Enter the floor area and the rooms and get an indicative range straight away, broken down line by line. No sign-up and no email: the result appears on the spot.
Line-by-line calculator
No sign-up · No emailAn estimate built from real build prices, line by line. It is not an offer: the final figure is a fixed quote after the free site visit.
What this level includes
Rates based on real building quotes in Barcelona (17 projects, 604 line items analysed).
Request a fixed quote →| Item | Quantity | Unit price | Amount |
|---|---|---|---|
| Complete bathroom renovation | 1 project | 12.101 € | 12.101 € |
| Complete kitchen renovation | 1 project | 6.511 € | 6.511 € |
| Painting walls and ceilings | 208 m² | 27 € | 5.616 € |
| Skimming walls and ceilings | 208 m² | 18 € | 3.744 € |
| Aluminium window | 5 unit | 653 € | 3.265 € |
| Ceramic / porcelain flooring | 80 m² | 32 € | 2.560 € |
| Interior door | 5 unit | 295 € | 1.475 € |
| Lifting existing flooring | 80 m² | 17 € | 1.360 € |
| Skirting | 68 lm | 18 € | 1.224 € |
| Building work: render and levelling bases | 28 m² | 42 € | 1.176 € |
| Electrical point / accessory | 40 unit | 27 € | 1.080 € |
| Electrical upgrade, per room | 4 unit | 263 € | 1.052 € |
| Plasterboard partition / ceiling | 17,6 m² | 54 € | 950 € |
| Lighting point (LED downlight) | 20 unit | 32 € | 640 € |
| Plumbing alterations (per room) | 1 item | 479 € | 479 € |
| Builder's work for services | 1 item | 378 € | 378 € |
| Waste removal and disposal | 9,6 m³ | 33 € | 317 € |
| Access equipment and protection | 1 unit | 178 € | 178 € |
| Sum of items | 44.106 € | ||
Want a fuller picture? Generate an itemised proposal with your own details, or see the line-by-line cost of renovating a 50 m² flat.
Want a fuller picture? Generate an itemised proposal with your own details, or see the line-by-line cost of renovating a 50 m² flat.
What the number includes, what it cannot know, and where it comes from.
It is built from the line items in our own quotes rather than an industry average, so the range is realistic — but it is a range, not a price. It cannot see your building. The three things that move the real figure most are whether the wet rooms change position, what the existing services are made of, and whether anything structural needs attention. A free survey converts the range into a fixed number.
No. Every figure on this site is the base price with VAT excluded, and that is deliberate: the rate that applies to you is 10% or 21% depending on the age of the property, who is being invoiced and the materials share, and we cannot know which at the point you move a slider. Your written quote shows the rate as its own line. See the note under the estimator for the full rule.
Because gating an estimate behind an email address is a lead-capture trick, not a service. The number appears as soon as you enter the area. If you then want a real quote, ask for a survey — but that is your decision to make after you have the information, not before.
Appliances, loose furniture and decoration; structural work, which has to be calculated before it can be priced; anything belonging to the building rather than your flat, such as the façade or the roof; and remedial work for damp or degraded concrete, which can only be priced once seen. Council fees vary by municipality and are listed separately in a real quote.
That is the most useful thing to do with it. Put in the floor area from the listing and the specification you would want, and you have a defensible renovation figure to set against the asking price. Before you commit, though, have us look at it — a survey before exchange is free and has changed more than one client’s mind about a flat. Compare with what a full renovation involves.
From the itemised quotes we have actually issued, parsed into a price table of concepts and rates. The provenance line under the estimator says how many quotes are behind the figures currently loaded. We do not use published industry rates, and we do not inflate the ranges to make the survey look like a bargain.