Kitchen renovation with a marble worktop in El Guinardó, Barcelona
Carrer de Praga, Barcelona · 8 m² · 2026

Project details
- Floor area
- 8 m²
- Property type
- Flat
- Duration
- 5 weeks
- Year
- 2026
- Status
- In progress
- Budget
- 11,500–12,200 €
- What we did
- Kitchen with a peninsula · Marble worktop and splashback · Undermount sink · Bedroom with a made-to-measure headboard
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
A white kitchen with a peninsula, a marble worktop and splashback and an undermount sink, plus a bedroom with a made-to-measure wooden headboard.
A one-piece marble worktop is the part of a kitchen that allows no improvisation: the real opening is measured, it is cut in the workshop and there is only one chance to fit it properly. The photos of the installation are here for that reason.
The splashback rises in the same material, with an undermount sink so that you can sweep the worktop without catching on an edge. The units are in white so that the stone leads.
While at it, the bedroom was also finished, with a made-to-measure wooden headboard and new laminate flooring. A kitchen renovation in El Guinardó where the expensive material was used where it is touched and seen.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.





