Finishes · Catalonia

Flooring in Catalonia

Changing the floor transforms a whole home and often needs no building work and only a few days. We advise on which material suits your use, your budget and the floor you start with.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Flooring

The surface everything else stands on.

The floor is the largest surface in a home and the one that sets its character. A continuous, consistent floor makes a flat look larger and calmer; a patchwork of different finishes does the opposite. And it is one of the few renovations that can be done without demolition, laid over the existing floor, in a few days.

The materials fall into four families. Laminate and vinyl are the economical and quick options, and modern vinyl is waterproof. Porcelain is the durable all-rounder, hard and easy to clean, and can imitate timber convincingly. Timber — engineered, parquet or solid — is the warmest and can be sanded and refinished. And microcement gives a seamless continuous floor: see microcement.

Whichever you choose, the base decides how it performs. A floor laid on an uneven or damp slab will creak, crack or lift, and levelling or damp treatment beforehand is part of the honest price. Laying over the existing floor saves money and time, but adds height, which matters at doors and thresholds. For fitted timber, see joinery and carpentry.

Floor under construction with cream tiles laid with spacers and small brown pieces at the corners, beside a skirting board
How it runs

Laying a floor, step by step.

A day or two for a room; three to seven days for a whole flat.

01

Survey

We check the existing floor, the levels, the damp and the thresholds, and agree the material.

02

Removal or overlay

The old floor is lifted, or the new one laid over it if it is sound.

03

Base preparation

The base levelled and, if needed, damp-proofed.

04

Underlay

An underlay for acoustic and thermal performance, and to protect a floating floor.

05

Laying

The floor laid with expansion gaps where needed, and the pattern set out so cuts are balanced.

06

Skirting and thresholds

Skirting fitted and transitions at doors detailed.

07

Handover

Cleaned and explained, with care instructions.

How we work

How we run a flooring job.

01

Free survey

We check the base and show samples. No cost and no obligation.

02

Fixed quote

A price per square metre, with base preparation itemised.

03

Laying

Quick and clean, room by room if you are living there.

04

Handover

Warranty and a care guide.

Why us

Why use us for flooring.

The base checked first

Because it decides whether the floor lasts.

Honest advice on materials

We recommend according to your use, not the margin.

Without demolition where possible

Laid over a sound floor to save time and money.

Thresholds detailed

The height and the junctions at doors handled properly.

A continuous floor

We lay out so cuts are balanced and joins are discreet.

Fixed price

With base preparation itemised.

Prices

What flooring costs.

Per square metre, supplied and laid, VAT excluded.

What flooring costs — Indicative prices · VAT not included
MaterialWhat it coversPer m² (excl. VAT)
Laminate / vinylStandard finishes, practical solution25 – 50 €/m²
Timber / microcementPremium materials and high-end interior design70 – 140 €/m²
Indicative prices · VAT not included. Laying over the existing floor makes the job cheaper and quicker. If the old floor has to be taken up and the base levelled, add roughly 10 to 25 €/m² depending on the condition. We itemise the material, the base preparation and the laying.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate2,000 – 4,000 €Laminate / vinyl · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by size of job.

Indicative ranges, VAT excluded.

One roomUp to 20 m²600 – 2,500 €

A living room or a couple of bedrooms. Good for renewing room by room.

Half a home20 – 50 m²1,500 – 5,500 €

A full day zone or night zone. The change is very noticeable.

Whole home50 – 100 m²3,500 – 11,000 €

The whole home in one continuous floor, which adds a sense of space.

Without demolitionOver the existing floorFrom 25 €/m²

A quick change laid over the existing floor, with no rubble.

Laying over an existing floor raises the level by a few millimetres to a couple of centimetres, which affects doors, thresholds and appliances. We measure it at the survey. Underfloor heating also changes what you can lay, because some materials insulate.

No small print

What is included and what is not.

The scope of a flooring job, and what is separate.

✓ Included in the price

  • Survey and base check
  • Underlay
  • Laying of the chosen floor
  • Skirting and thresholds
  • Cleaning
  • A care guide
  • A written warranty

✕ Not included — quoted separately

  • Removal of the old floor, unless itemised
  • Levelling or damp treatment of the base, unless itemised
  • Underfloor heating, unless itemised
  • Moving furniture out of the rooms
  • Council taxes and fees
  • Works needing the owners’ association’s consent

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we lay floors.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about flooring.

Can a new floor go over the existing one?

Often, yes, if the old floor is sound, flat and well stuck. It saves demolition, rubble and days of work, and costs from about 25 €/m². The price is height: the new floor raises the level, which affects doors and thresholds. If the old floor is loose or damaged, it has to come up first.

Which floor is best for my home?

It depends on the use. Porcelain is the durable all-rounder for kitchens, bathrooms and high-traffic areas. Timber is warmer and can be refinished but marks more easily. Vinyl is economical, quiet and waterproof. Laminate is cheap and quick but sensitive to water. We recommend by room and by how you live.

How much does it cost to change the floor of a flat?

Roughly 3,500 to 11,000 € for 50 to 100 m², excluding VAT, depending on the material and the base. Laminate or vinyl is at the low end, timber or microcement at the high.

How long does it take?

A day or two for a room; three to seven days for a whole flat. Timber and microcement need extra drying time for the base and the finish.

Do I have to empty the house?

We lay room by room, so you can usually stay, but furniture has to be moved out of the room being done. Clearing the rooms makes it faster and cheaper.

Free quote

Get a quote for flooring.

Free survey, base check and samples anywhere in Catalonia.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →