A supermarket is logistics and services: cold rooms and refrigerated units, electrical capacity, a floor that takes constant traffic, checkout lines and a loading bay. We renovate for how it operates, and where possible without closing.
A supermarket makes its margin on efficiency, and the building either supports that or fights it. The biggest single element is refrigeration: cold rooms and display units that run all day, shed a lot of heat, and need a large and reliable electrical supply. Everything else in the store depends on that being right.
The second element is the floor. Trolleys, pallets and cleaning machines all work a supermarket floor constantly, and it has to be hard-wearing, easy to clean and safe when wet. After that come the electrics, the fire protection, the checkout layout and the loading and unloading route, which decides how quickly stock gets to the shelf.
Most supermarkets cannot close, so the real challenge is phasing: refitting aisle by aisle, moving the refrigeration in stages and protecting the cold chain throughout. For smaller food retail, see shops; for the general process, commercial unit fit-out.

Typically six to sixteen weeks, phased to keep trading. The sequence protects the cold chain.
We assess the electrical capacity, the refrigeration plant, the floor and the layout, and plan a sequence that keeps the store trading.
Whatever permission the changes need, filed in good time.
Upgrades to supply and distribution, plus heat rejection and connections for the refrigeration.
Aisle-by-aisle or section-by-section, with the floor renewed to an industrial specification.
Power, drainage and heat evacuation for new cabinets and cold rooms, which are supplied by the refrigeration contractor.
Aisles, checkouts, signage and lighting.
Fire protection, certificates and handover.
We visit and walk the store with whoever runs operations. No cost and no obligation.
A fixed itemised quote, with the refrigeration preparation priced separately from the equipment.
One site manager coordinates every trade and the refrigeration contractor, with daily liaison with the store.
Certificates and warranty.
We plan around your trading hours and your peak days.
Refrigeration is moved in stages so food safety is never compromised.
Electrical capacity and distribution designed for the load, with room for the next cabinet.
A surface specified for trolleys, pallets, cleaning and wet conditions.
One site manager makes sure the building is ready when the equipment arrives.
Every trade coordinated by one person.
Per square metre of floor area, VAT excluded. Refrigeration equipment is separate.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Basic fit-out | Standard finishes, practical solution | 400 – 700 €/m² | |
| Mid-range | Selected materials, best balance | 700 – 1,100 €/m² | |
| High specification | Premium materials and high-end interior design | 1,100 – 1,800 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT and equipment excluded.
Neighbourhood stores. Refrigeration and electrical capacity are most of the cost.
The most common size, with fresh counters, preparation areas and several checkouts.
Large supermarkets with major services and refrigeration.
Power, distribution boards, heat evacuation and connections for the cold equipment, which is supplied separately.
Everything about a supermarket renovation is shaped by the fact that it cannot stop selling food safely. A phasing plan that protects the cold chain is part of the quote, not an extra.
The scope of a supermarket renovation, and what is separate.
VAT is shown as its own line — normally 21% on works for a business.
A supermarket draws on most of this list, coordinated by one person.
Supermarkets and grocery stores in Barcelona and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What store operators ask.
Usually, by working in sections, protecting the cold chain and scheduling noisy or dusty tasks outside trading hours. It lengthens the programme and costs more than a closed build, and we show both so you can weigh them. Some stores prefer a short full closure for the heaviest work, and we will say honestly which is the better option for yours.
We prepare the building — electrical supply, distribution, drainage and heat evacuation — and coordinate with the refrigeration contractor who supplies and installs the cabinets and cold rooms. The refrigeration equipment is normally supplied separately from the building work.
An industrial floor: resin or polished and sealed concrete or hard-wearing tile, chosen for trolleys, pallets and cleaning machines, with a slip resistance suitable for wet conditions. The cheapest option is rarely the cheapest over five years of heavy use.
Roughly 400 to 700 €/m² for a basic fit-out, 700 to 1,100 €/m² for mid-range and 1,100 to 1,800 €/m² for a high specification, excluding VAT and equipment. A 400 m² store at mid-range comes to around 280,000 to 440,000 € for the works.
Six to sixteen weeks, depending on the size and on how much of the store has to keep trading. We give you a written programme.
In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover. Never the full amount in advance.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. A phasing plan that protects the cold chain and your trading.