Completed

Renovation of a house with views in Cerdanyola del Vallès

Carrer de Sant Ramon, Cerdanyola del Vallès · 140 m² · 2026

The double basin on a wooden worktop with the framed mirror

Project details

Floor area
140 m²
Property type
House
Duration
12 weeks
Year
2026
Status
Completed
Budget
50,000–54,000 €
What we did
Main bathroom with a freestanding bath and double basin · Marble-effect tiling and a wood-effect floor in the bathroom · New kitchen with LED lighting under the wall units · Laminate flooring in the bedrooms and study · Black aluminium windows and doors · Colour paint in the study, living room and gallery · Air-conditioning split units

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A house with the best views on the street, brought up to date inside: a main bathroom with a freestanding bath, a white-and-wood kitchen, a study and a child’s room — and already lived in.

The house had what cannot be bought — the orientation and the views of the hills — and the renovation was devoted to living up to them inside.

The main bathroom is now the room with the best view in the house: a freestanding bath by the window, a double basin on wood and black taps. The kitchen was redone in white with tall wooden units and under-cabinet light, and it already works every day — the fridge magnets belong to the family, not the photographer.

Each room was given its real use: a study in greyish blue, the bedroom with the cot beside the bed, air-conditioning split units where needed. The red gallery with its plants stayed the place where the house looks out to the valley. A house renovation in Cerdanyola meant to last for many years.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.

✆ Call✦ WhatsAppGet a quote →