Trades · Catalonia

Plasterboard partitions and suspended ceilings in Catalonia

Plasterboard lets you re-plan, insulate and hide services quickly, cleanly and without heavy building work. We build partitions, suspended ceilings, wall linings and every sort of dry-lining solution.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Plasterboard and ceilings

Dry-lining: quick, clean and flexible.

Plasterboard — pladur in Spanish — is the standard way to build lightweight walls and ceilings. Metal frames are fixed to the structure, boards are screwed to them, and the joints are taped and plastered. There is no wet trade, so it is fast, clean and dust-light compared with brick, and it can hide pipes, cables and ducts behind a flat surface.

It does four jobs. Partitions divide space, with insulation inside for sound. Suspended ceilings drop the ceiling to hide services, to take recessed lighting and to improve acoustics. Wall linings go in front of a party wall or an exterior wall to add acoustic or thermal insulation. And bespoke details — niches, headboards, curved forms and boxed-in beams — are easily made.

The honest limits: plasterboard does not carry structural loads, and a wall with only plasterboard on it needs the right fixings to hold a heavy shelf or television. Where the wall needs to hold weight, it is reinforced behind with timber or a metal plate. For brick and block partitions see building work, and for sound between neighbours, terraced houses.

Bathroom under construction with green metro-style wall tiles, a recessed cistern push plate and exposed pipework, a light wood wall cabinet hanging above and a wood-effect tiled floor
How it runs

Dry-lining, step by step.

A day or two for a ceiling or a partition; a week for a whole flat.

01

Survey and layout

We mark out the walls and ceilings and agree heights, services and lighting.

02

Frame

Metal tracks and studs fixed to the floor, walls and ceiling.

03

Services and insulation

Cables and pipes run, and insulation placed in the cavity.

04

Boarding

Boards fixed, with moisture-resistant or fire-rated boards where needed.

05

Jointing

Joints taped and plastered, and sanded smooth.

06

Finishing

Ready for paint, or with a primer.

How we work

How we run a plasterboard job.

01

Free survey

We measure and discuss what you want. No cost and no obligation.

02

Fixed quote

A price per square metre.

03

The work

Quick and clean.

04

Handover

Left ready for paint.

Why us

Why use us for plasterboard.

Acoustic detailing

Partitions and linings built to cut sound, not just divide space.

Services planned in

Lighting and cables considered before the ceiling closes.

The right board for the room

Moisture-resistant, fire-rated or acoustic where it matters.

Joints finished well

The difference between a flat ceiling and one that shows its seams.

Fast and clean

Little dust and quick progress.

Bespoke details

Niches, curves and boxed-in features.

Prices

What plasterboard costs.

Per square metre, VAT excluded.

What plasterboard costs — Indicative prices · VAT not included
WorkWhat it coversPer m² (excl. VAT)
Plain suspended ceilingStandard finishes, practical solution20 – 40 €/m²
Acoustic wall liningPremium materials and high-end interior design35 – 60 €/m²
Indicative prices · VAT not included. Plasterboard is priced per square metre by type — ceiling, partition, lining — and by extras such as insulation, special boards, concealed lighting or curved forms. It is quicker and cleaner than traditional building work.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate1,600 – 3,200 €Plain suspended ceiling · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By work

What it costs by type of work.

Indicative ranges, VAT excluded.

Suspended ceilingPer m² of ceiling20 – 45 €/m²

Lowering the ceiling, hiding services or creating indirect lighting.

PartitionDividing space30 – 55 €/m²

Dividing partitions with sound insulation inside.

Wall liningInsulating a wall35 – 60 €/m²

Thermal or acoustic insulation to a wall or party wall.

Bespoke detailsNiches, headboardsAsk us

Shelving, headboards, niches and curved forms.

A partition between two flats or a party wall needs more than a single board if you want real sound insulation. We specify the mass and the insulation, and say honestly what to expect.

No small print

What is included and what is not.

The scope of a plasterboard job, and what is separate.

✓ Included in the price

  • Survey and set-out
  • Metal frame
  • Insulation within the cavity
  • Boards, including moisture-resistant or fire-rated where needed
  • Joints taped and plastered
  • Primer
  • Cleaning
  • A written warranty

✕ Not included — quoted separately

  • Painting
  • Recessed lighting fittings, unless itemised
  • Electrical and plumbing work, which are separate trades
  • Structural reinforcement for heavy fixings
  • Council taxes and fees
  • Works needing the owners’ association’s consent

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we do plasterboard.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about plasterboard.

Does plasterboard insulate against noise?

It can, if it is built for it. A single board on a single frame stops little. A partition with a double layer of board on each side and mineral wool in the cavity performs far better, and a lining in front of a party wall, with an air gap and insulation, can transform it. We specify according to the problem and say honestly what you will get.

Can I hang things on a plasterboard wall?

Light things, with the right plugs. Heavy items — a television, shelving, a kitchen cabinet — need reinforcement behind the board, usually timber or a steel plate, which we build in during the work. It is much easier to do it when the wall is open.

What is a suspended ceiling for?

To hide pipes, ducts and cables, to take recessed lighting, to improve acoustics and to lower a very high ceiling. It also covers a damaged or uneven ceiling. The cost is some headroom, so we check the height before we specify.

How much does plasterboard cost?

Roughly 20 to 40 €/m² for a plain suspended ceiling, 30 to 55 €/m² for a partition and 35 to 60 €/m² for an acoustic lining, excluding VAT.

Is it quicker than building in brick?

Yes — considerably. There is no wet trade and no long drying time, so partitions and ceilings go up in a day or two and can be painted straight after the joints are dry. It is also much cleaner.

Free quote

Get a quote for plasterboard.

Free survey anywhere in Catalonia. Acoustic and fire ratings specified for the use.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →