Restoring an old house in the Vallès Occidental: what each type left by industry hides — casa de cós, owner’s building, converted textile mill or block — and what weighs on the quote.
The Vallès Occidental grew around textiles, and what you call an old house today is almost always explained by that history. Sabadell and Terrassa, the two capitals of the comarca, put up casas de cós for those who worked in the mills, roomier buildings for those who ran them and, decades later, blocks for the people who arrived to take jobs. Each type has its structure, its defects and its own way of getting dearer. Before looking at finishes it pays to know which one you have, because it decides what you will find when you open a wall.
The casa de cós is the traditional working-class home: narrow façade, long plan, party walls on both sides and a yard at the back. It has load-bearing masonry walls and timber or joist floors resting on them. What turns up is predictable: darkness in the middle of the house, damp at the foot of the wall on the ground floor, damaged beams at the bearings and services that nobody has renewed. What weighs most in the quote is the structure, not the kitchen. That is why here it is calculated after opening trial holes, never from a photograph.
The owner’s building, in the ensanche of the early twentieth century, is something else: wider, with high ceilings, courtyards and sometimes Modernista features. It is usually better built, and the work goes into deciding what is kept: joinery, encaustic tiles, sgraffito. If any of it is protected, the Ajuntament asks for the authorisation. Converted mills and industrial sheds are a third case, with change of use, structure and insulation to resolve. And the blocks of the 60s to 80s, in Rubí, Cerdanyola, Barberà or Ripollet, do not call for restoring structure but for renewing services and re-planning.
With that classification you can place yourself before getting into your municipality, which is where the procedure and the detail of each neighbourhood are settled. We always begin the same way: a visit to identify the type of building, look at the roof, floors and walls, and decide where it pays to open up. Then comes the quote fixed item by item. And if what you have is really an old flat, we tell you at the visit, because the job and the price are quite a lot more contained than those of a whole house.

Indicative market ranges per square metre of floor area, VAT excluded. The final price is a fixed quote after the survey.
| Specification | What it covers | Per m² (excl. VAT) | |
|---|---|---|---|
| Functional | Standard finishes, practical solution | 520 – 650 €/m² | |
| Mid-range | Selected materials, best balance | 750 – 940 €/m² | |
| High specification / luxury | Premium materials and high-end interior design | 1,060 – 1,340 €/m² |
Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.
Full renovation of the whole property, from functional to mid-range specification, VAT excluded.
One bathroom, one kitchen. The price per square metre is higher in a small home, because the kitchen and bathroom cost almost the same whether the flat is 45 or 90 m².
The most usual size, with a kitchen, one or two bathrooms and a new layout. This is the size where opening the kitchen into the living room pays off most.
More floor and wall surface to finish and, often, two full bathrooms. Worth checking the riser capacity before planning a second wet room away from the first.
Large flats and houses. The budget depends heavily on specification and layout, and heating and cooling become a real design decision.
These figures assume the structure is sound. If the survey finds damp, aluminosis-affected concrete or a roof at the end of its life, that is a separate priced item and we will tell you before you commit, not halfway through. Damp treatment and façade work are quoted on their own.
The scope of a turnkey full renovation, and the things that genuinely sit outside it.
VAT is shown as its own line: 10% where the property is a home at least two years old, 21% where it is not, or on work billed to a company. If you are buying the flat and renovating it before you move in, the dates matter — tell us the completion date and we will tell you which rate applies.
The comarca gives the context; each municipality has its own housing stock and its own council.
One team for the whole job, in Barcelona and across Catalonia.
Restoring an old house in the Vallès Occidental: what you ask us most.
We do not give a figure per square metre for an old house, because it would be invented: the price is set by the structure, not the floor area. As a reference, a full renovation of a flat in the comarca runs from 520 to 650 €/m² at functional standard, excluding VAT, and it is only a guide. A casa de cós with floors or roof to rebuild falls outside that range. We fix the quote item by item after the visit and the trial holes.
It starts with the diagnosis, not with the finishes. The roof, floors, load-bearing walls and damp on the ground floor are checked, and with that you separate what holds as it is, what has to be reinforced and what has to be replaced. Then come the new services, with their electrical certificate, and finally the finishes. If a load-bearing wall is opened, it is done with propping, a calculated lintel and a technical project.
It is the narrow, deep home between party walls typical of the old cores of Sabadell and Terrassa. It bears on its own walls, not on a skeleton of columns, and every wall you want to move is a structural conversation. In a flat almost all the work is inside. In a casa de cós you also have to look at the roof, floors, yard and foot of the wall.
The worker’s house asks mostly for structure and light. The owner’s building, from the ensanche, is usually well built and asks for judgement to keep what gives it character. The converted mill or shed demands change of use, structure and insulation, and is only possible if the planning allows it. They are three different quotes even though all three are called restoration.
Almost always on what you cannot see: timber floors attacked at the bearings, a roof that has leaked for years, broken buried drainage, rising damp and original electrics. Those items move the total more than any finish. That is why the right order is to open trial holes first and put a price on it afterwards, never the other way round.
It depends on what is touched. An interior renovation with no structure is usually dealt with by prior notification. If a façade is opened, the roof replaced or a load-bearing wall or a floor touched, you need a licence with a technical project. Each council in the comarca has its own procedure, and we specify it for your municipality at the visit. We take care of filing everything.
No. A flat in the ensanche or in a block does not have its own structure to recover: plumbing, drainage and electrics with their certificate are renewed, insulation is improved and the layout is changed if needed. It is a more contained job and easier to quote. If you are not sure what you have, at the visit we tell you which of the two cases it is.
Across the comarca: Sabadell, Terrassa, Rubí, Cerdanyola del Vallès, Barberà del Vallès and the rest of the municipalities. Each has its own page with the type of house and that council’s procedure. If yours is not there, write to us all the same: the technical visit is free and the diagnosis is the same.
Practical guides to prices, materials, permits and the decisions that come up on site — so you can plan your flat refurbishment with your eyes open.
10,000 € buys a bathroom or a kitchen; a 60 m² flat starts at 34,400 € at functional level. What each budget covers up to 150,000 €, before VAT.
Read the article →Guides and adviceWhat a technical architect (aparejador) charges in Spain in 2026: fee percentages, fixed prices, what drives the cost and when hiring one is compulsory.
Read the article →Full renovationsWhat an architect charges for a renovation in 2026: typical rates, fees as a share of the PEM budget and how to keep the total under control.
Read the article →Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.