The entrance hall is the first impression of a building and what every resident sees every day. Renewing the finishes, lighting, letterboxes and access adds value to the building for a reasonable cost, and with minimal disruption.
An entrance hall — a portal — is judged by every resident and every visitor, and it shapes how a building is seen from the first step. It is also one of the best-value places to spend a community’s money: modest sums renew a hall completely, and the effect on how the building feels, and on the value of every flat, is out of proportion to the cost.
The work is mostly surfaces and light. New wall and floor finishes, a ceiling that hides the services, LED lighting with sensors, proper letterboxes and a modern entry-phone or video system. If the budget allows, it is also the moment to deal with accessibility: a ramp or level entrance, a lift connection and wide enough doors, which are often eligible for support.
Because it is common property, the decision is the owners’ meeting’s. We prepare a clear, itemised quote that the administrator can put to a vote, and we plan the work to keep access open for the residents throughout. For the stair above the hall, see staircases; for the rest of a building programme, works for residents’ associations.

One to four weeks, with access kept open for residents throughout.
We look at the hall, the services and the access, and set out options at different budgets for the meeting.
An itemised quote goes to the owners’ meeting, with grants identified where they apply.
Old finishes removed, services located and the surfaces prepared, with a protected route kept for residents.
New floor and wall finishes, chosen for heavy wear and easy cleaning.
A new ceiling and LED lighting with sensors.
New letterboxes and a modern entry-phone or video system.
Ramp or level threshold and a lift connection, where included, then handover.
We visit and report to the administrator. No cost and no obligation.
An itemised, comparable quote with the options priced side by side.
One person runs the job and keeps residents informed.
Warranty and a transparent final account.
A renewed hall changes how the whole building feels, for a modest sum.
We plan so residents can always get in and out.
Floors and walls specified for heavy wear and cleaning, not for the showroom.
We design in the ramp, the threshold and the lift connection, which are often supported by grants.
Itemised and comparable, with options side by side.
Every trade coordinated by one person.
Indicative ranges, VAT excluded.
| Scope | What it covers | Indicative range (€) | |
|---|---|---|---|
| Facelift | Standard finishes, practical solution | 6,000 – 15,000 € | |
| Complete renovation | Selected materials, best balance | 15,000 – 35,000 € | |
| With accessibility | Premium materials and high-end interior design | From 25,000 € |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
New finishes, LED lighting, paint and letterboxes. High impact, controlled cost.
Floor, walls, ceiling, door, entry system and letterboxes.
As above, plus removing barriers and preparing access to the lift.
A quick upgrade of the lighting (LED with sensors) and letterboxes.
Accessibility improvements are often eligible for grants, and a lift connection or a ramp can be the part of the job that makes the rest affordable. We tell you what is open when you ask. See works for residents’ associations.
The scope of an entrance renovation, and what is separate.
VAT can be at the reduced rate on rehabilitation works in a residential building, and we confirm which applies in the quote.
An entrance connects finishes, lighting, access and the stair.
Building entrances in Barcelona and across Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What administrators and owners ask.
Roughly 6,000 to 15,000 € for a facelift, 15,000 to 35,000 € for a complete renovation and from 25,000 € if accessibility is improved, excluding VAT. The size of the hall and the materials move it most. A lighting and letterbox upgrade on its own can start around 3,000 €.
Sometimes, particularly where the work includes accessibility such as a ramp or a lift connection. Schemes change and are applied for by the community. We check what is open when you ask and prepare the documents, but we will not budget on a grant that is not available.
Often. A ramp, a level threshold, wider doors and a connection to the lift remove the barriers that stop wheelchair users and parents with prams. The feasibility depends on the levels and the geometry, and we assess it at the survey.
Briefly. We keep a safe route open throughout, work in agreed hours, and give residents written notice of what is happening and when. The noisiest tasks are short.
One to four weeks depending on the scope.
By stage certification against a written programme, agreed with the administrator. Owners usually pay their share on a schedule set at the meeting.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. A quote the owners’ meeting can vote on.