Stains, black mould and that smell all have a cure, but only if you treat where the water is coming from. We find out which of the three kinds of damp you have — penetrating, rising or condensation — and fix the cause, not the mark on the wall.
Almost all wasted money on damp comes from one mistake: treating the symptom. Repainting a stain, sealing a wall, or fitting a dehumidifier will hide the problem for a season and change nothing. The question that decides everything is where is the water coming from, and there are only three answers.
Penetrating damp comes in from outside — a failed terrace membrane, a cracked façade, a blocked gutter, a leaking pipe. It shows up as a defined patch, often high on a wall or on a ceiling, and it gets worse after rain. The fix is to waterproof the point of entry, which may be on your property or may be the building’s responsibility.
Rising damp comes up out of the ground through the wall by capillary action. It is a ground-floor and basement problem, it stops at a more or less level line a metre or so up, and it brings salts with it that destroy plaster from behind. The fix is a barrier — chemical or physical — plus breathable lime-based mortars. Cement render makes it worse while hiding it.
Condensation is not a leak at all. It is moisture from inside the home — showers, cooking, drying washing, breathing — landing on the coldest surfaces in the flat: window reveals, external corners, behind wardrobes. It is one of the most common causes of black mould in Barcelona flats, and it is often misdiagnosed as a leak. The fix is ventilation and insulation, which is cheaper than almost anything else on this page. If the damp is coming from a terrace, see terrace renovation; from the façade, façade restoration.

The diagnosis is the job. Everything after it is ordinary building work, and getting it wrong means paying twice.
We measure moisture in the wall at different depths and heights, check the pattern and the season, look at what is on the other side, and where necessary use a thermal camera to find a cold bridge or a hidden pipe. Out of that comes a cause, not a guess.
Where the cause is a pipe, we locate it before opening anything — pressure testing, acoustic detection or thermal imaging — so we open one metre of wall rather than five.
Waterproofing the point of entry, installing a damp-proof barrier, repairing the leak, or improving ventilation and insulation. This is the part that actually matters.
Salt-contaminated plaster has to come off, because the salts stay active and will ruin whatever you put over them. We take it back far enough, which is usually further than people expect.
Lime-based mortars and plasters that let the wall keep releasing moisture, then mineral paint. Not cement, and not plastic paint, both of which trap it.
We come back and measure again once it has had time to dry. A damp job that has not been re-measured has not been finished.
We come and find the cause. Free, no obligation, anywhere in Catalonia — and if the cause turns out to be the building’s responsibility rather than yours, we tell you that.
An itemised quote for treating the actual source, with the remedial plasterwork priced separately so you can see what is cure and what is cosmetics.
Source first, damaged material out, breathable rebuild. One site manager, and we do not skip the drying time.
We measure the wall again after it has dried and hand over the warranty on the treatment.
We will not quote a treatment before we know the cause. A firm that sells you an injected barrier over the phone has not asked whether you have rising damp.
Most black mould in Barcelona flats is condensation, and the fix is ventilation and insulation — cheaper than everything else we sell. We say so anyway.
Lime mortars and mineral paints that let a wall dry out. Cement render and plastic paint hide damp for two years and then fail worse.
Pressure testing, acoustic detection and thermal imaging, so we open the wall where the leak is rather than exploring.
Where the water is coming from a communal riser, the roof or a neighbour, we document it so you can take it to the residents’ association instead of paying for it.
A follow-up moisture reading after drying. It is the only evidence that the treatment worked.
Indicative ranges by type of damp, VAT excluded. The diagnosis is free.
| Type of damp | What it covers | Indicative range (€) | |
|---|---|---|---|
| Condensation (ventilation) | Standard finishes, practical solution | 300 – 1,200 € | |
| Penetrating (waterproofing) | Selected materials, best balance | 400 – 2,500 € | |
| Rising (barrier) | Premium materials and high-end interior design | From 80 €/m |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Each with its own solution. The quote comes out of the diagnosis.
From a roof, terrace, façade or pipe. A defined patch that worsens after rain. We waterproof the point of entry.
Ground floors and basements, stopping at a level line about a metre up, with salt damage. Barrier plus breathable mortars.
Black mould in corners, on window reveals and behind furniture. Ventilation and insulation — the commonest cause and the cheapest fix.
Locating and repairing the leak that is causing the damp, before any plasterwork.
Two things frequently make the damp someone else’s bill rather than yours. If the water is coming through the façade, the roof or a communal riser, that is the building’s responsibility in most Catalan comunidades. If it is coming from a neighbour’s flat, it is theirs and their insurance’s. We document what we find with photographs and moisture readings so you have something to take to the administrator.
What a damp treatment covers, and what is quoted separately.
VAT (10% or 21% depending on your case) is shown as its own line. One practical note: if the damp came from a sudden event — a burst pipe, a failed washing machine hose — your home insurance usually covers it, and our written diagnosis with photographs and readings is exactly what the loss adjuster will ask for. Gradual damp is normally excluded, but it is worth checking your policy before paying yourself.
Damp often turns out to be a symptom of something else on this list.
Barcelona and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What people ask when they have a damp patch and no idea why.
Three quick tests. If the patch is defined, often high up, and gets worse a day or two after heavy rain, it is penetrating. If it runs along the bottom of a ground-floor wall and stops at a roughly level line about a metre up, with crumbling or salty plaster, it is rising. If it is black spotted mould in corners, on window reveals or behind a wardrobe on an external wall, worse in winter and better when you open the windows, it is condensation. We confirm with moisture readings at different depths rather than by eye, because the cheap answer and the expensive answer look similar on the surface.
Because paint is not a treatment. If the source is still there, the water keeps arriving and comes through whatever you put over it — faster, if you used a plastic or waterproof paint, because now the moisture is trapped behind a film and pushes the paint off. The other reason is salts: rising and penetrating damp leave hygroscopic salts in the plaster that pull moisture out of the air indefinitely, so the plaster has to come off, not be painted over.
Condensation is 300 to 1,200 € excluding VAT, and it is the most common problem. Penetrating damp is 400 to 2,500 € depending on where the water is getting in and how accessible that is. Rising damp is priced per metre of wall, from 80 €/m, plus the replastering. The survey and diagnosis are free, which matters because the diagnosis is the part that decides which of those three numbers applies to you.
It is a genuine health concern rather than only a cosmetic one — mould spores aggravate asthma, allergies and respiratory conditions, and children and older people are more affected. It is also a sign of a building problem rather than a cleaning problem, so treat the cause. Bleach removes the visible mould from a surface and does nothing about why it is there; it will be back within weeks on an uninsulated external wall.
For condensation, yes — that is a ventilation and insulation job, and the wall is usually fine once the surface stops being cold. For rising and penetrating damp, generally no, and this is where cheap quotes come from. The salts in contaminated plaster stay active and will ruin any new finish. We take the plaster back to sound material, which is usually 50 cm above the highest visible mark.
The building, in most cases. Under Catalan horizontal-property arrangements the façade, the roof and the communal risers are common elements, so damage originating there is a matter for the residents’ association, not for you. The same applies when water comes from a neighbour’s flat — that is their liability and typically their insurance. We give you photographs, moisture readings and a written diagnosis precisely so you can put it to the administrator rather than quietly paying.
Partly, and partly how it is used — and both parts have fixes. The building side is cold surfaces: uninsulated external walls, single glazing, concrete lintels acting as cold bridges. The use side is moisture generated faster than it is removed: long showers without extraction, drying washing indoors, no trickle ventilation in winter. We fix the first with insulation and mechanical extraction, and tell you plainly about the second, because a flat where nobody opens a window in January will mould again whatever we fit.
Usually yes for a sudden escape of water — a burst pipe, a failed appliance hose, an overflowing bath — and usually no for gradual damp, which most policies exclude. The dividing line matters, so it is worth reading your policy before you pay for anything. Either way our written diagnosis, photographs and moisture readings are the documentation a loss adjuster asks for, and we provide them whether or not you use us for the repair.
Longer than the work takes. A treated wall dries at roughly a centimetre of thickness per week in good conditions, so a 30 cm stone wall can take months to reach equilibrium. That is why we replaster with breathable lime rather than gypsum — it lets the wall carry on drying through the new finish — and why we come back and measure rather than declaring it finished on the last day on site.
Not necessarily, but find out what it is before you commit, because the three causes differ by an order of magnitude in cost. Condensation in a top-floor corner is a few hundred euros. Penetrating damp from a failed terrace above might be the building’s bill. Rising damp through a ground-floor wall in a building with no damp-proof course is a real and recurring liability. We will look at it for you before you sign — ask for a survey.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey, moisture readings and a written diagnosis anywhere in Catalonia. We quote the cause, not the stain.