the slab between floors in a duplex needs a structural calculation, and sometimes a licence. Because the slab belongs to your own unit it is usually simpler than in a block of flats, but it still needs a technician to sign it. We build that into the quote rather than discovering it halfway.

No small print

What is included and what is not.

The scope of a turnkey duplex renovation, and what normally sits outside it.

✓ Included in the price

  • Survey of the staircase, slab and structure
  • Strip-out and clearance
  • New plumbing, drainage and electrics with certificate
  • Heating and cooling zoned by floor
  • Acoustic layer on the slab between floors
  • New layout, flooring, kitchen and bathrooms
  • Staircase finish and stairwell lighting
  • Joinery, painting and finishes
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Structural work to the stair or slab, quoted separately once calculated
  • Appliances, except those itemised in your quote
  • Loose furniture and decoration
  • Council taxes and fees where they apply
  • Architect’s fees where a full project is legally required
  • Works that are the building’s responsibility

VAT is shown as its own line — 10% or 21% depending on your case, confirmed in writing before you sign.

Where we work

Where we renovate duplexes.

Duplexes in Barcelona and across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about renovating a duplex.

Can I move or change the internal staircase?

Usually yes, and it is often the best decision in the job. Options range from lightening and opening the existing stair, which is cheap, to moving it to free the lower floor or create a double-height space, which is not. Anything that cuts the slab needs a structural calculation and sometimes a licence. We show you the realistic options, with feasibility checked, before the layout depends on one.

Can I create a double-height living room?

Often, where the slab can be opened and the structure allows it. You gain light and a sense of volume that changes the whole home, at the cost of floor area upstairs and a structural item in the budget. It also affects acoustics and heating: warm air rises, so a double-height space needs the climate design to take it into account. We assess all of that at the survey.

I can hear every footstep from upstairs. Can it be fixed?

Largely, if we are renovating the floor. The effective solution is an acoustic layer under the new floor finish on the slab between levels, which cuts impact noise from above. It has to be laid before the finished floor, so the time to do it is during the renovation, not after.

How is a duplex renovation paid for?

In stages tied to completed work: a deposit on signing, payments at the end of each phase and a final payment at handover. Structural items are invoiced separately so you can see what each costs.

Should I heat and cool each floor separately?

Yes, in nearly every case. Day-zone and night-zone floors are used at different times, and a single thermostat means heating the bedrooms all day or leaving the living room cold. Zoning by floor costs little at the design stage and saves running costs from the first winter.

Do I need the residents’ association’s permission?

For work inside your own unit, including the stair and the slab between your own floors, usually not — but if it affects the structure of the building, the façade or any shared element, yes. You will also need a council permit and a technician’s signature for structural changes. We tell you which applies. See permits and drawings.

How long does a duplex renovation take?

Eight to fourteen weeks on site for a typical duplex, plus time beforehand for drawings and permits. A change to the stair or slab adds time for calculation and, where required, a licence.

Free quote

Get a survey of your duplex.

Free survey anywhere in Catalonia. Staircase options with structural feasibility checked.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →