Black kitchen renovation in Vallcarca, Barcelona

Avinguda de Vallcarca, Barcelona · 9 m² · 2026

Black kitchen with a marble island and herringbone oak parquet

Project details

Floor area
9 m²
Property type
Flat
Duration
7 weeks
Year
2026
Status
Completed
Budget
16,500–17,500 €
What we did
Herringbone oak parquet · Black kitchen with a marble island · Original columns and mouldings restored · Recessed lighting

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A stately flat with herringbone oak parquet and a black kitchen with a marble island, fitted between the original columns.

The columns and mouldings of this flat were not a problem to be solved: they were the reason for buying it. The kitchen was designed around them, not against them.

The oak parquet was laid in herringbone from wall to wall, the kitchen area included, so that the floor does not give away where one room ends and another begins. The fronts are matt black and the island was finished in marble, with the original columns framing it.

In this full renovation in Vallcarca the most expensive part cannot be seen: levelling an old floor enough to lay herringbone without it creaking.

The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.