Renovations · Cerdanyola del Vallès

Full home renovations in Cerdanyola del Vallès: blocks, villas and residential houses

We renovate in the Centre, Serraparera and the villas of Bellaterra, beside the UAB. From the urban flat to the house with a garden. A fixed written quote and one site manager from start to finish.

Since 2010Free technical visitItemised quoteWarranty on the work

Fixed written quote
Cerdanyola del Vallès
Cerdanyola del Vallès
Fixeda written, itemised quote
1 site managera single point of contact for the whole renovation
Freetechnical visit in Cerdanyola del Vallès
Warrantyon the work
Renovations in Cerdanyola del Vallès

Renovating in Cerdanyola,
with no surprises.

Cerdanyola del Vallès, a university city (UAB) and well connected, combines a Centre and neighbourhoods of blocks with the residential area of Bellaterra, with houses and villas among the woods. The urban flat calls for renewed services; the residential house, interior design and outdoor space. We know that housing stock, with a fixed quote and a single site manager.

  • Fixed quote before we start
  • A dedicated site manager on your renovation
  • Completion date in writing
  • Full handling of licences and permits
Renovated kitchen with tall wooden cabinets, white worktop and under-cabinet light, in the house on Carrer de Sant Ramon, Cerdanyola del Vallès
By type of building

Every building in Cerdanyola calls for a different renovation.

Every type of home asks for a different renovation. We fit the job to what your building really needs, not to a generic script.

01

Blocks and flats in the old centre

Centre, Serraparera, Fontetes: services to renew and a layout to optimise.

02

Villas and houses in Bellaterra

Houses among the woods: full renovation with interior design, insulation, climate control and outdoor space.

03

Houses between party walls

The old core with homes of old structure to restore.

04

Flats to let (university area)

A quick, durable, profitable renovation, with the certificates up to date.

A real job in Cerdanyola

A house with views on Carrer de Sant Ramon: 140 m² brought up to date in 12 weeks

The house had what cannot be bought — the orientation and the views of the hills — and the renovation was devoted to living up to them inside. The main bathroom is now the room with the best view: a freestanding bath by the window, a double basin on wood and black taps. The kitchen was redone in white with tall wooden units and under-cabinet light, and it already works every day.

Each room was given its real use: a study in greyish blue, the child’s bedroom, air-conditioning split units where needed. Twelve weeks of work and a range of 50,000–54,000 € (indicative · base excluding VAT) for 140 m².

  • 140 m² · 12 weeks of work
  • Main bathroom with a freestanding bath and double basin
  • New white-and-wood kitchen with under-cabinet light
  • Study, child’s bedroom and climate control with split units
See the full project page →
Double basin on a wooden worktop with a framed mirror in a renovated house in Cerdanyola del Vallès
White worktop with the induction hob, renovated kitchen in use
The kitchen, redone in white and wood, already in use.
Study with a greyish-blue wall and a wooden desk
The study, in greyish blue, with a wooden desk.
Finished room with an air-conditioning split and a laminate floor
A finished room with a split unit and a laminate floor.
Houses on the Collserola slopes

Montflorit, Sant Ramon and Bellaterra: renovating a house for its views

A good part of Cerdanyola’s houses stand on hillsides — Montflorit, the Sant Ramon area, Bellaterra — looking to the Collserola hills or the valley. There the renovation is decided by the orientation: larger windows with a thermal break where the views are, the kitchen or main bathroom moved to the façade that looks best, galleries and terraces recovered as living space.

What you cannot see matters just as much: insulating the exposed façade from inside, replacing services that in houses of the ’60s–’80s are often the originals, and settling the climate control — split units or aerothermal — before closing ceilings and walls. And as many plots slope and have narrow access, we plan with the site manager where the skip goes and how material comes in.

  • Windows with a thermal break oriented to the views
  • Interior insulation and climate control settled before closing up
  • Site access and skip planned on sloping plots
Red gallery with plants and views to the valley in a house in Cerdanyola
Serraparera, Fontetes and Banús

Flats of the ’60s–’70s in the block neighbourhoods

Serraparera, Fontetes, Banús or Canaletes grew with blocks of the ’60s and ’70s: flats of 65 to 90 m² with an enclosed gallery, services of the period and consumer units with no earth. The typical renovation here renews plumbing, electrics and drains, opens the kitchen or takes in the gallery, and swaps the bath for a shower; with the community we agree hours and protect the staircase and the lift.

With the UAB a step away, many of these homes are renovated to let: durable, low-maintenance finishes, services certified with their certificate, and the habitability certificate and the energy certificate up to date so the contract can be signed without delay.

  • New services with certificates and earthing
  • Gallery taken in and an open kitchen to gain metres
  • Habitability and energy certificates ready for letting
Fridge with magnets in the renovated kitchen, the house already lived in
Cerdanyola Ajuntament

Works permits in Cerdanyola del Vallès: flat, house and Collserola

For an interior renovation that does not touch the structure, a prior works notification at Cerdanyola’s Ajuntament is enough: documents, fee and off you go. In a house, if a façade is opened, the roof replaced, an extension built or the structure touched, you need a licence with a technical project and site supervision, and it is wise to allow weeks for processing; we prepare it with our registered technicians.

Two local particulars: on streets in the Centre and in estates with a narrow road the skip needs a permit to occupy the public highway, which we handle; and if the plot falls within the Parc de Collserola area, the procedure may call for an additional report from the park, so we check before quoting.

  • Prior notification for interior renovations
  • Licence with a project for façade, roof or structure
  • Public-highway occupation and the Collserola area checked
New kitchen with tall wooden units and LED light under the cabinets in Cerdanyola
How we work

How we work with you.

01

A survey wherever you are

We come to your home, measure up and check the real state of the services and the structure. Free and with no obligation.

02

Design and a fixed quote

A fixed quote, broken down item by item and in writing, with the finishes defined. No “from” prices that balloon later.

03

Council paperwork

We prepare the works notification or licence and, where needed, coordinate with the community and the building administrator.

04

Works under a site manager, with a warranty

One site manager coordinates the trades and sends you regular photos and video. Handover with the certificates, the habitability certificate and the warranty.

Prices

What it costs to renovate in Cerdanyola del Vallès.

Indicative ranges in Cerdanyola del Vallès, based on real quotes. The final price is always a fixed quote after the visit.

An 80 m² flat41,300 – 52,100 €3 bedrooms, a bathroom, a WC and a kitchen · 520–650 €/m² · VAT not included
A 120 m² house70,100 – 88,600 €4 bedrooms, 2 bathrooms and a kitchen · 580–740 €/m² · VAT not included
What it costs to renovate in Cerdanyola del Vallès — Indicative prices · VAT not included
Quality levelWhat it coversPrice per m²
Basic / functionalStandard finishes, layout unchanged520 – 650 €/m²
High-end / luxuryPremium materials and exclusive interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. Not a binding offer: the definitive quote, fixed and broken down item by item, is always given after the free technical visit.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Basic / functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

What changes the price of a renovation in Cerdanyola del Vallès

Two homes of the same size can cost very different amounts. Beyond the €/m², these are the factors that move the price most:

Condition of the services

Old plumbing, wiring and drains usually have to be renewed completely; if they are in good condition, a large part of the work is saved.

Age of the building

In older buildings and houses there are surprises — timber floors, damp, obsolete services or even asbestos — that have to be dealt with.

Changes to the layout

Taking down partitions, moving the kitchen or bathroom or opening up spaces means plumbing, electrics and sometimes structure, and pushes the budget up.

Quality of the materials

The same home can cost half or double depending on the finishes: standard stoneware against large-format porcelain, joinery, sanitaryware and kitchen.

Permits needed

A works notification is cheap; a major works licence needs a project, technical supervision and fees that add to the budget.

Access to the site

Houses with no lift, old town centres with narrow streets, isolated masías or upper floors make carrying, unloading materials and removing rubble dearer.

Councils and regulations

Licences and paperwork, sorted.

Every job has its own procedure: minor works notification, major licence, building inspection, habitability certificate… We deal with it all with the relevant council.

Works notification (minor works)

For renovations that touch neither the structure nor the layout. It is filed with the council and lets you start almost at once. We handle it for you.

Major works licence

If the structure, the façade or the layout is significantly affected. It needs a technical project and site supervision; in listed buildings, a heritage review.

Building inspection (ITE)

The technical inspection is compulsory once a building reaches a certain age. If yours is pending or has deficiencies, we help with the inspection and the repair work.

Habitability and energy certificates

Needed to sell or let. We handle the habitability certificate and the energy-efficiency certificate, before and after the renovation.

Reduced 10% VAT

On homes completed at least two years before the works start, as long as the materials supplied do not exceed 40% of the taxable base. We show it clearly in the quote.

Owners’ community

When common elements — downpipes, façade, courtyards, roof — are touched, we coordinate with the community and its administrator.

What we renovate

Everything we renovate in Cerdanyola del Vallès.

From the full renovation to a single trade. These are our most requested services.

See all services →
Pages for this city

Services with a page of their own in Cerdanyola del Vallès.

How we handle each of these services in Cerdanyola del Vallès, with prices and examples from the area.

Where we work

Cerdanyola neighbourhoods where we renovate.

We work across the whole area, with crews who know each type of home in Cerdanyola del Vallès.

We renovate mainly in:

Centre and Serraparera

Consolidated fabric with buildings and blocks where we renew services and efficiency.

Bellaterra

Houses and villas among the woods: full renovation with outdoor space and climate control.

See renovations in Bellaterra →

Fontetes and Banús

Residential housing with a full renovation and optimising of the space.

Les Fontetes and Guiera

Residential flats and houses with a renovation from start to finish.

And also in:

CentreSerrapareraFontetesBellaterraBanúsGuieraMontfloritLes Fontetes

Neighbourhoods of Cerdanyola with a page of their own:

Service areaRest of Catalonia

Official boundary data for comarques and municipalities (ICGC, 2025).

Common questions

Frequently asked questions

Everything you need to know about renovating in Cerdanyola del Vallès: prices, licences, timescales and grants.

How much does it cost to hire a renovation company in Cerdanyola del Vallès?

As a guide, a full renovation runs between 520 and 1,340 €/m²: 520–650 €/m² at functional standard, 750–940 €/m² at mid-range and 1,060–1,340 €/m² at high-end, VAT extra. These figures come from our own quotes, not market estimates. A flat of 80–100 m² usually lands between 32,000 and 62,000 €; a house in Bellaterra goes higher. We give you a fixed, itemised quote after the free technical visit, with no “from” prices.

How much does it cost to renovate a bathroom or a kitchen in Cerdanyola del Vallès?

As a reference, a complete bathroom usually runs from 9,500 to 19,800 € and a kitchen with units and appliances from 4,800 to 19,500 €, depending on floor area, finishes and the state of the services. The final price is fixed and in writing once we have seen the home.

What does your fixed quote include?

Everything, item by item: the labour of every trade, materials, waste management, protection of communal areas, the site manager’s coordination and the final clean. If your renovation needs a project or a licence, we itemise that too. What you sign is what you pay.

How do you avoid cost overruns?

With a detailed technical visit and a quote fixed item by item before starting, so no surprise “extras” appear. If you decide on a change during the works, we give you its cost in writing and it is only carried out when you approve it.

How long does a full renovation take?

A full renovation of an average home (70–100 m²) usually lasts between 10 and 16 weeks. Made-to-measure furniture and major works licences can add weeks. We give you a written programme before starting and keep you updated on how the work is going.

Do you work with architects and handle the licences?

Yes. We have registered architects and technical architects for the project and the site supervision when it is needed, and we file the works notification or licence with the relevant council, as well as the habitability certificate and the energy certificate.

Do you offer a warranty?

Yes. We give a written warranty on the work, and we stand behind what we do after we have finished too.

Are there grants or subsidies for renovating in Cerdanyola del Vallès?

Yes. If the renovation improves energy efficiency (windows, insulation, aerothermal heating) it can qualify for Next Generation funds managed in Catalonia by ICAEN and for income-tax deductions. The Generalitat and the county council also publish calls for renovation. We help with the paperwork.

Do you renovate houses in Bellaterra?

Yes. The houses of Bellaterra, among the woods, call for good insulation, efficient climate control and care of the outdoor space. We carry out full renovations with interior design and every trade under a single site manager.

How much does it cost to renovate a 140 m² house in Cerdanyola?

The job on Carrer de Sant Ramon — 140 m², main bathroom, kitchen, study, child’s bedroom and services — came to between 50,000 and 54,000 € base excluding VAT and took twelve weeks. It is a real reference, not a “from” price: yours depends on the scope, and we give it to you fixed item by item after the free visit.

Do you install air conditioning or aerothermal heating as part of the renovation?

Yes, and it is best decided at the start: in the Sant Ramon house the split units were fitted with the works open, with the lines and drains hidden before the ceilings were closed. In houses with a garden we study aerothermal; in flats, splits or ducting depending on the false ceiling available.

Do you renovate flats to let near the UAB?

Yes. In Serraparera, Fontetes or the Centre we carry out renovations designed for letting: hard-wearing finishes, services with their certificate, and the habitability certificate and the energy certificate processed so you can sign as soon as the work is finished.

Do you renovate old and village houses in Cerdanyola and Bellaterra?

Yes: restoring old houses in Cerdanyola — and restoring old houses in Bellaterra — alongside the full renovation of a flat in Cerdanyola. Renovating a village house here usually involves structure and insulation; what a full renovation of an old house costs per m² is set out in the price section above, excluding VAT. Every home renovation in Cerdanyola comes with a quote fixed item by item.

However it is searched for, is it the same service?

Yes: “price per m² of a full renovation of an old house in Cerdanyola”, “full flat renovation in Cerdanyola”, “renovate a village house in Cerdanyola”, “home renovations in Cerdanyola” and “restoring old houses in Cerdanyola” are different ways of writing the same need, and all of them get the same quote fixed item by item. The same goes for “full renovation in Cerdanyola”, “restoring buildings in Cerdanyola”, “full-renovation quote in Cerdanyola” and “renovation project in Cerdanyola”.

Free quote

Ask for your quote, no strings attached.

A free technical visit in Cerdanyola del Vallès and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →