Security and metalwork · Catalonia

Locksmith and metalwork in Barcelona and Catalonia

Security doors, grilles, locks and made-to-measure metal structures. From securing your home to a steel staircase or balustrade, with workmanship that lasts.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Locksmith and metalwork

Security first, then the made-to-measure steelwork.

Two quite different trades share this page. The first is security: locks, cylinders, security doors and grilles, the things that decide whether a home is easy or hard to enter. The second is fabrication: staircases, balustrades, pergola frames and other structures in steel or iron, made in a workshop and fitted on site.

On the security side, the most effective upgrade is usually the cheapest. A high-security cylinder in an existing door costs little and resists the methods most burglars use. A security door is a bigger purchase, and its quality is not in the price: it is in the frame, the multiple locking points and the anchoring to the wall. A strong door in a weak frame protects nothing.

On the fabrication side, steel is strong, slim and can be made to any shape, which is why it is used for staircases and balustrades. Safety rules set the height and strength of a balustrade, and we build to them. For glazed balustrades and screens see aluminium joinery; for staircase design, staircase renovation.

Work-in-progress entrance hall with the front door, a thick timber-finished door open to the building’s lobby, and a light wood base unit with a top; on the right, an interior window with a grey frame
How it runs

A security or metalwork job, step by step.

A visit for a lock; two to five weeks for a made-to-measure structure.

01

Survey

We look at the door, the frame and the wall, or measure the space for a structure.

02

Specification

Security rating and lock type, or the design and finish of a structure.

03

Manufacture

Doors and structures made in the workshop to measure.

04

Fitting

Doors anchored to the wall; structures fixed to a sound base.

05

Finishing

Painting or galvanising, so the steel does not corrode.

06

Handover

Keys, instructions and warranty.

How we work

How we run a locksmith or metalwork job.

01

Survey

We look at what you have. Free for larger jobs.

02

Fixed quote

A fixed price.

03

Making and fitting

Made to measure and fitted by an experienced team.

04

Handover and warranty

Warranty on the work.

Why us

Why use us for security and metalwork.

Honest security advice

We tell you when a better cylinder is enough and when a door is worth it.

Frame and anchoring

A security door is only as strong as its frame and its fixings.

Made to measure

Staircases, balustrades and structures built to your space.

Built to the safety rules

Balustrade height and strength to regulation.

Finished to last

Painted or galvanised against corrosion.

Warranty

On the work.

Prices

What locksmith and metalwork cost.

Indicative ranges, VAT excluded.

What locksmith and metalwork cost — Indicative prices · VAT not included
WorkWhat it coversIndicative range
Changing a lockStandard finishes, practical solution80 – 300 €
Metal structurePremium materials and high-end interior designDepends on project
Indicative prices · VAT not included. Metalwork ranges from changing a lock (from about 80 €) or a security door (from about 600 €) to a bespoke steel structure — a staircase, a balustrade, a pergola — priced as a project. Everything is itemised.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Full renovation · functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

By work

What it costs by type of work.

Indicative ranges, VAT excluded.

Locks and entrySecurity80 – 400 €

High-security cylinders, locks and lock-outs.

Security doorsReinforced600 – 2,000 €

Security doors for homes and premises.

Grilles and shuttersProtectionFrom 150 €/m²

Grilles, metal shutters, bollards and protection.

Steel structuresMade to measureDepends on project

Staircases, balustrades, pergolas and structures in iron or steel.

A security door in an old frame is a false economy. The cheapest route to real security is often a better cylinder and a reinforced strike plate, and we tell you honestly whether a door is worth the money.

No small print

What is included and what is not.

The scope of a locksmith or metalwork job, and what is separate.

✓ Included in the price

  • Survey and security assessment
  • Locks, cylinders and security doors
  • Made-to-measure steelwork
  • Fitting and anchoring
  • Painting or galvanising
  • Keys and instructions
  • A written warranty

✕ Not included — quoted separately

  • Alarm systems and cameras, unless itemised
  • Repairs to the wall or frame around a door
  • Council taxes and fees
  • Works needing the owners’ association’s consent
  • Glazing, unless itemised
  • Emergency out-of-hours call-outs

VAT is shown as its own line — 10% or 21% depending on your case.

Where we work

Where we do locksmith and metalwork.

Across Barcelona and Catalonia. Find your town.

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

What owners ask about security and metalwork.

Do you fit security doors?

Yes. The quality of a security door is in its frame, its locking points and how it is anchored to the wall, not its price, so we assess the frame and the wall first. We supply and fit security doors for homes and commercial premises.

Do you make steel staircases and balustrades?

Yes, made to measure and fitted on site. Balustrades have a legal minimum height and strength, which we build to. See staircase renovation.

Can you change a lock or open a door?

Yes, including high-security cylinders, which are one of the most cost-effective security upgrades. For emergency opening we tell you plainly what we can do and when.

How much does locksmith work cost?

Roughly 80 to 300 € to change a lock and 600 to 2,000 € for a security door, excluding VAT. Metal structures are priced as projects.

Do you work for residents’ associations?

Yes — entrance doors, railings, gates and communal metalwork. See works for residents’ associations.

Free quote

Get a quote for security or metalwork.

Free survey for larger jobs anywhere in Catalonia.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →