Renovations · Sabadell

Kitchen renovations in Sabadell

We design and renovate kitchens in Sabadell — from opening the kitchen to the living room to renewing services, units and appliances — adapting to casas de cós, modernista buildings and residential blocks. A fixed quote in writing and a site manager from start to finish.

Fixed written quote
Fixeda written, itemised quote
One site managera single point of contact for the whole job
Freesite visit anywhere in Catalonia
Warrantyon the work
Kitchen renovation

Renovating the kitchen in Sabadell.

Renovating the kitchen in Sabadell is much more than changing the units: we renew plumbing, drainage and electrics, adjust the layout to gain worktop and storage space, and choose worktops, wall finishes and appliances that stand up to daily use. In Sabadell the usual job is working with casas de cós, modernista buildings and residential blocks, so we study each kitchen on its own.

We take care of everything with a single point of contact: demolition, building work, services, tiling, made-to-measure units and commissioning, with a fixed quote after the free technical visit and a written guarantee on the work. If the bathroom is due as well, we do it in the same job so the floor is lifted only once — that is how we set it out in bathroom renovations — and with the budget calculator you have a first range before we come to measure.

Linear kitchen with wooden worktop, black induction hob, stainless steel sink under the window and built-in microwave
Prices

What a kitchen renovation costs.

Indicative ranges by specification and appliances, VAT excluded. The final figure comes from the survey.

What a kitchen renovation costs — Indicative prices · VAT not included
SpecificationWhat it coversIndicative range (€)
FunctionalStandard finishes, practical solution4,800 – 7,500 €
Design / high endPremium materials and high-end interior design13,300 – 19,500 €
Indicative prices · VAT not included. The kitchen is the room where the range is widest, because appliances, the worktop and the units can multiply the cost on an identical layout. Opening the kitchen into the living room typically adds 1,500 to 4,000 € depending on the wall and whether it carries load. We itemise all of it so you can choose where the money goes.
Calculator

What might your new kitchen cost?

Indicative estimate4,800 – 7,500 €Functional · Medium (8–12 m²)
Request a free quote →

Indicative only. VAT excluded. The final figure is a fixed written quote after the free survey.

Price by size

What it costs by kitchen size.

Indicative ranges for a full kitchen renovation, VAT excluded.

Small kitchenUp to 8 m²4,800 – 17,400 €

The galley kitchen of a city flat. Made-to-measure storage is what makes these work, and it is where the budget should go.

Medium kitchen8 – 14 m²5,000 – 18,600 €

The most common size. Enough room for a breakfast bar or a peninsula and a proper run of worktop.

Large kitchenOver 14 m²5,900 – 19,500 €

Island and dining space. At this size the design and the appliances set the price, not the square metres.

Opened into the living roomOpen-planFrom 15,000 €

The single change that transforms a flat most. Add the partition and structural item on top of the kitchen itself.

In a kitchen the floor area matters less than the material grades, the worktop and the appliances. That is why we price a specific design rather than a rate per square metre — and why the quote names what is in it.

No small print

What is included and what is not.

The scope of a turnkey kitchen renovation, and what normally sits outside it.

✓ Included in the price

  • Strip-out, clearance and removal of the old kitchen
  • New water supply, waste runs and extraction duct
  • Dedicated appliance circuits with electrical certificate
  • Splashback tiling or cladding, and the floor
  • Base and wall units and the worktop
  • Sink, tap and extractor hood
  • Task lighting and general lighting
  • Fitting and integration of appliances you supply
  • Snagging and a written warranty

✕ Not included — quoted separately

  • Appliances, other than those itemised in your quote
  • Pans, crockery and small accessories
  • Opening the kitchen into the living room, unless itemised
  • Relocating the boiler or the gas installation, unless planned
  • Council taxes and fees where they apply
  • Loose furniture and decoration

VAT (10% or 21% depending on your case) is always shown as its own line. If you are supplying the appliances we will fit and integrate them — just tell us the models before we design the units, because a freestanding fridge and an integrated one need different openings.

In the same town

Other services in Sabadell

The same team and the same fixed quote, for the rest of the home in Sabadell.

The same work, elsewhere

Kitchen renovations in other cities

Each city has its own housing stock, its own buildings and its own permits.

Common questions

Frequently asked questions

Kitchen renovations in Sabadell: what you ask us most.

How much does it cost to renovate a kitchen in Sabadell?

In Sabadell, a complete kitchen with units and appliances usually runs from 4,800 to 19,500 € depending on floor area, specification and the condition of the services. The final price is fixed and in writing once we have seen the home.

Can I open the kitchen to the living room?

In most cases yes. We check what is partition and what is load-bearing before touching anything; if it can be done, we join kitchen and living room to gain light and space, and we record it in the fixed quote.

What does your fixed quote include?

Everything, item by item: labour of every trade, materials, waste management, protection of communal areas, site-manager coordination and the final clean. What you sign is what you pay.

Can you keep the modernista features of a building in Sabadell?

Yes. We restore joinery, mouldings and other features of value and, if the building is protected, we handle the heritage authorisation to touch the façade or communal elements.

Free quote

Get your kitchen quote in Sabadell

Free survey anywhere in Catalonia and a fixed written quote. We reply within 24 hours.

Your details

Your project

Where it is

Budget and timing

Tell us more

How you would like us to get in touch

Reply within 24 working hours · Free site visit · No obligation

✆ Call✦ WhatsAppGet a quote →