A terraced house combines the best of a house and a flat: several floors, a garden or patio and a garage, but shared party walls. We renovate with attention to insulation between neighbours and make the most of every floor.
An adosado is a terraced or semi-detached house, typically built in an estate in the 1980s to 2000s in the Vallès, the Maresme or the Baix Llobregat. It usually has three floors, a garage at the bottom, a small garden or patio, and walls shared with the neighbours on one or both sides. That layout creates two renovation priorities that a detached house does not have.
The first is sound. Party walls in many of these developments are thinner than they should be, and the complaint we hear most is being able to hear next door. The fix is an acoustic lining on the party wall, built on the inside, which costs floor area but works. The second is thermal insulation: the roof and the end façade lose most of the heat, and insulating them changes comfort permanently.
The extra floor space under the roof is often wasted. A loft conversion can add a bedroom or a study at a modest cost per square metre. Add the garden and garage, and a terraced house is a project with several parts, run by one site manager. For a detached house with a bigger plot, see detached houses.

Three to six months for a typical house. Work on a shared wall needs care for the neighbour, so we agree access early.
We look at the party walls, the roof, the services and the loft space, and propose a layout and a fixed quote.
A notification or licence, depending on whether the structure is touched.
Demolition and clearance, with the shared walls protected and the neighbour told in advance.
An acoustic lining on the shared walls and insulation of the roof and end façade.
New plumbing, electrics with certificate, and heating and cooling for three floors.
A new layout, a kitchen and bathrooms on each floor.
Floors, joinery and painting, then the garden and the garage.
We visit and listen to the problems you want solved. No cost and no obligation.
An itemised quote, with the acoustic and insulation work priced separately so you see what each costs.
One person coordinates every trade and keeps the neighbours informed.
Certificates and warranty.
An acoustic lining that actually works, specified before the layout is fixed.
Roof and end façade insulated, so the house is cooler in summer and cheaper in winter.
We look at the space under the roof as a potential extra room.
Services and finishes planned across all floors at once.
We tell the people next door what is happening and when.
Every trade coordinated by one person.
Per square metre of floor area, VAT excluded. Garden and garage are separate.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 650 – 950 €/m² | |
| Mid-range | Selected materials, best balance | 900 – 1,300 €/m² | |
| High specification | Premium materials and high-end interior design | 1,400 – 2,200 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Two-storey houses. Insulation and services make up a large share of the spend.
The most common size, with three floors, a garage and a garden or patio.
A lot of floor to insulate and heat, often with a usable loft.
Acoustic lining and insulation of the façade and roof, priced separately.
Working on a shared wall is the one thing that is different from a detached house: the neighbour has a stake in it. We tell them in advance, protect their side, and work in agreed hours. It is the right thing to do and it avoids the stop-work complaint.
The scope of a turnkey terraced house renovation, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case, confirmed in writing before you sign.
A terraced house uses most of this list, coordinated by one person.
Terraced houses across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about renovating a terraced house.
Largely, yes, if you are renovating. The effective solution is an acoustic lining on the inside face of the party wall — a frame with insulation and a double layer of board — which breaks the transmission path. It costs a few centimetres of floor area on each side and is far better than anything that can be done afterwards. We specify it before the layout is fixed.
Yes, mostly at the roof and the end façade, which is where a terraced house loses its heat. The party walls lose little, because the neighbour is heating the other side. Insulating the roof and the exposed façade changes comfort in summer and winter and lowers the running cost.
Often. The space under the roof can become a bedroom or a study if it has enough headroom, natural light and ventilation and the roof is insulated. It usually needs a rooflight or a dormer. See loft conversions.
Roughly 650 to 950 €/m² for a functional renovation, 900 to 1,300 €/m² for mid-range and 1,400 to 2,200 €/m² for a high specification, excluding VAT. A 150 m² house at mid-range comes to around 135,000 to 195,000 €.
Three to six months on site for a typical house, plus time beforehand for drawings, permits and ordering.
In stages tied to completed work: a deposit on signing, payments at the end of each phase and a final payment at handover. Never the full amount in advance.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. Party-wall acoustics and insulation priced separately.