Renovations · Badalona

Full home renovations in Badalona: old town, blocks and flats by the sea

We renovate from Dalt de la Vila and the Centre to the neighbourhoods of Llefià, La Salut or Gorg. We know the old-town houses, the blocks of the ’60s–’70s and the damp of the coast. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Badalona
Badalona
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in Badalona
Warrantyon the work
Renovations in Badalona

Renovating in Badalona,
with no surprises.

Badalona, Catalonia’s third-largest city, mixes an old town on the seafront (Dalt de la Vila, with Roman remains), a fabric of blocks from the ’60s–’70s in Llefià, La Salut or Sant Roc, and the waterfront of the Gorg. The old-town buildings call for a fine hand and the blocks for a complete renewal of the services. We know that housing stock and its coastal damp, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Badalona building entrance with the beige marble staircase finished, glass balustrade and lift at the far end
By type of building

Every building in Badalona calls for a different renovation.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.

01

Old-town houses (Dalt de la Vila)

Historic buildings between party walls, with old structure, damp and narrow streets. Careful restoration and, in areas with remains, attention to heritage.

02

Blocks of the ’60s and ’70s

Llefià, La Salut, Sant Roc: flats with worn-out services and no insulation. Full renewal of plumbing, electrics, windows and doors and layout.

03

Flats by the sea

Gorg and the waterfront: a renovation that stands up to damp and salt, with good ventilation and low-maintenance finishes.

04

Units and ground floors

Changes of use and conversions from unit to home or business in the Centre and the shopping streets, with the activity licence.

A real job in Badalona

An accessible entrance on Carrer del Mar in three weeks: marble, ramp and stair lift

The entrance steps were worn down to the stone and the building needed to solve accessibility without waiting for a full restoration. The steps were demolished one by one to the base and formed again in beige marble, to match the hall’s skirting. On the entrance flight a ramp and a folding stair lift were added, which takes up almost no room when folded and, unfolded, covers the whole height difference up to the lift; the balustrade is glass, so as not to darken an entrance that was already narrow.

Everything was done with the entrance in use: a route protected with tape and boards, work in sections and the neighbours coming and going every day. Three weeks of work. It is small in square metres and big in what it changes for the neighbours.

  • 20 m² · 3 weeks · entrance in use throughout
  • New beige marble steps and an access ramp
  • Folding stair lift up to the lift
  • Glass balustrade so no light is lost
See the full project page →
New beige marble steps freshly laid in an entrance in Badalona
Entrance steps demolished down to the base
Before: the steps demolished one by one down to the base.
The entrance under works with the ramp and the stair lift folded
During: ramp formed and stair lift installed, the route protected.
The finished entrance stairs with a glass balustrade
After: marble, ramp and glass balustrade.
Owners’ communities

Accessibility and building inspections in Badalona’s buildings: work in sections, without closing the entrance

Badalona has thousands of blocks from the ’60s and ’70s in Llefià, La Salut, Sant Roc or Artigues, built without a lift or with entrances with high steps. For the community, the most worthwhile job is usually accessibility: a ramp at the entrance, a stair lift or platform up to the lift, handrails and light. It is done in sections, with the route protected, and coordinated with the administrator so nobody stops getting into their home.

Buildings with homes must pass the ITE (building inspection) in Catalonia before they reach 45 years of age, with some exceptions, and its deficiencies — downpipes, façade, roof — become the next quote. We prepare the inspection with our technical architect and, when there is a metropolitan call for grants for renovation or accessibility, we assemble the technical documentation it asks for.

  • Ramps, stair lifts and balustrades with the entrance in use
  • Building inspection with a registered technician and a repair plan
  • Technical documentation for renovation grants
Folded stair lift beside the steps under works in a Badalona entrance
Llefià, La Salut and Sant Roc

Block flats of the ’60s–’70s: original services, damp and little light

The typical flat in these neighbourhoods is 60–75 m², with a corridor, an enclosed gallery and the original services: iron plumbing, a consumer unit with no RCD or earth, old downpipes. A full renovation here is above all technical — renewing everything that runs inside — and about layout: opening the kitchen, taking in the gallery, swapping the bath for a shower.

Two things peculiar to Badalona: the coastal damp, which calls for cross-ventilation and paint and joinery that withstand salt; and, in Sant Roc, the neighbourhood’s structural history, where some of the original blocks were replaced. In those that remain, we check floors and beams at the technical visit before giving a price.

  • New plumbing, electrics and drains with certificates
  • Gallery taken in and an open kitchen
  • Floors checked in blocks of the ’60s–’70s
New marble steps with the protective tape during the works
Dalt de la Vila and Centre

Renovating in the old town: narrow streets, heritage and permits

Dalt de la Vila sits on Roman Baetulo and the Centre keeps casas de cós and houses from the early twentieth century. Here the renovation starts with the permit: prior notification at Badalona’s Ajuntament for interior work, a licence with a project if the structure or façade is touched, and in the protected area a heritage report and, when there is excavation, archaeological monitoring. We handle it and put it in the quote.

The logistics differ too: in pedestrian streets like Carrer del Mar material comes in during loading and unloading hours and the skip needs a permit to occupy the public highway. We plan it with the site manager so the work is never held up by a permit.

  • Prior notification or a licence with a project, depending on the work
  • Heritage report and archaeological monitoring where required
  • Loading, unloading and skips sorted on pedestrian streets
The stairs of a Badalona entrance under works with the route protected
How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Projects

Renovations completed in Badalona.

A selection of renovations in Badalona. Each project with its type, location and the work carried out.

Prices

What it costs to renovate in Badalona.

Indicative ranges in Badalona, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in Badalona — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in Badalona

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Every job has its own procedure: minor works notification, major licence, building inspection, habitability certificate… We deal with it all with the relevant council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

What we renovate

Everything we renovate in Badalona.

From the full renovation to a single trade. These are our most requested services.

See all services →
Pages for this city

Services with a page of their own in Badalona.

How we handle each of these services in Badalona, with prices and examples from the area.

Where we work

Badalona neighbourhoods where we renovate.

We work across the whole area, with crews who know each type of home in Badalona.

We renovate mainly in:

Dalt de la Vila and Centre

Historic old town by the sea with old buildings and shops: careful restoration and full renovation.

Llefià and La Salut

Dense blocks of the ’60s–’70s where we renew services, damp-proofing and efficiency.

Gorg and the waterfront

Flats by the beach: a renovation that resists salt and damp, with low maintenance.

Sant Roc and Artigues

Housing from the great expansion, where we optimise layout and comfort.

And also in:

Dalt de la VilaCentreProgrésLlefiàLa SalutSant RocGorgArtiguesBufalàCanyadóPomar

Neighbourhoods of Badalona with a page of their own:

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in Badalona: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in Badalona?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. A flat of 70–90 m² usually lands between 28,000 and 55,000 €; an old-town house, more. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in Badalona?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in Badalona?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

Do you renovate old houses in Dalt de la Vila?

Yes. We work on the old town’s historic buildings with the care they call for: old structure, damp and narrow streets, with attention to heritage in the areas with Roman remains and difficult access, which we plan from the quote.

My flat is near the beach: do you take that into account?

Yes. On the seafront we use joinery and ironmongery resistant to corrosion, anti-damp treatments and low-maintenance finishes, so the renovation lasts without salt problems.

Do you carry out accessibility works for communities in Badalona: ramps, stair lifts?

Yes. On Carrer del Mar we rebuilt a community’s entrance in three weeks: new marble steps, an access ramp, a folding stair lift up to the lift and a glass balustrade. We quote the community item by item and coordinate with the administrator.

Can the entrance be renovated without closing access for the neighbours?

Yes, and that is how we do it: work in sections, a route protected with tape and boards, and the neighbours coming and going every day. At the Carrer del Mar entrance, nobody was kept out of their home during the three weeks.

My building is in Dalt de la Vila: does the renovation have special conditions?

It may. The old town is a protected area: interior work goes by prior notification, but if the façade or structure is touched, or there is excavation, the Ajuntament may ask for a heritage report and archaeological monitoring. We check before quoting and handle the paperwork ourselves.

Do you renovate houses in Badalona?

Yes — casas de cós in the Centre, ground-floor homes with a patio and houses in the upper neighbourhoods. A complete house renovation in Badalona includes structure if needed, new services and finishes, with a quote fixed item by item and a single site manager.

However it is searched for, is it the same service?

Yes: “full renovation in Badalona”, “flat renovation”, “complete flat renovation” and “detached-house renovation” are different ways of writing the same need, and all of them get the same fixed quote, item by item, after the free visit.

Can I include replacing the floors in a full renovation in Badalona?

Yes. A full renovation with new floors in Badalona usually goes together with renewing the services, because the new chases and drains run through the floor. If the original paving is worth it — terrazzo or hydraulic tile in good condition — we judge on the visit whether to keep it or replace it, and the decision is written into the quote. Restoring an original floor is part of the same decision.

Do you renovate detached houses and houses with a garden in Badalona?

Yes. A full renovation of a detached house in Badalona adds to the interior work the roof, the façade, the garden and, if there is one, the pool. A single site manager coordinates it with one programme and a quote fixed by chapter, so the house is handed over in one go.

Free quote

Ask for your quote, no strings attached.

A free technical visit in Badalona and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →