Renovations · Pineda de Mar

Full home renovations in Pineda de Mar: apartments, old centre and flats by the sea

We renovate in this Alt Maresme town: holiday apartments, the old centre and flats by the sea. A quick, durable renovation that resists salt air. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Pineda de Mar
Pineda de Mar
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in Pineda de Mar
Warrantyon the work
Renovations in Pineda de Mar

Renovating in Pineda de Mar,
with no surprises.

Pineda de Mar, in the Alt Maresme, is a town that is both residential and tourist: apartments and second homes by the beach, a traditional old centre and neighbourhoods of flats. The typical renovation here is quick, durable and low-maintenance, with salt air always in the picture. We know that housing stock, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Brick wall painted orange next to the kitchen doorway, with a bag and building materials on the floor
Who it is for

Full renovations built around you.

These are the people we mostly work with in Pineda de Mar. If you recognise yourself in one of them, we are a good fit:

Owners buying an older home

You have just bought — or are about to — an older building or house and want to make it yours, with new services and no surprises.

Families who want to re-plan their home

You need more light, one more bedroom or an open kitchen: we reorganise the layout so the house fits the way you live.

Investors looking to add value

You buy to renovate and sell or to let: we balance cost and finishes to get the most value out of the property.

Second-home owners

You are preparing a holiday home or a rental: a durable, low-maintenance renovation, with the habitability certificate and the energy certificate in order.

By type of building

Every building in Pineda de Mar calls for a different renovation.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.

01

Apartments and second homes

By the beach: a renovation resistant to salt air, low-maintenance and ready to enjoy or let.

02

Old-centre buildings and houses

A traditional core with houses between party walls and buildings to restore.

03

Residential blocks and flats

Poblenou, Can Xaubet: services to renew and space to optimise.

04

Flats for holiday letting

A quick, profitable renovation of kitchen, bathroom and efficiency, with the certificates up to date.

How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Why Tu Nuevo Piso

Why renovate with us in Pineda de Mar.

We know the housing stock here

From the stone masía to the flat of the 1970s: we know what each type of building in Pineda de Mar hides and what has to be renewed whatever happens.

Planning rules and the council

We file works notifications and licences with the relevant council, and coordinate with the community when common elements or the façade are touched.

A dedicated site manager

A single contact for the whole renovation, with regular photos and video of progress. No chasing five trades.

Fixed quote

A fixed price broken down item by item after the survey. What we sign is what you pay, with no last-minute extras.

Trusted trades in the area

Bricklayers, plumbers, electricians and joiners we already know, under one contract and one programme.

Warranty and technical support

A written warranty on the work, with a registered technical architect when the project needs one.

Prices

What it costs to renovate in Pineda de Mar.

Indicative ranges in Pineda de Mar, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in Pineda de Mar — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in Pineda de Mar

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Every job has its own procedure: minor works notification, major licence, building inspection, habitability certificate… We deal with it all with the relevant council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

Grants

Grants for renovating in Pineda de Mar.

If your renovation improves energy efficiency, you can recover part of the investment. We help you apply.

Next Generation funds

Grants for energy retrofits (insulation, windows, aerothermal heating), managed in Catalonia by ICAEN. We prepare the certificate and the application.

Agència de l’Habitatge de Catalunya

The Generalitat and the county councils publish calls for the renovation of homes and buildings. We assemble the technical documentation needed.

Income-tax deduction

For works that reduce the energy demand or consumption of the home. They apply according to the call and with the right documentation; we guide you.

What we renovate

Everything we renovate in Pineda de Mar.

From the full renovation to a single trade. These are our most requested services.

See all services →
Where we work

Pineda de Mar neighbourhoods where we renovate.

We work across the whole area, with crews who know each type of home in Pineda de Mar.

We renovate mainly in:

Seafront

Apartments and second homes by the beach: a renovation resistant to salt air.

Centre

Traditional old centre with houses and buildings to restore and renovate.

Poblenou

Residential fabric where we renew services and efficiency.

Can Xaubet and Les Creus

Residential housing with a renovation from start to finish.

And also in:

SeafrontCentrePoblenouCan XaubetLes CreusDosrius
Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in Pineda de Mar: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in Pineda de Mar?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. An apartment of 60–85 m² usually lands between 24,000 and 50,000 €. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in Pineda de Mar?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in Pineda de Mar?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

Do you renovate apartments for holiday letting?

Yes. We carry out quick, durable, low-maintenance renovations — kitchen, bathroom, floor and efficiency — resistant to salt air, with the habitability certificate and the energy certificate so you can let.

However it is searched for, is it the same service?

Yes: “full renovation in Pineda de Mar” and “apartment renovation in Pineda de Mar” are different ways of writing the same need, and all of them get the same quote fixed item by item after the free visit.

What does a full renovation in Pineda de Mar include, and how is it quoted?

A full renovation in Pineda de Mar is a complete job on the home, with a single site manager who coordinates all the trades from start to finish. Before quoting we make a free, no-obligation technical visit. Then we give you a fixed quote itemised by chapter, in writing, with the timescale of the job set in the same document.

Free quote

Ask for your quote, no strings attached.

A free technical visit in Pineda de Mar and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →