Produce your own electricity and pay much less for it. We install self-consumption solar panels, with or without batteries, sized to your use, and handle the paperwork for support and surplus compensation.
Catalonia gets enough sun that a well-designed rooftop installation covers a large part of a household’s electricity over the year. The panels produce when the sun shines, your home uses what it can at that moment, and the surplus goes to the grid and is credited against your bill by your supplier. That scheme is called compensación de excedentes and it is why a panel without a battery still makes sense.
The sizing is the part that matters. Too few panels and the saving is small; too many and you export electricity at a low credit. We design from your actual consumption, with your bills in hand, and from what your roof can take: orientation (south is best), shading and space. We fix the panels with mounts that respect the waterproofing under them.
Batteries are the question everybody asks. They help if you use most of your electricity at night; if you use most by day, they often do not pay back, and we say so. Solar works best on a home that is already efficient, so see energy efficiency for the order of spending, and heat pumps and EV charging, which are what solar is most often paired with.

One to three days to fit; a few weeks beforehand for design, permits and the supplier registration.
We study your bills, your roof, its orientation and shading, and design an installation sized to your consumption.
The notification or licence the council requires, and the applications for grants and municipal discounts where they exist.
Fixings and rails installed so that the roof stays watertight.
Panels mounted and wired to the inverter.
Connected to your consumer unit with the right protections, and a meter or monitoring.
We register the installation with your supplier so surplus is credited.
Certificates, a demonstration of the monitoring and warranty.
We look at the roof and your bills. No cost and no obligation.
A sized installation, with the expected production and the payback stated with its assumptions.
Usually one to three days on the roof.
We register it with your supplier and hand over the paperwork and warranty.
Your actual consumption, not a generic package.
We tell you when they will not pay back.
Fixings that do not compromise the waterproofing underneath.
Surplus compensation and, where they exist, grants and municipal discounts.
A stated figure with its assumptions, not a headline number.
Electrical work by authorised installers, with certificates.
Supplied and fitted, VAT excluded.
| Installation | What it covers | Indicative range (€) | |
|---|---|---|---|
| Flat / low consumption | Standard finishes, practical solution | 2,500 – 4,500 € | |
| Detached house | Selected materials, best balance | 4,500 – 9,000 € | |
| Adding batteries | Premium materials and high-end interior design | + 3,000 – 7,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Small installations where roof space is available.
The most common case, with a good roof area.
Adding batteries to use the day’s energy at night.
A shared installation for several neighbours in a building.
In a flat, the roof is common property, so a private installation needs the owners’ association’s agreement, and a shared community installation is a different, more complex project. A detached house has no such constraint.
The scope of a solar installation, and what is separate.
VAT is shown as its own line, and solar installations have attracted reduced rates and deductions at various times. Support is applied for, not promised, and we say clearly what depends on it.
Solar connects roofs, electrics, heat pumps and EV charging.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about solar.
At recent electricity prices, a well-sized self-consumption installation has typically paid back in around five to eight years, then produced electricity at almost no cost for 25 years or more. That figure moves with electricity prices, your consumption pattern and any support, so we calculate it for your home and state the assumptions. Be wary of anyone who gives a single number without asking for your bills.
It depends on when you use electricity. If you use a lot in the evening and night, batteries let you use the day’s production and make more sense. If you use most by day, it is often better to export the surplus and be credited for it. Batteries add a lot to the cost, so we study your consumption profile before recommending them.
It goes to the grid and your supplier credits it against your bill — the surplus compensation scheme. The credit is lower than the price you pay for electricity, which is why we size the installation to your consumption rather than to the whole roof. We register the installation with your supplier for you.
Sometimes: grants for self-consumption, and in many municipalities a discount on the annual property tax (IBI) for several years, plus sometimes a discount on the construction tax (ICIO). What is available varies by year and by municipality. We check what applies to your address when we quote and will not budget on a scheme that is not open.
Most do, but orientation (south is best), shading and space matter. We assess your roof, size the installation to produce where it works best, and fix the panels so the waterproofing beneath stays intact. A shaded or north-facing roof may not justify an installation, and we tell you if so.
In stages: a deposit on signing, the balance on completion, with the support claims separate.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey and design from your bills, anywhere in Catalonia. A stated payback with its assumptions.