If your pool loses water, has tired tiles or outdated filtration, we renew it: a new lining, repair of the shell, efficient filtration and heating to lengthen the swimming season.
An old pool usually has one of three problems: it loses water, the lining is failing, or the equipment is out of date and expensive to run. They can occur together, and the order you tackle them in matters, because there is no point in relining a pool whose shell is leaking.
So the first step is always to find out where the water is going. A leak can be in the shell, at the skimmers or return fittings, in the pipework, or in the lining, and each is repaired differently. Getting the diagnosis right is what stops a patchwork of repairs that never quite works. If the shell is sound, the lining can be renewed; today the commonest choices are a reinforced membrane, mosaic tile or porcelain.
Renovation is also the cheapest moment to improve the system: efficient filtration, salt chlorination in place of chemicals, LED lighting, or heating to extend the season. For a new pool see pool construction, and for the garden around it, gardens.

Two to six weeks, depending on the scope. The pool is drained once.
We establish where the water is lost and the condition of the shell, lining and equipment.
The pool is emptied once, and the work done together.
Cracks and leaks repaired and the shell made watertight.
A new membrane, mosaic or porcelain lining.
New filtration, pumps, lighting and any salt chlorination or heating.
The edging and surrounding area renewed where needed.
Refilled, water treated and commissioned.
We look at the pool and diagnose. No cost and no obligation.
An itemised quote, with shell repair priced separately once the condition is known.
Done while the pool is empty, so it is drained once.
Commissioned and guaranteed.
A proper diagnosis so that you repair once.
All the work planned into one emptying.
Membrane, mosaic or porcelain explained against your pool and budget.
Efficient filtration and salt chlorination are cheapest to fit now.
Every trade coordinated by one person.
On the repair and the lining.
Indicative ranges, VAT excluded.
| Work | What it covers | Indicative range (€) | |
|---|---|---|---|
| New lining | Standard finishes, practical solution | 4,000 – 12,000 € | |
| New filtration | Selected materials, best balance | 1,500 – 5,000 € | |
| Complete renovation | Premium materials and high-end interior design | From 10,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Replacing old mosaic or fitting a durable reinforced membrane.
Replacing the filter, skimmers and fittings with equipment that uses less energy.
Locating and repairing cracks and leaks in the shell.
Shell, lining, filtration, coping and improvements.
If the shell is cracked beyond repair or the pool is simply the wrong size and shape, a new pool can be better value than a long list of repairs. We tell you honestly when that point has been reached.
The scope of a pool renovation, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
A pool connects waterproofing, equipment and landscaping.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about renovating a pool.
Almost always. We find where the water is going — the shell, the lining, the fittings or the pipework — and repair that, renewing the waterproofing and the lining if needed. Finding the leak properly is the key to repairing once rather than patching a problem that comes back.
Mosaic is the classic. Porcelain gives a premium finish. A reinforced membrane is now one of the best choices: very durable, watertight, relatively quick to fit and available in many finishes. We advise on your pool and your budget.
Yes. Salt chlorination makes the disinfectant from common salt, which gives water that is gentler on skin and a good deal less chemical handling. It is one of the most requested upgrades when a pool is renovated, and we fit it.
Roughly 4,000 to 12,000 € for a new lining, 1,500 to 5,000 € for new filtration, and from 10,000 € for a complete renovation, excluding VAT.
Two to six weeks depending on the scope. The pool is drained once and the work planned around that.
If the shell is sound, renovation is nearly always far cheaper. If it is cracked beyond economical repair, or the pool is badly placed or the wrong shape, a new pool may be better value. We give you an honest view after the survey. See pool construction.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey and leak diagnosis anywhere in Catalonia.