From a leak that will not stop to renewing the whole water installation: we replace old pipes, change waste stacks, fit sanitaryware and leave your plumbing with no surprises and no damp.
Plumbing is invisible until it fails, and then it is the most expensive thing in the flat. In a Catalan building of any age the pattern is familiar: lead or galvanised supply pipes that have furred up, cast-iron waste stacks that have corroded from the inside, and joints that weep behind tiles for years. The result is low pressure, rust-coloured water and a damp patch in the flat below.
The cheapest moment to renew pipes is when the walls are open. In a renovation, replacing the supply and waste in the kitchen and bathrooms costs very little extra, and doing it afterwards means opening everything again. For a flat that is not being renovated, we locate the leak, repair it, and tell you honestly what the condition of the rest suggests.
Waste stacks and risers are usually common property, so replacing them is a decision for the owners’ association. The branches inside your flat are yours. We tell you which is which. For a leak that has already caused damp, see damp treatment, and for a bathroom or kitchen renovation, bathrooms and kitchens.

A visit for a repair; a few days for a bathroom; one to two weeks for a whole flat.
We locate the leak or assess the installation, using pressure testing and, where useful, thermal imaging.
The affected section is isolated so the rest of the flat keeps water.
As little of the wall or floor as possible is opened.
New supply and waste in modern materials, with correct falls and proper joints.
The new pipework pressure-tested before it is covered.
Walls and floors closed and repaired.
Warranty and a note of the position of the pipes.
We find the problem. Small repairs are done quickly.
A fixed price once we have seen the problem.
Done cleanly, with the water back on the same day where possible.
Warranty on the work.
Pressure testing and detection, so we open one wall, not three.
Every new joint is pressure-tested while it can still be reached.
If the rest of the installation is near the end of its life, we say so.
We tell you which pipes are yours and which the building’s.
Plumbing coordinated with the tiler, the electrician and the joiner.
On the materials and the workmanship.
Indicative ranges, VAT excluded.
| Work | What it covers | Indicative range (€) | |
|---|---|---|---|
| Repair / leak | Standard finishes, practical solution | 80 – 400 € | |
| Renewing a bathroom or kitchen | Selected materials, best balance | 600 – 2,000 € | |
| Whole-home installation | Premium materials and high-end interior design | 2,000 – 5,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Locating and repairing leaks and blockages, or replacing taps and fittings.
Renewing the plumbing of a complete bathroom or kitchen.
New supply, risers and waste throughout the home.
Replacing old stacks, with the agreement of the owners’ association.
Lead pipes in particular are worth replacing regardless of leaks, because they can contaminate drinking water. If your building dates from before the 1970s and nobody has checked, it is a question worth asking at the survey.
The scope of a plumbing job, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
Plumbing connects bathrooms, kitchens, damp and heating.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about plumbing.
Usually, yes. Water often travels along a pipe or a slab before it shows, so the stain is rarely under the leak. We use pressure testing, acoustic detection and, where useful, thermal imaging to find the point, so that we open the smallest possible area to repair it. Treating the stain without finding the leak is the commonest and most expensive mistake.
Lead should be, regardless of leaks, because it can contaminate drinking water. Galvanised iron furs up and corrodes from the inside, which reduces pressure and discolours the water, and eventually leaks. The cheapest time to replace them is when you are already opening the walls for a renovation.
Yes, but they are common property, so it needs the agreement of the owners’ association, and we coordinate with the administrator. We produce a survey and a quote for the meeting, and plan the work to keep the water on for residents as much as possible. See works for residents’ associations.
Roughly 80 to 400 € for a repair or leak, 600 to 2,000 € to renew the plumbing of a bathroom or kitchen, and 2,000 to 5,000 € for a whole flat, excluding VAT.
Yes, as a matter of course. The supply and waste inside the room are replaced while the walls and floor are open, because the extra cost is small and the alternative is opening everything again. See bathroom renovation.
Small repairs on completion; larger work in stages tied to completed work.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey for larger jobs anywhere in Catalonia. Leaks located before anything is opened.