Hospitality · Barcelona + Catalonia

Bar renovations in Catalonia

In a bar the counter is the stage and the atmosphere is everything, but behind it sit the technical works: extraction, soundproofing to the neighbours, accessible toilets and an activity licence you must meet to open.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Bar renovation

Atmosphere on the surface, soundproofing underneath.

The atmosphere of a bar is made of things customers notice without analysing: the light, the counter, the music and the materials. It is also made of things they never see, and these are what decide whether you can stay open. Chief among them is sound: a bar below flats lives or dies by how well the ceiling and the party walls contain it.

Next is extraction. A bar that only pours drinks needs less than a restaurant, but one that serves food needs a way of getting fumes to the roof, and that can be a hard item in an existing building. The rest is the layer of requirements that applies to any public venue: accessible toilets, fire protection, ventilation and a capacity limit set by the activity project.

A bar is generally cheaper per square metre than a restaurant, because there is less kitchen, and a unit that was a bar before starts ahead. We build the counter to measure, design the lighting in scenes, and put the acoustic work where it counts. If you are planning a kitchen-led venue, see restaurants; for a daytime café, cafés.

Oak bar with sink and material boxes on the worktop during fit-out
How it runs

Renovating a bar, step by step.

Six to fourteen weeks of building. The activity licence runs in parallel and often sets the opening date.

01

Survey and feasibility

Before you sign: the neighbours above and beside, the extraction route if you will serve food, and the unit’s previous use.

02

Activity project and licence

A registered technician drafts the activity project and we file it with the council.

03

Strip-out

Previous fit-out out and services located.

04

Acoustic work

Insulation to ceiling and party walls, a floating floor where needed and quiet ventilation.

05

Services

Electrics, lighting, plumbing, drainage, ventilation, air conditioning and, if you serve food, extraction.

06

Counter, toilets and fit-out

The bespoke counter, accessible toilets, seating, lighting scenes and finishes.

07

Inspection and handover

Final certificates and technician’s sign-off, then handover on the agreed date.

How we work

How we run a bar project.

01

Pre-lease survey

We visit before you commit and tell you what the unit needs and whether the neighbours are likely to be a problem.

02

Fixed quote, separate project

A fixed itemised quote, with the activity project shown separately.

03

Build to a written date

One site manager coordinates the trades against a written programme.

04

Handover with the paperwork

Certificates and the documents you need to open lawfully.

Why us

Why use us for your bar.

Soundproofing designed in

The acoustic work is specified first, because it is what protects your licence.

A counter built to measure

Made for your workflow and your look, not chosen from a catalogue.

Compliance first

Accessible toilets, fire protection and capacity limits sorted in the activity project, before the finishes.

Lighting that makes the room

Layered lighting in scenes, because it does more for atmosphere than any finish.

One site manager

Every trade coordinated by one person.

Honest about the neighbours

We tell you at the survey if the unit’s position makes the noise a real risk.

Prices

What a bar renovation costs.

Per square metre of floor area, VAT excluded. Equipment is separate.

What a bar renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
Basic fit-outStandard finishes, practical solution500 – 800 €/m²
Designer / high-endPremium materials and high-end interior design1,300 – 2,000 €/m²
Indicative prices · VAT not included. A cocktail or tapas bar usually costs somewhat less than a restaurant because it has less kitchen, but soundproofing and extraction remain the key items. A unit that was already a bar starts ahead. Everything is itemised, with the activity project shown separately.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate40,000 – 64,000 €Basic fit-out · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of bar.

Indicative ranges for the building works, VAT and equipment excluded.

Small barUp to 60 m²35,000 – 90,000 €

Neighbourhood and tapas bars. The counter, accessible toilets and soundproofing set the minimum.

Medium bar60 – 150 m²70,000 – 200,000 €

The most common size, with a counter, a seating area and a back-of-house room.

Large bar / with kitchenOver 150 m²From 180,000 €

Large venues or those with a full kitchen. Extraction and air conditioning on a larger scale.

Activity projectTechnical procedureFrom 1,800 €

The project and supervision for the licence, quoted separately.

Opening hours and music are set by the licence and your neighbours, not by what you would like. A bar below flats has the strictest limits and the highest risk, and it is worth being clear-eyed about that before you take the unit.

No small print

What is included and what is not.

The scope of a turnkey bar fit-out, and what is separate.

✓ Included in the price

  • Survey and feasibility assessment
  • Strip-out and clearance
  • Acoustic insulation to ceiling and party walls
  • Electrics and lighting scenes, with certificate
  • Plumbing, drainage and ventilation
  • Air conditioning
  • Extraction, if you serve food
  • Accessible toilets
  • Bespoke counter and fit-out
  • Final certificates and a written warranty

✕ Not included — quoted separately

  • Activity project, supervision and licence fees, quoted separately
  • Bar equipment, fridges and glass-washers, unless itemised
  • Furniture and decoration
  • Sound systems, unless itemised
  • Council taxes and fees
  • Landlord’s works and approvals

VAT is shown as its own line — normally 21% on works for a business.

Where we work

Where we renovate bars.

Bars in Barcelona and across Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What bar owners ask before fitting out.

How do I avoid noise problems with the neighbours?

By building the acoustic work properly and by being realistic about the venue’s position. Acoustic insulation to the ceiling and party walls, a floating floor where there are flats above and a quiet ventilation system are the foundation. Beyond that, limit the sound inside the licence, control the doors and the pavement. A bar below flats is the highest-risk configuration there is, and the survey will tell you honestly how risky yours is.

Do I need fume extraction for my bar?

Only if you cook. A bar that serves drinks and cold food needs ventilation but not full fume extraction; one that fries or grills does, and needs a route to the roof. Establishing which you are is the first step, because it affects both the licence and the cost. If a kitchen is part of the plan, see restaurants.

How much does a bar renovation cost?

Roughly 500 to 800 €/m² for a basic fit-out, 800 to 1,300 €/m² for mid-range and 1,300 to 2,000 €/m² for a designer scheme, excluding VAT and equipment. A 100 m² bar at mid-range comes to around 80,000 to 130,000 € for the works. The activity project is on top.

Can you build the counter to measure?

Yes, and we recommend it. The counter is the centre of a bar’s operation and its look, and a bespoke one built around your workflow — the position of the taps, the fridges and the till — is far better than a catalogue unit adapted to fit. We design it with you and build it as part of the fit-out.

How long does it take?

Six to fourteen weeks of building, depending on size and on the acoustic work. The licence runs in parallel and often sets the opening date, and we tell you honestly when that is the case.

How is it paid for?

In stages tied to completed work: a deposit on signing, payments at the end of each phase, and a final payment at handover. Never the full amount in advance.

Can you survey a unit before I take it?

Yes. For a bar the things that matter most — the neighbours, the extraction route and the unit’s previous use — are invisible in a listing and decide whether the venue is viable. Ask for a survey.

Free quote

Get a quote for your bar.

Free survey, including before you sign the lease. Soundproofing assessed first.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →