A leak, a damp patch or falling masonry will not wait. We act quickly to contain the damage and then repair it properly, and we help you with the insurance claim so that it does not come out of your own pocket.
The first job in an emergency is not to fix it. It is to stop it getting worse: close the water off, prop the failing element, cover the open roof. The permanent repair comes after, once the damage has stopped growing and you know what you are dealing with. Rushing the permanent repair under pressure is how emergencies become expensive twice.
What happens in the first hour is yours to do, and it is simple. If it is water, turn off the stopcock if you can reach it, and switch off the electricity to the affected area if water is near it. Take photographs of the damage before anything is moved, because they are what the insurance claim rests on. Then call us.
Many household emergencies are covered by insurance — a sudden water escape, storm damage, a fire — either your own home policy or the building’s. We document the damage with photographs and a written report so that the claim can be made; the excess depends on your policy. For the repair that follows, see damp treatment, plumbing and roof repairs.

Containment is quick; the permanent repair is planned afterwards.
We assess by phone and organise a visit with priority.
Water isolated, leaks stopped or covered, elements propped, and the area made safe.
Photographs and a written report of the damage and its cause, for the insurer.
Once it is safe, we establish the cause properly.
A clear quote for the permanent repair.
The repair carried out, and the damaged finishes made good.
We check it, and re-measure moisture where relevant.
We assess by phone and give priority.
We stop the damage getting worse.
We record it for your insurer.
A clear quote for the permanent fix.
We stop the damage growing before we talk about the repair.
Photographs and a report that the claim can rest on.
We do not just patch the stain.
For the permanent repair, once the situation is safe.
Plumbing, building work and decoration under one site manager.
We distinguish what cannot wait from what can.
Indicative ranges, VAT excluded.
| Work | What it covers | Indicative range (€) | |
|---|---|---|---|
| Containment / spot repair | Standard finishes, practical solution | 150 – 800 € | |
| Average repair | Selected materials, best balance | 800 – 3,000 € | |
| Insured damage | Premium materials and high-end interior design | Depends on the claim |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Locating and repairing leaks and faults that cannot wait.
Containing and repairing water ingress from a roof, terrace or façade.
Propping and repairing elements at risk of falling.
Water, fire or storm damage, with documentation for the insurer.
If the problem is a gas smell, an electrical fire risk or a structural collapse risk, do not wait for us: leave the building and call the emergency services. We are builders, not an emergency service.
The scope of an emergency repair, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
An emergency repair usually leads into one of the trades on this list.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask in an emergency.
As quickly as we can: we assess by phone and organise the visit with priority. The first thing is always to contain the damage so that it does not get worse; the permanent repair is planned afterwards. If you can, turn off the water at the stopcock and take photographs while you wait.
Many household emergencies — leaks, water damage, storm and fire — are covered by your home insurance or the building’s. We document the damage with photographs and a report so that you can make the claim; the excess depends on your policy. Gradual damp is usually excluded, so check your policy.
Close the stopcock if you can and call us. We find the source, contain it and repair it. Damage to your neighbour is usually covered by the third-party liability section of your home insurance, and we document everything for the claim.
Roughly 150 to 800 € for containment or a spot repair and 800 to 3,000 € for an average repair, excluding VAT. Larger damage, such as that caused by fire or flood, is priced from the claim.
No. We are builders who respond quickly to urgent building problems. For a gas smell, an electrical fire risk or a structural collapse risk, leave the building and call the emergency services first.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →We assess by phone and give priority. Containment first, then the repair.