Kitchens renovated in Premià de Mar
Carrer de Sant Pere, Premià de Mar · 10 m² · 2026

Project details
- Floor area
- 10 m²
- Property type
- Flat
- Duration
- 6 weeks
- Year
- 2026
- Status
- Completed
- Budget
- 9,500–11,200 €
- What we did
- Complete kitchen replacement · Granite and compact laminate worktops · Integrated appliances · Tiling and flooring · Hoods and extraction
Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.
About this renovation
Kitchens replaced from start to finish: new units, granite or compact laminate worktops, integrated appliances and extraction sorted out.
A kitchen is changed entirely or not at all: new units over an old installation last as long as it takes the first drain to fail. In all of these, what is behind was redone — plumbing, drains, electrical points and extraction — before a single unit was fitted.
The worktops are granite or compact laminate depending on the case, the appliances are integrated and the hood was given a real outlet to the outside whenever the building allowed it, which is what separates a kitchen that smells good from one that only recirculates the air.
Kitchen renovations in Premià de Mar and the surrounding area: jobs of a few weeks, with the home occupied and the kitchen out of service for as little time as possible.
The figures on this page (area, duration and budget) are guide estimates and the location is approximate: they are not the final data for this job.