Renovations · Badalona

Kitchen renovations in Badalona

Kitchens renovated in casas de cós and block flats in Badalona: layouts that use every inch, services brought up to date and a quote fixed item by item.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Kitchen renovation

Renovating the kitchen in Badalona.

In Badalona two very different kitchens live side by side: that of the casa de cós — narrow, at the back of the home, with the yard behind — and that of the sixties block in Llefià or La Salut, designed for another way of living and closed in on itself. We renovate both, and almost never in the same way.

In the casas de cós of the Centre, Progrés or Casagemes the move is almost always the same: open the kitchen to the dining area and let the light in from the yard. The bay is narrow, so we build the run in a line or a compact L, with the wet zone beside the yard so that it ventilates properly and does not depend only on the hood.

In the block flats the challenge is size and services. A parallel layout, tall units up to the ceiling to gain storage, and while we are at it we bring up to date what you cannot see: many of these buildings still run on gas with little contracted power, and switching to induction — with its certificate — leaves the kitchen ready for twenty more years. So close to the sea, too, we choose ironmongery and mechanisms that withstand salt.

The paperwork is on us: we file the prior notification (comunicat previ) with Badalona’s Ajuntament and, if a partition has to be touched, we go with a technical project. With the community we agree hours, protect staircase and lift, and the rubble comes down in sacks with its occupation permit. The job is noticed just enough.

And a Badalona classic: the lavadero. That glazed metre and a half behind the kitchen is worth gold — sometimes it is absorbed into the work run, sometimes it stays as a drying gallery and pantry. We decide it with you by measuring, not by habit.

The old kitchen with a granite worktop and a white oven
By neighbourhood

Every Badalona neighbourhood, with its typical job.

Each neighbourhood has its own kind of building behind the front door.

Centre and Dalt de la Vila

Buildings with history, walls that are not straight and the odd hidden timber beam. The kitchen is designed on what is there, with complete new services and the heritage procedure sorted when the building requires it.

Llefià and La Salut

Compact flats of the sixties with the kitchen by the entrance. A parallel run, an oven-and-microwave tower and the laundry integrated where there is one: these are the kitchens where we recover the most usable metres.

Casagemes and Canyadó

Three streets from the beach salt rules: treated ironmongery, appliances that do not pit and cross-ventilation using the gallery. Ground-floor houses with a yard where the kitchen can at last look outwards.

Morera, Pomar and Sant Crist

Estate blocks with sound structure and tired finishes. Very rewarding jobs: services brought up to date, a partition out if it suits and a kitchen that suddenly looks like it belongs to another flat. Contained budgets and short timescales.

Prices

What a kitchen renovation costs.

Indicative ranges by specification and appliances, VAT excluded. The final figure comes from the survey.

What a kitchen renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversIndicative range (€)
FunctionalStandard finishes, practical solution4,800 – 7,500 €
Design / high endPremium materials and high-end interior design13,300 – 19,500 €
Indicative prices · VAT not included. The kitchen is the room where the range is widest, because appliances, the worktop and the units can multiply the cost on an identical layout. Opening the kitchen into the living room typically adds 1,500 to 4,000 € depending on the wall and whether it carries load. We itemise all of it so you can choose where the money goes.
Calculator

What might your new kitchen cost?

Indicative estimate4,800 – 7,500 €Functional · Medium (8–12 m²)
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by kitchen size.

Indicative ranges for a full kitchen renovation, VAT excluded.

Small kitchenUp to 8 m²4,800 – 17,400 €

The galley kitchen of a city flat. Made-to-measure storage is what makes these work, and it is where the budget should go.

Medium kitchen8 – 14 m²5,000 – 18,600 €

The most common size. Enough room for a breakfast bar or a peninsula and a proper run of worktop.

Large kitchenOver 14 m²5,900 – 19,500 €

Island and dining space. At this size the design and the appliances set the price, not the square metres.

Opened into the living roomOpen-planFrom 15,000 €

The single change that transforms a flat most. Add the partition and structural item on top of the kitchen itself.

In a kitchen the floor area matters less than the material grades, the worktop and the appliances. That is why we price a specific design rather than a rate per square metre — and why the quote names what is in it.

No small print

What is included and what is not.

The scope of a turnkey kitchen renovation, and what normally sits outside it.

✓ Included in the price

  • Strip-out, clearance and removal of the old kitchen
  • New water supply, waste runs and extraction duct
  • Dedicated appliance circuits with electrical certificate
  • Splashback tiling or cladding, and the floor
  • Base and wall units and the worktop
  • Sink, tap and extractor hood
  • Task lighting and general lighting
  • Fitting and integration of appliances you supply
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Appliances, other than those itemised in your quote
  • Pans, crockery and small accessories
  • Opening the kitchen into the living room, unless itemised
  • Relocating the boiler or the gas installation, unless planned
  • Council taxes and fees where they apply
  • Loose furniture and decoration

VAT (10% or 21% depending on your case) is always shown as its own line. If you are supplying the appliances we will fit and integrate them — just tell us the models before we design the units, because a freestanding fridge and an integrated one need different openings.

In the same town

Other services in Badalona

The same team and the same fixed quote, for the rest of the home in Badalona.

The same work, elsewhere

Kitchen renovations in other cities

Each city has its own housing stock, its own buildings and its own permits.

Common questions

Frequently asked questions

Kitchen renovations in Badalona: answers from the site, not the brochure.

How much does it cost to renovate a kitchen in Badalona?

A complete functional kitchen comes to between 4,800 and 7,500 € excluding VAT; at mid-range specification, between 6,600 and 10,300 €. What moves the figure most in Badalona is not the units: it is whether the building forces you to redo the services or to carry material up a narrow staircase. After the visit, the quote is fixed and itemised.

I have a casa de cós: can the kitchen be opened to the dining room?

It is the most natural renovation for this type of house, and the one that transforms it most: the plan is narrow and long, and joining kitchen and dining room with the yard at the back brings natural light where there never was any. If the wall turns out to be load-bearing it can still be opened, with a calculated lintel and a project. The result always justifies it.

My kitchen is a corridor: can it really be made to work?

Yes — the blocks of Llefià, La Salut or Sant Crist are full of kitchens like this and they can be made to work: a parallel or L run, tall units up to the ceiling, tower appliances and a continuous worktop with no steps. You do not gain metres, but you gain twice the usable space and a kitchen where two people fit at once.

Can I get rid of the gas and switch to induction?

In most cases yes, and we recommend it: out go the flow boiler and exposed pipes, in come an induction hob and electric or aerothermal hot water, depending on the case. The contracted power has to be checked and the installation legalised with its certificate — we handle it, gas disconnection included.

Which materials stand up best so close to the sea?

Salt takes its toll on anything metallic: hinges and runners with anti-corrosion treatment, sealed mechanisms in the gallery and porcelain above anything that absorbs damp. And well-solved extraction, because in Badalona the ambient humidity already comes as standard and the kitchen should not add its own.

Do I need permission from Badalona’s Ajuntament?

To change the kitchen without touching the structure the prior notification is enough, which we file and which does not delay the start of the job. Knocking down the partition with the dining room needs a project if it is load-bearing. In old-town buildings it is worth checking before designing anything — we do it on the visit.

How long does the job take and how will my neighbours experience it?

Between two and four weeks depending on what is touched. We agree noise hours with the community, protect common areas and leave the landing clean every afternoon. In blocks with a tight staircase we allow for it from the quote: carrying material up and down is part of the job too.

Do you do kitchens in all the neighbourhoods of Badalona?

In all of them — from the Centre and Dalt de la Vila to Llefià, La Salut, Morera, Pomar or the Gorg — and also in Montgat, Tiana and Sant Adrià de Besòs. The technical visit is free across the whole area.

What if my building has no lift?

It is common in Llefià and La Salut, and it is allowed for as standard: a crew sized to carry material up by hand, a skip at street level and the staircase protected from top to bottom. It does not make the quote dearer by surprise — it is counted from the start.

Do you also renovate the laundry behind the kitchen?

Almost always at the same time, because they share services and little extra time is lost. It is tiled, the drying-gallery plumbing is tidied and, if you want, it is closed in with new joinery to turn it into a pantry or a proper laundry area.

How long is it between the visit and the start of the job?

Normally between one and three weeks: free visit, a fixed quote within a few days, units and materials ordered, and we start when the bulk arrives. The notification to Badalona’s Ajuntament does not hold up the calendar — it is filed and we get to work.

Open or closed kitchen? I am not sure.

There is no single answer and be wary of anyone who has one: if you cook every day with frying and sofrito, a closed one with a good glazed door keeps the smells in; if the kitchen is also where homework gets done and guests are received, open with serious extraction. On the visit we talk it over with your plan in front of us and show you real cases of both.

While you are at it, can you paint the rest of the flat?

It makes complete sense: the painters are already in, the flat is already protected and the general touch-up comes out cheaper than as a separate job. Ask for it when quoting and we itemise it separately, so you decide with both figures in view.

Free quote

Get your kitchen quote in Badalona

Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →