Restoring old village houses in Cerdanyola del Vallès, and whole buildings for owners’ communities: structure, roof, façade and staircase, quoted item by item.
A village house in the old core of Cerdanyola is usually a party-wall home of old construction, with a single owner who decides. The first thing is to look at what you cannot see: the state of the floor, of the roof, of the damp at the base of the walls and of services that have almost never been touched since it was built. With that on the table, you decide what is kept and what is rebuilt. There is no catalogue price here, and anyone who gives you one without visiting the house is showing you a figure that is not theirs.
When renovating the house means renovating the interior and little else, the paperwork is short. As soon as the façade, the roof, a load-bearing wall or a floor come into it, it rises to a licence with a technical project and site supervision, and you should count weeks of processing before a brick is moved. We prepare it with registered technicians. If the plot falls within the Parc de Collserola area, we check it before quoting, because it may call for an additional report from the park.
The restoration of a building is a different trade, because the client is no longer a person but an owners’ community. Roof, façade, staircase, downpipes and service shafts are common elements, and none of it starts without the meeting’s agreement. We quote item by item so the neighbours can compare concrete figures rather than an opaque total, we explain the scope at the meeting and we put in writing what is in the job and what is out. That avoids half the arguments. How the levy is split and the programme of works are agreed too.
With a community, the logistics change: scaffolding, occupation of the public highway, access to the homes, agreed noise hours and a protected staircase for the duration. The documentation changes too, because in old buildings it pays to be clear about the state of the whole before choosing what to do; the building’s technical inspection, when it is due, is a good starting point. We work in the Centre, in Serraparera and Fontetes, and also in Bellaterra, which is a decentralised municipal entity with its own page on this site.

Indicative market ranges per square metre of floor area, VAT excluded. The final price is a fixed quote after the survey.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 520 – 650 €/m² | |
| Mid-range | Selected materials, best balance | 750 – 940 €/m² | |
| High specification / luxury | Premium materials and high-end interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Full renovation of the whole property, from functional to mid-range specification, VAT excluded.
One bathroom, one kitchen. The price per square metre is higher in a small home, because the kitchen and bathroom cost almost the same whether the flat is 45 or 90 m².
The most usual size, with a kitchen, one or two bathrooms and a new layout. This is the size where opening the kitchen into the living room pays off most.
More floor and wall surface to finish and, often, two full bathrooms. Worth checking the riser capacity before planning a second wet room away from the first.
Large flats and houses. The budget depends heavily on specification and layout, and heating and cooling become a real design decision.
These figures assume the structure is sound. If the survey finds damp, aluminosis-affected concrete or a roof at the end of its life, that is a separate priced item and we will tell you before you commit, not halfway through. Damp treatment and façade work are quoted on their own.
The scope of a turnkey full renovation, and the things that genuinely sit outside it.
VAT is shown as its own line: 10% where the property is a home at least two years old, 21% where it is not, or on work billed to a company. If you are buying the flat and renovating it before you move in, the dates matter — tell us the completion date and we will tell you which rate applies.
The same team and the same fixed quote, for the rest of the home in Cerdanyola del Vallès.
What you find inside an old house changes with the area and with the period it was built.
One team for the whole job, in Barcelona and across Catalonia.
Old houses and buildings in Cerdanyola: what people ask before starting.
As a guide, between 580 and 740 euros per square metre at functional standard, and between 860 and 1,090 euros per square metre at mid-range, always excluding VAT. It is a reference for housing, not an offer, and a house that needs the structure touched falls outside it: in an old house the figure is moved by what is found on opening up, such as floors, roof, damp or original services. After the free technical visit we give you a quote fixed item by item.
The square metre is misleading in old houses: a small house with the roof and structure to rebuild costs more per m² than a large one in good condition, so the same number is of very little use for comparing. What we can tell you early is which items will weigh in your case, and close the figure item by item after the visit and after opening trial holes where needed.
Almost always, structure and insulation. The floor, the roof and the damp at the base of the walls are checked, plumbing, electrics and drains are renewed, and the exposed façade is insulated from the inside. If the structure is not touched, a prior notification to the Ajuntament is enough. If a façade is opened, the roof replaced or a load-bearing wall altered, you need a licence with a technical project.
Yes, with one important difference: the client is the owners’ community. The meeting has to agree before starting, because roof, façade, staircase and shared services are common elements. We quote item by item so the neighbours can compare, and we agree scaffolding, public highway, noise hours and protection of the staircase during the works.
The timescales and the decision change. An owner approves and starts; a community needs a meeting, a comparable quote, a split of the levy and a clear contact during the works. The logistics change too: scaffolding, occupation of the public highway, access to the homes and a protected staircase.
It depends on what you touch. An interior renovation without structure is done with prior notification to Cerdanyola’s Ajuntament. If you open the façade, replace the roof, extend or touch the structure, you need a licence with a technical project and site supervision. If the plot is within the Parc de Collserola area, an additional report from the park may be needed. We check it before quoting.
Yes, although Bellaterra has its own page on this site, with its houses and villas among the woods: full renovations in Bellaterra. It is a decentralised municipal entity of Cerdanyola, with its own particularities. The technical visit is free and we tell you what has to be done and what is not worth touching.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.