Say goodbye to textured plaster and rough walls. We leave them perfectly smooth, ready for a flawless finish. It is the change that modernises an older home most, and it needs no major building work.
A great many Spanish flats of the 1970s to 1990s have gotelé — a rough, stippled plaster finish on walls and ceilings. It was cheap and hid imperfections, and it now dates a home instantly. Removing it and leaving smooth walls is the single change that modernises an older flat most for the money.
The job is a trade skill, and the result is in the sanding. The textured finish is either scraped off or covered with a skim coat of fine plaster, then sanded flat. Done well, the walls are smooth enough to take a dark matt paint without showing a flaw; done badly, every ridge shows under raking light.
The honest drawback is dust: sanding is dusty, and we contain it with sheeting and extraction, but you will not want to be living there. Painting follows naturally, so most people have the two done together: see painting and decorating. If the walls are damp, treat that first: damp treatment.

A room in a day or two; a whole flat in one to two weeks.
We check the walls for damp, cracks and loose plaster, and agree what is to be smoothed.
Floors, doors, windows and furniture sheeted off.
The stippled finish is scraped off or covered, depending on the state of the wall.
A thin coat of fine plaster applied to give a flat, even surface.
Sanded smooth with dust extraction, which is what makes or breaks the result.
A primer so that the paint takes evenly.
The rooms cleaned and left ready for paint.
We look at the walls. No cost and no obligation.
A price per square metre or per room.
Done in a planned order with dust contained.
Left primed and ready for paint, or painted if you want.
The finish is in the sanding, and we spend the time.
Sheeting and extraction, because you still have to live there afterwards.
We will not skim over a wet wall.
Ceilings are usually what dates a home most.
We can leave it primed or fully painted.
Per square metre or per room.
Per square metre, VAT excluded.
| Work | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Skim (good condition) | Standard finishes, practical solution | 10 – 18 €/m² | |
| Remove texture and skim | Selected materials, best balance | 14 – 25 €/m² | |
| Skim and paint | Premium materials and high-end interior design | 18 – 32 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Indicative ranges, VAT excluded.
Smoothing one room, ready to paint.
Smoothing the whole flat, walls and ceilings. A radical change.
Smoothing ceilings, which usually date a home most.
Smooth and painted, in one visit.
In an older building we treat the age of the coating as a precaution: some textured coatings in older buildings have been found to contain asbestos, so where the age makes it possible we test before sanding, and we do not sand anything we have not checked.
The scope of a skimming job, and what is separate.
VAT is shown as its own line — 10% or 21% depending on your case.
Skimming leads naturally into painting and other finishes.
Across Barcelona and Catalonia. Find your town.
Official boundary data for comarques and municipalities (ICGC, 2025).
What owners ask about skimming.
Either scraped off, after dampening it, or covered with a skim coat of fine plaster, depending on how well it is stuck. Then the wall is sanded flat and primed. Scraping gives the flattest result but depends on what is underneath; skimming over is more forgiving. We choose after testing a patch.
Yes, sanding creates dust. We contain it with sheeting over doors and furniture and use extraction, so it stays in the room being worked on. You will still not want to live there that day, and we plan around that.
If the walls are rough, yes. Paint over texture leaves the texture, and in raking light it shows. Smooth walls make the whole flat look modern and take paint better, and the difference is large compared with the cost.
Roughly 2,000 to 5,000 € for an average 70 to 90 m² flat, walls and ceilings, excluding VAT, depending on the condition. Per square metre it is about 10 to 25 €.
Yes. Most people have it done in one visit, which saves time and gives a better finish. Skim and paint together is about 18 to 32 €/m².
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia. A fixed price, with dust contained.