Space · Catalonia

Garage renovations in Catalonia

A garage can do much more than hold a car: an epoxy floor, good light, a storage room, an electric-car charging point, or even a conversion into another room. We make it practical, clean and made to measure.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Garage renovation

The most underused room in the house.

Most garages are in one of two states: a cluttered store, or an empty cold box with a cracked floor. The cheapest way to change that is the floor. A resin floor, decent lighting and fresh paint transform a garage for a few thousand euros and make it a place you can use for a car, a workshop or storage.

Beyond that, there are three common jobs. Electrical: new circuits, good lighting and, increasingly, a charging point for an electric car. Storage: shelving, wall systems and a lockable store. And conversion: turning the garage into a bedroom, an office or a gym, which is a larger project with real planning questions.

The planning question is whether the garage can legally become living space. Many cannot without a change of use and a planning decision, and some building statutes forbid it. We check before we design. For installing a charging point in a shared parking area, see EV charging points; for a garage that belongs to a house with a garden, detached houses.

Bundle of black corrugated pipes laid over a concrete base, beside blocks and under a floor slab, on a project in progress
How it runs

Renovating a garage, step by step.

A few days for a floor and paint; two to six weeks for a full renovation or a conversion.

01

Survey

We check the floor, the walls, the damp, the electrics and what you want to use the space for.

02

Floor preparation

Grinding, repairing and, if needed, damp-proofing the slab before the new surface goes on.

03

Resin floor

An epoxy or polyurethane floor, which is hard-wearing and easy to clean.

04

Electrics and lighting

New circuits, good lighting, sockets and, if wanted, a charging point.

05

Walls and ceiling

Repairs and paint, and insulation if the garage will be used as a room.

06

Storage

Shelving, wall systems or a lockable store.

07

Door and handover

An automatic door if wanted, then snagging and handover.

How we work

How we run a garage project.

01

Free survey

We look at the garage and ask how you want to use it. No cost and no obligation.

02

Fixed quote

An itemised quote, with the optional extras priced separately.

03

Build, with one site manager

One person coordinates the trades. Most garage jobs are quick.

04

Handover and warranty

Certificates and warranty.

Why us

Why renovate your garage with us.

Value from a small spend

A floor, lighting and paint change a garage more than almost any other money.

Charging point ready

We design the electrics with an EV charger in mind, even if you fit it later.

Storage made to measure

Shelving and storage that use the walls rather than the floor.

Damp dealt with

We check the slab and the walls before we put a floor on top.

Honest about conversion

We tell you whether the garage can legally become a room before you spend on design.

One site manager

Every trade coordinated by one person.

Prices

What a garage renovation costs.

Indicative ranges, VAT excluded.

What a garage renovation costs — Indicative prices · VAT not included
WorkWhat it coversIndicative range (€)
Resin floor + paintStandard finishes, practical solution2,500 – 6,000 €
Conversion to a roomPremium materials and high-end interior designFrom 12,000 €
Indicative prices · VAT not included. A good resin floor, lighting and paint transform a garage for little money. A charging point starts at around 700 to 1,500 € depending on the installation, and an automatic door at about 1,200 €. Converting it into living space is a larger project. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Full renovation · functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of garage.

Indicative ranges, VAT excluded.

Single space / small garageUp to 20 m²2,500 – 7,000 €

A resin floor, light and organisation. The best-value improvement.

Medium garage20 – 40 m²5,000 – 14,000 €

A full renovation with new electrics, a store and the option of a charging point.

Large garageOver 40 m²From 10,000 €

For several cars, or with a workshop and storage.

EV charging pointElectric carFrom 700 €

Installation of a protected charging point. The price depends on the existing installation.

If the garage is in a shared parking area, the installation of a charging point and any change to the shared electrics may involve the owners’ association. We check the position for your building and tell you what is needed.

No small print

What is included and what is not.

The scope of a garage renovation, and what is separate.

✓ Included in the price

  • Survey of the floor, walls and electrics
  • Floor grinding, repair and damp-proofing where needed
  • Resin floor
  • Electrics and lighting with certificate
  • Wall and ceiling repairs and paint
  • Shelving or storage
  • A written warranty

✕ Not included — quoted separately

  • EV charging point, unless itemised
  • Automatic door, unless itemised
  • Conversion to living space, which needs a change of use
  • Council taxes and fees
  • Vehicle lifts and workshop equipment
  • Works in shared parking areas that need the community’s consent

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we renovate garages.

Garages across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about garages.

Which floor is best for a garage?

A resin floor — epoxy or polyurethane — is the usual answer. It is hard-wearing, resists oil and is easy to clean. The preparation matters more than the product: the slab has to be ground, repaired and dry, or the floor will lift. Paint is cheaper and does not last.

Can you install a charging point for an electric car?

Yes. The price starts around 700 to 1,500 € depending on how far the charger is from the consumer unit and whether the supply can take it. In a shared garage you may need to notify or involve the owners’ association, and we check the position. See EV charging points.

Can I convert the garage into a room?

Sometimes, and it is a bigger question than it looks. It needs a change of use from garage to dwelling, which depends on the local plan, and it is forbidden in some building statutes. It also needs insulation, light and ventilation to habitable standards. We check feasibility before you spend on design.

How much does it cost?

Roughly 2,500 to 6,000 € for a resin floor and paint, 6,000 to 15,000 € for a full renovation, and from 12,000 € to convert it into a room, excluding VAT. A charging point and an automatic door are separate.

How long does it take?

A few days for a floor and paint; two to six weeks for a full renovation or a conversion.

How is it paid for?

In stages tied to completed work, with a deposit on signing and a final payment at handover.

Free quote

Get a quote for your garage.

Free survey anywhere in Catalonia. A fixed quote, with the extras priced separately.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →