Services · Barcelona + Catalonia

Turnkey renovations in Catalonia

You hand over the keys and collect them from a finished home. We deal with everything — the project, the permits, the trades, the materials and the final clean — through one person, with a fixed quote and a date.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Turnkey renovation

What “turnkey” should actually mean.

“Turnkey” is used loosely, so it is worth being precise. A genuine turnkey renovation means one company is responsible for all of it: the design, the permits, every trade, the materials, the programme and the final clean. You hand over the keys at the start and you get them back at the end, with nothing for you to coordinate and no decisions to make on the fly.

It does not cost more because of the label. It is the same renovation, with the management and the coordination included. What you pay is the work plus the service of someone dealing with it, within a fixed itemised quote. What you save is time, travel and the headaches of finding, scheduling and chasing a dozen different trades.

It is particularly suited to anyone who cannot be on site: owners abroad, investors, buyers of a second home. The mechanics are photographs and video of progress, decisions by video call and written approvals. For the detail of what a full renovation involves, see full home renovations; for management of a job you are running with your own trades, project management.

Bathroom finished with a site-built bath clad in white mosaic, toilet and a wall painted sage green
How it runs

A turnkey job, step by step.

A flat of 70 to 100 m² typically takes ten to sixteen weeks on site, plus time beforehand for drawings, permits and ordering.

01

Survey and brief

We visit the property, and agree what you want.

02

Design and fixed quote

Drawings and an itemised quote, with materials and appliances named.

03

Permits

We prepare and file whatever the work needs.

04

Build

One site manager coordinates every trade against a written programme.

05

Reporting

Photographs and video of progress, and decisions confirmed in writing.

06

Completion

Snagging, certificates and the final clean.

07

Handover

The keys, the paperwork and the warranty.

How we work

How we run a turnkey job.

01

Free survey

In person or by video. No cost and no obligation.

02

Fixed quote

Itemised, with a written date.

03

One site manager

Responsible for every trade and every decision on site.

04

Keys back

A finished home, with the certificates and warranty.

Why us

Why choose turnkey.

One company responsible

For all of it, with no gaps between trades.

Nothing to coordinate

You do not manage a single subcontractor.

A fixed, itemised price

And a written date.

Works from abroad

Photographs, video and written approvals mean you need not be here.

Paperwork included

Permits, certificates and warranty.

Ready for use or sale

Handed over finished, whether you will live in it, let it or sell it.

Prices

What a turnkey renovation costs.

Per square metre of floor area, VAT excluded.

What a turnkey renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
FunctionalStandard finishes, practical solution550 – 850 €/m²
High specificationPremium materials and high-end interior design1,300 – 2,100 €/m²
Indicative prices · VAT not included. Turnkey does not make the renovation dearer: it is the same work with the management and coordination included, within a fixed and itemised quote, so that you have nothing to deal with. The final figure comes out of the free survey.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate44,000 – 68,000 €Functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of home.

Indicative ranges, VAT excluded.

Small homeUp to 60 m²33,000 – 66,000 €

Everything handled in a compact flat, ready to move into.

Medium home60 – 90 m²48,000 – 95,000 €

The most usual size, with the project, the build and the management included.

Large home90 – 120 m²70,000 – 130,000 €

More floor area, and the same absence of anything for you to deal with.

For investorsRemoteAsk us

Remote reporting, and a handover ready to let or sell.

Be wary of any “turnkey” price that is far below these figures. The usual way a turnkey quote looks cheap is by leaving things out — appliances, permits, a bathroom. We itemise what is in and what is not.

No small print

What is included and what is not.

The scope of a turnkey renovation, and what is separate.

✓ Included in the price

  • Survey, design and drawings
  • Permits and filing
  • All trades, coordinated by one site manager
  • Materials as itemised in the quote
  • A written programme
  • Progress reporting
  • Snagging and the final clean
  • Certificates and a written warranty

✕ Not included — quoted separately

  • Appliances, unless itemised
  • Furniture and decoration
  • Council taxes and fees
  • Architect’s fees where a full project is legally required
  • Hidden problems found on opening, priced as written variations
  • Works needing the owners’ association’s consent

VAT is shown as its own line — 10% or 21% depending on your case, and we confirm which in writing.

Where we work

Where we renovate turnkey.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about turnkey renovations.

What exactly does turnkey mean?

That we deal with everything: the design, the permits, the materials, the trades, the programme and the final clean. You give us the keys and collect them from a finished home, without coordinating anything or making decisions on the fly. One company is responsible for all of it.

Is it more expensive than a normal renovation?

No. It is the same work with the management and coordination included. What you pay is the work plus the service of someone dealing with it, within a fixed quote. In return you save time, travel and the trouble of chasing trades.

I do not live in Barcelona. Can you handle everything?

Yes — it is one of the cases turnkey suits best. Progress is shown with photographs and video, decisions are made by video call and confirmed in writing, and you receive the home ready to live in, let or sell without having to be here.

How much does a turnkey renovation cost?

Roughly 550 to 850 €/m² for a functional specification, 800 to 1,100 €/m² for mid-range and 1,300 to 2,100 €/m² for high specification, excluding VAT. A 60 to 90 m² home runs from about 48,000 to 95,000 €.

What is not included?

Whatever the quote says is not: typically appliances unless itemised, furniture and decoration, council taxes, and any hidden problem found when the walls are opened, which is priced as a written variation for your approval before it is carried out.

Free quote

Get a turnkey quote.

Free survey, in person or by video, in English. A fixed quote and a written date.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →