Renovations · Sabadell

Old house restoration in Sabadell

Renovating old houses in Sabadell: casas de cós between party walls, with load-bearing walls, floors and rising damp. What gets opened up, what gets propped and what gets replaced.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Full home renovation

Renovating a casa de cós means working on its walls.

The old house in the historic fabric of Sabadell is almost always a casa de cós: a narrow façade, a very deep plan, party walls on both sides and a yard at the back. All the weight is carried by load-bearing masonry walls, and the floors rest on them, on joists or on timber. That is why a renovation does not begin by choosing finishes: it begins with a visit to see where the walls bear, what state the floors are in and where the water gets in.

The typical problem is darkness. With two blind party walls, the rooms in the middle of the house get no light from anywhere. The usual answer is to open up the central bay: it is propped, the load-bearing wall is cut and a steel lintel calculated by a technician is fitted, with its project. It is done in phases, with the house stabilised at each one. If we would open up less than you ask for, we say so, because some walls are better left as they are.

The floors are looked at one by one. In timber floors we look for rot where the beams bear on the wall and for wood-boring insects; in joist-and-block floors, loose infill blocks and rusted reinforcement. The damaged section is reinforced or replaced, or the whole floor is rebuilt, depending on what turns up. And the rising damp that climbs from the ground at the foot of the wall is not covered with paint: it is cut off with a barrier treatment, the void is ventilated and the wall finish is redone.

If the house has Modernista features, such as sgraffito, encaustic tiles or joinery worth keeping, we decide with you what is restored and what is modernised, and we apply for the authorisation when any of it is protected. The services are renewed in full, with a new electrical certificate. We fix the quote item by item after opening trial holes and seeing the real state of the structure, not before, because a house like this cannot be priced properly from a photograph.

Room in an old flat with no furniture, terrazzo floor, a white radiator under a wooden shelf, a glass-panelled door and a large sliding door on the left
Prices

What a full renovation costs.

Indicative market ranges per square metre of floor area, VAT excluded. The final price is a fixed quote after the survey.

What a full renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversPer m² (excl. VAT)
FunctionalStandard finishes, practical solution520 – 650 €/m²
High specification / luxuryPremium materials and high-end interior design1,060 – 1,340 €/m²
Indicative prices · VAT not included. A full renovation of an 80–100 m² home typically lands between 41,300 and 103,000 € depending on specification. What moves the number is not the paint. It is how many wet rooms you have, whether the layout changes, and whether the building can take it. A flat where the kitchen and bathroom stay put sits at the bottom of each band; moving both, plus opening a load-bearing wall with a calculated steel, sits at the top. VAT is 10% on a renovation of a home that has been built and occupied for at least two years, and 21% otherwise — we show it as its own line so you can check which applies to you.
Calculator

What might your renovation cost?

Floor area80 m²
20 m²300 m²
Indicative estimate41,300 – 52,100 €Functional · 80 m²
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by floor area.

Full renovation of the whole property, from functional to mid-range specification, VAT excluded.

Studio or one-bedUp to 60 m²31,400 – 63,000 €

One bathroom, one kitchen. The price per square metre is higher in a small home, because the kitchen and bathroom cost almost the same whether the flat is 45 or 90 m².

Two-bed flat60 – 90 m²34,400 – 78,600 €

The most usual size, with a kitchen, one or two bathrooms and a new layout. This is the size where opening the kitchen into the living room pays off most.

Three-bed flat90 – 120 m²43,300 – 111,800 €

More floor and wall surface to finish and, often, two full bathrooms. Worth checking the riser capacity before planning a second wet room away from the first.

Large flat or houseOver 120 m²From 61,100 €

Large flats and houses. The budget depends heavily on specification and layout, and heating and cooling become a real design decision.

These figures assume the structure is sound. If the survey finds damp, aluminosis-affected concrete or a roof at the end of its life, that is a separate priced item and we will tell you before you commit, not halfway through. Damp treatment and façade work are quoted on their own.

No small print

What is included and what is not.

The scope of a turnkey full renovation, and the things that genuinely sit outside it.

✓ Included in the price

  • Strip-out, clearance, skips and skip permits
  • New water supply and waste runs throughout
  • New consumer unit, circuits and earthing, with electrical certificate
  • Extraction and ventilation to kitchen and bathrooms
  • New partitions and the agreed layout
  • Levelling, plastering and making good
  • Flooring throughout
  • Bathrooms: waterproofing, tiling, sanitaryware and brassware
  • Kitchen: units, worktop, sink, tap and extractor
  • Internal doors, skirting and fitted wardrobe carcasses
  • Two coats of paint throughout
  • Sockets, switches and light fittings
  • Permit filing and the submission to the residents’ association
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Appliances, unless listed in your quote
  • Loose furniture, blinds and decoration
  • Structural work — steels, slabs, underpinning — priced separately once calculated
  • Façade, roof and communal areas, which belong to the building, not the flat
  • Damp or concrete repair found during the strip-out
  • Air conditioning, unless listed in your quote
  • Council taxes and fees where they apply
  • Architect’s fees where a full project is legally required

VAT is shown as its own line: 10% where the property is a home at least two years old, 21% where it is not, or on work billed to a company. If you are buying the flat and renovating it before you move in, the dates matter — tell us the completion date and we will tell you which rate applies.

In the same town

Other services in Sabadell

The same team and the same fixed quote, for the rest of the home in Sabadell.

The same work, elsewhere

Old house restoration in other areas

What you find inside an old house changes with the area and with the period it was built.

Common questions

Frequently asked questions

Renovating an old house in Sabadell: answers from site.

What does restoring an old house in Sabadell include?

It depends on what the trial holes show, but it almost always includes checking the load-bearing walls and floors, treating rising damp, renewing the electrics and plumbing, and redoing the wall finishes. If the central bay is opened up to bring in light, it is propped and a calculated lintel is fitted. What we do not do is offer a closed full-renovation price without having seen the structure.

Can a village house in Sabadell be renovated and opened up to let light in?

Almost always, yes. In a casa de cós, light is gained by opening the central bay or the passage to the yard at the back. If the wall is load-bearing, it is opened with temporary props and a calculated lintel, and it needs a technical project and a licence. It is worth checking first which walls are load-bearing and which merely divide, because that cannot be judged by eye.

How much does it cost per square metre to restore an old house in Sabadell?

We do not give a price per square metre that holds for every house, because in an old house the item that weighs most is the one you cannot see: floors, walls and damp. A full flat renovation is not comparable with restoring a structure. After the technical visit and the trial holes, we give you a quote fixed item by item, excluding VAT.

How is rising damp treated in an old house?

Rising damp climbs the wall from the ground and shows at the skirting, with salts and render that falls off. It is cut off with a barrier treatment at the foot of the wall, the damaged finish is removed, whatever needs ventilating is ventilated and the wall is re-rendered with a breathable material. Painting over it only hides it for a few months.

What if my old home in Sabadell is a flat, not a house?

The approach changes. In an old flat in the centre, the work falls on the services, the partitions, the floors and, if the building allows it, on opening up the layout. In an old flat the structure belongs to the whole building and is not touched without sign-off from the building’s technician. We tell you at the visit what can be opened and what cannot.

Do I need a project and a licence to restore an old house?

If you touch load-bearing walls, floors or the façade, yes: a project signed by a competent technician and a works licence from Sabadell’s Ajuntament. If the work is interior only and does not involve the structure, prior notification is usually enough. Either way we handle the paperwork, and we warn you if an element is protected and needs additional authorisation.

Can you keep the Modernista features in my house?

Yes. Sgraffito, encaustic tiles, mouldings and old joinery are restored when they have value and replaced when they are lost. We decide with you what is kept, and if an element is protected we apply for the authorisation before touching it. The only thing we advise against is covering sgraffito with plasterboard for convenience.

How long does a restoration like this take, and can I live in the house?

A restoration involving the structure takes months, not weeks, and we fix the exact timescale after the trial holes. Living in the house is not realistic while it is being propped, a load-bearing wall is cut or a floor is rebuilt. If the work is interior only and does not touch the structure, it can sometimes be done in phases, but we assess that case by case.

Free quote

Get your old house restoration quote in Sabadell

Free survey anywhere in Catalonia, in English, and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →