Completed

Kitchen renovation on Passeig de Gràcia, Barcelona

Passeig de Gràcia, Barcelona · 10 m² · 2025

Kitchen front with a fridge column, an under-counter oven, a ceramic hob and a sink under the window

Project video

Transcoding test
Chunked test

Project details

Floor area
10 m²
Property type
Flat
Year
2025
Status
Completed
Budget
7,500–9,500 €
What we did
Kitchen furniture · Worktop · Plumbing · Electrics · Appliances · Peninsula

Indicative prices · VAT not included. Not a binding offer; every project is quoted after the site visit.

About this renovation

A closed 21 m² kitchen opened up to the living room with a peninsula, keeping the original terracotta floor.

The kitchen was closed off and swallowed the light coming in from the living room. The first thing we decided with the owners was to take down the stretch of partition that was not structural and resolve the separation with a peninsula, which also gave them the breakfast bar they were asking for. You can now see the terrace from the sink.

The furniture has plain light-grey fronts, with no handles, a tall column for the fridge and wall units up to the ceiling so as not to lose storage in a small kitchen. Above the worktop we left a glazed cabinet with a black frame: it is the only point of contrast and stops the front reading as a closed block of doors. The worktop is cement-effect and the sink is steel with a pull-out tap, which in 21 m² is appreciated daily.

We renewed the plumbing and the electrical installation in the area, because what was there could not cope with the new appliances. The original terracotta floor we kept: it was in good condition and gives a character that a new porcelain would not have provided. It was five weeks of work with the owners living in the home, which in a kitchen renovation has a big say in the order of the jobs.