A well-planned storage room multiplies its capacity and protects what you keep in it: made-to-measure shelving, good light, ventilation against damp and a secure enclosure. Little building work, a lot of order gained.
A trastero is the small storage room that comes with many Spanish flats, usually in the basement or on the roof. Most are a jumble of boxes in the dark, and a lot of what is kept in them is damaged by damp. The good news is that few jobs return so much for so little: shelving, light and ventilation are most of it.
Made-to-measure shelving uses the full height of the room and gets everything off the floor, which is where damp does its damage. Good lighting makes it a place you can find things. And ventilation, or a small dehumidifier circuit in a damp room, protects what you keep. If the enclosure is flimsy, we replace it with a proper partition and a lockable door.
If the problem is serious damp, the storage room is not the real project: see damp treatment or, for a whole basement, basement renovation. For storage inside the home, fitted wardrobes are a separate job. For a garage, see garages.

A day or two for shelving and light; up to a week if the enclosure or damp needs work.
We measure, check for damp, and discuss what you keep and how often you need it.
A damp problem is dealt with before anything goes in.
A new partition or door if the existing one is flimsy or insecure.
A circuit and good lighting.
Ventilation or a dehumidifying solution for damp rooms.
Made-to-measure shelving using the full height, off the floor.
Snagging and handover.
We measure and listen to what you keep. No cost and no obligation.
An itemised quote, with shelving and enclosure priced separately.
Most storage rooms are done in a day or two.
A written warranty.
Shelving that uses the full height holds far more than boxes on the floor.
We check before we fit, because shelving does not cure a wet wall.
A proper partition and a lockable door.
A room you can actually find things in.
Small jobs done properly, without drama.
A fixed quote, even for a small job.
Indicative ranges, VAT excluded.
| Work | What it covers | Indicative range (€) | |
|---|---|---|---|
| Light + shelving | Standard finishes, practical solution | 600 – 1,800 € | |
| Complete renovation | Selected materials, best balance | 1,800 – 4,500 € | |
| New enclosure | Premium materials and high-end interior design | From 800 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
The most common. Made-to-measure shelving and light for the best use of space.
Room for organised storage and sometimes a small workbench.
Almost a small warehouse; it can be zoned by use.
Fitting shelving and bespoke storage without any other building work.
In a block of flats the storage room is often part of the common structure, so check before you move a wall or run new electrics. We confirm what you can alter.
The scope of a storage room renovation, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
Small spaces often connect to damp, electrics and joinery.
Storage rooms across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about storage rooms.
Get everything off the floor, onto shelving at least 15 cm up, and give the room air. Leave a gap behind the shelving, avoid cardboard and use plastic boxes. If the walls are actually wet, shelving will not solve it — the damp has to be diagnosed and treated. See damp treatment.
Yes, in nearly every storage room. Standard shelving wastes the awkward spaces and the height, and made-to-measure uses all of it. It increases usable capacity and makes everything accessible.
Yes. A partition and a lockable door turn an open corner into a secure room. In a shared garage, check the owners’ association’s rules first. We can advise on what you are allowed to do.
Roughly 600 to 1,800 € for light and shelving, 1,800 to 4,500 € for a complete renovation, and from 800 € for a new enclosure, excluding VAT.
A day or two for shelving and light; up to a week if there is an enclosure or damp.
On completion for small jobs; in stages for anything larger.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. A fixed price, even for a small job.