Renovations · Cerdanyola del Vallès

Kitchen renovations in Cerdanyola del Vallès

Kitchen renovation in Cerdanyola del Vallès: block flats of the 60s–70s and rentals near the UAB, old-core houses and Bellaterra villas. Gas to induction with the certificate and a quote item by item.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Kitchen renovation

A kitchen that stands up to use, not just to the photo.

With the UAB next door, a good share of the kitchens in Cerdanyola work harder than average: rental flats where the tenants change every year, and kitchens used daily without anyone looking after them as their own. That decides the materials before the design does. A quartz or porcelain worktop that does not mark with a hot pan, smooth fronts that wipe clean in one pass, good hinges and runners, and a floor that does not hold on to grease. The pretty and fragile is dropped early; in a flat with turnover it gets expensive.

In Serraparera, Fontetes, Banús or Canaletes the blocks of the sixties and seventies rule: flats of 65 to 90 m² with a small, closed kitchen and an enclosed gallery alongside. What changes the flat most is opening the kitchen to the dining room or taking in the gallery, provided the wall allows it; if it is load-bearing, it is opened with a calculated lintel and a project. In the Centre, in the party-wall houses of the old core, the kitchen tends to sit at the back and the move is similar: open it up and let the light in from behind.

Here, the switch from gas to induction is almost always decided. Many of these blocks still run on gas and have consumer units with no earth, so moving to an induction hob means checking the contracted power, running a circuit of its own and legalising it with its electrical certificate; we handle the gas disconnection. With no flame or visible pipe, the kitchen is cleaner and, for letting, easier to insure. With the kitchen open, it is also the moment to renew plumbing and drains.

Timescales matter if the flat is let or you are going to let it. A complete kitchen takes two to four weeks depending on what is touched, and we fix it with you in writing so the flat is back on the market between one contract and the next. For an interior renovation that does not touch the structure, prior works notification at the Ajuntament is enough; if a load-bearing partition comes down, we go with a technical project. With the community we agree hours and protect the staircase and the lift.

Kitchen with light wood units, sink beside a window and the lower fronts still covered with protective film
Prices

What a kitchen renovation costs.

Indicative ranges by specification and appliances, VAT excluded. The final figure comes from the survey.

What a kitchen renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversIndicative range (€)
FunctionalStandard finishes, practical solution4,800 – 7,500 €
Design / high endPremium materials and high-end interior design13,300 – 19,500 €
Indicative prices · VAT not included. The kitchen is the room where the range is widest, because appliances, the worktop and the units can multiply the cost on an identical layout. Opening the kitchen into the living room typically adds 1,500 to 4,000 € depending on the wall and whether it carries load. We itemise all of it so you can choose where the money goes.
Calculator

What might your new kitchen cost?

Indicative estimate4,800 – 7,500 €Functional · Medium (8–12 m²)
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by kitchen size.

Indicative ranges for a full kitchen renovation, VAT excluded.

Small kitchenUp to 8 m²4,800 – 17,400 €

The galley kitchen of a city flat. Made-to-measure storage is what makes these work, and it is where the budget should go.

Medium kitchen8 – 14 m²5,000 – 18,600 €

The most common size. Enough room for a breakfast bar or a peninsula and a proper run of worktop.

Large kitchenOver 14 m²5,900 – 19,500 €

Island and dining space. At this size the design and the appliances set the price, not the square metres.

Opened into the living roomOpen-planFrom 15,000 €

The single change that transforms a flat most. Add the partition and structural item on top of the kitchen itself.

In a kitchen the floor area matters less than the material grades, the worktop and the appliances. That is why we price a specific design rather than a rate per square metre — and why the quote names what is in it.

No small print

What is included and what is not.

The scope of a turnkey kitchen renovation, and what normally sits outside it.

✓ Included in the price

  • Strip-out, clearance and removal of the old kitchen
  • New water supply, waste runs and extraction duct
  • Dedicated appliance circuits with electrical certificate
  • Splashback tiling or cladding, and the floor
  • Base and wall units and the worktop
  • Sink, tap and extractor hood
  • Task lighting and general lighting
  • Fitting and integration of appliances you supply
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Appliances, other than those itemised in your quote
  • Pans, crockery and small accessories
  • Opening the kitchen into the living room, unless itemised
  • Relocating the boiler or the gas installation, unless planned
  • Council taxes and fees where they apply
  • Loose furniture and decoration

VAT (10% or 21% depending on your case) is always shown as its own line. If you are supplying the appliances we will fit and integrate them — just tell us the models before we design the units, because a freestanding fridge and an integrated one need different openings.

In the same town

Other services in Cerdanyola del Vallès

The same team and the same fixed quote, for the rest of the home in Cerdanyola del Vallès.

The same work, elsewhere

Kitchen renovations in other cities

Each city has its own housing stock, its own buildings and its own permits.

Common questions

Frequently asked questions

Kitchen renovations in Cerdanyola del Vallès: what you really ask us.

How much does it cost to renovate a kitchen in Cerdanyola?

A complete functional kitchen usually runs from 4,800 to 7,500 € excluding VAT, and at mid-range from 6,600 to 10,300 € excluding VAT; these are guide figures, not an offer. In a block flat of the 60s–70s, renewing plumbing, drains and electrics weighs more than choosing the units. After the free visit we give you the quote fixed, item by item.

Do you do full kitchen renovations in Cerdanyola?

Yes. A full kitchen renovation includes demolition, new services, tiling and flooring, units, worktop, appliances and finishing touches, with one crew and a quote item by item. If you want to renovate kitchen and bathroom together, which is common in Cerdanyola del Vallès, they are coordinated in the same job, saving time on site and disruption for the neighbours.

Which materials stand up to a rental flat with students?

Those that forgive: a quartz or porcelain worktop, smooth fronts without mouldings, quality hinges and runners with soft close and a floor that does not absorb grease. We avoid what splinters or swells with damp, and matt finishes that show every fingerprint. It costs a little more at the start and saves you from redoing the kitchen after a few years.

Can I switch from gas to induction in my Cerdanyola flat?

In most cases, yes. The contracted power has to be checked, a circuit of its own run for the kitchen and legalised with an electrical certificate. If the consumer unit is old and has no earth, it is updated in the same job. We also handle the gas disconnection. In return, the kitchen ends up with no visible pipes and is easier to clean.

Can the kitchen be opened to the dining room in a block flat?

Almost always. What decides it is the wall: if it is a partition, it is knocked down and finished; if it is load-bearing, it is opened all the same, with a calculated lintel and a technical project. Opening the kitchen or taking in the gallery is what changes a flat of 65 to 90 m² the most. We check it on the visit, before drawing anything.

How long does the job take, and can it be done between tenants?

A complete kitchen takes two to four weeks depending on the scope. If the flat is let, the start and handover dates are fixed with you in writing so that it fits between one contract and the next. We agree noise hours with the community and protect the staircase and the lift, so the job is not noticed on the landing.

Do I need permission from the Ajuntament to renovate the kitchen?

A kitchen that does not touch the structure goes by prior notification at Cerdanyola’s Ajuntament, and we file it ourselves. If a load-bearing partition comes down, a technical project is needed. If there is a skip on the public highway, we also handle the occupation permit. We go over it all on the visit, before quoting.

I am looking for a kitchen renovation (reforma de cuina) in Cerdanyola and I do not speak Spanish or Catalan: can you still help?

Yes. The renovation is the same however you ask for it: we measure, give you a quote fixed item by item and set the start and handover dates. Quote, updates and handover can be in English. We renovate kitchens in Cerdanyola del Vallès, from the Centre, Serraparera or Fontetes to Bellaterra, and the technical visit is free and commits you to nothing, with the measuring and the quote item by item.

Free quote

Get your kitchen quote in Cerdanyola del Vallès

Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →